GEA-US 322-14.47
GEA County · est $1.1M
Bid dateThursday, December 2—
GEA County · est $1.1M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 30 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Karvo Companies INC | R3Kokosing Construction Company INC | R4Chagrin Valley Paving INC | % of bid |
|---|---|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 2,852 CY | $180 | $215 | $201 | $190 | 58% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A | — | $0.75 | $0.73 | $0.75 | $1.50 | 9% |
| 646E10010 EDGE LINE, 6" | 11.7 MILE | $3,015 | $3,015 | $3,015 | $3,015 | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 500 SY | $70.00 | $70.00 |
| Item | Quantity | R1Ronyak Paving INC | R2Karvo Companies INC | R3Kokosing Construction Company INC | R4Chagrin Valley Paving INC |
|---|---|---|---|---|---|
| 202E30001 WALK REMOVED, AS PER PLAN | 536 SF | $3.50 | $6.50 | $3.50 | $3.00 |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 376 SF | $10.50 | $14.25 | $10.50 | $10.00 |
| 608E52001 CURB RAMP, AS PER PLAN | 160 SF | $21.75 | $43.00 | $21.75 | $25.00 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 4 EACH | $625 | $900 | $625 | $450 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $95.00 |
| $90.00 |
| 4% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 388 CY | $75.00 | $72.00 | $40.00 | $50.00 | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 33 CY | $765 | $400 | $840 | $300 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $44,000 | $62,645 | $75,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $24,475 | $39,100 | $40,000 | $45,000 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 9,432 GAL | $2.00 | $2.15 | $2.30 | $2.00 | 2% |
| 646E10200 CENTER LINE | 5.85 MILE | $2,880 | $2,880 | $2,880 | $2,880 | 2% |
| 621E00100 RPM | 437 EACH | $29.76 | $29.76 | $0.75 | $29.76 | 1% |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 11.7 MILE | $900 | $900 | $900 | $900 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 10 EACH | $1,020 | $1,200 | $1,200 | $1,200 | 1% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $1,500 | $2,000 | $1,500 | $1,750 | 1% |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 11.7 MILE | $700 | $700 | $700 | $700 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,095 | $5,000 | $5,000 | $10,000 | 1% |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $325 | $375 | $1,900 | $400 | 1% |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 5.3 MILE | $1,200 | $1,200 | $1,200 | $2,875 | 1% |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $20.00 | $20.00 | $20.00 | $20.00 | 1% |
| 209E60501 LINEAR GRADING, AS PER PLAN | 11.8 MILE | $500 | $2,000 | $1,645 | $350 | 1% |
| 1 EACH |
| $780 |
| $1,000 |
| $780 |
| $550 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 5 EACH | $900 | $1,050 | $900 | $700 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $1,200 | $1,300 | $1,200 | $1,000 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $2.00 | $1.50 | $2.00 | $2.00 |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 5.3 MILE | $1,000 | $3,550 | $4,015 | $6,000 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 962 LB | $2.00 | $0.70 | $0.75 | $0.25 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 330 EACH | $1.00 | $2.00 | $7.00 | $1.00 |
| 646E10400 STOP LINE | 113 FT | $11.00 | $11.00 | $11.00 | $11.00 |
| 646E10500 CROSSWALK LINE | 530 FT | $5.00 | $5.00 | $5.00 | $5.00 |
| 646E20410 WORD ON PAVEMENT, 96", "XING" | 2 EACH | $190 | $190 | $190 | $190 |
| 646E20600 BIKE LANE SYMBOL MARKING | 2 EACH | $400 | $400 | $400 | $400 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $450 | $450 | $450 | $450 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $70.00 | $65.00 | $67.00 | $100 |
| 614E12460 WORK ZONE MARKING SIGN | 10 EACH | $80.00 | $80.00 | $80.00 | $80.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $110 | $250 | $100 | $500 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $900 | $900 | $900 | $900 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 5.85 MILE | $770 | $770 | $770 | $770 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 11.7 MILE | $500 | $500 | $500 | $500 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 113 FT | $3.00 | $3.00 | $3.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 113 FT | $2.90 | $2.90 | $2.90 | $2.90 |
| 614E27200 WORK ZONE CROSSWALK LINE, CLASS I, 642 PAINT | 530 FT | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E27620 WORK ZONE CROSSWALK LINE, CLASS III, 642 PAINT | 530 FT | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E31200 WORK ZONE WORD ON PAVEMENT, 72", CLASS I, 642 PAIN | 2 EACH | $60.00 | $60.00 | $60.00 | $60.00 |
| 614E31620 WORK ZONE WORD ON PAVEMENT, 72", CLASS III, 642 PA | 2 EACH | $60.00 | $60.00 | $60.00 | $60.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,625 | $3,000 | $6,372 | $500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E12001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, AS P | 2,852 CY | $180 | $513k | 54% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A | — | $0.75 | $79k | 8% |
| 646E10010 EDGE LINE, 6" | 11.7 MILE | $3,015 | $35k | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 500 SY | $70 | $35k | 4% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 388 CY | $75 | $29k | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 33 CY | $765 | $25k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $24,475 | $24k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 9,432 GAL | $2 | $19k | 2% |
| 646E10200 CENTER LINE | 5.85 MILE | $2,880 | $17k | 2% |