GEA-SR 87-12.51/VAR
GEA County · est $0.7M
Bid dateThursday, January 13—
GEA County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 26 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Chagrin Valley Paving INC | R3Shelly & Sands INC | R4Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 869 CY | $185 | $175 | $200 | $225 | 29% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (582 CY | $175 | $170 | $164 | $200 | 19% |
| 624E10000 MOBILIZATION | 1 LS | $49,810 | $49,500 | $20,000 | $43,000 | 9% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 500 SY | $70.00 | $50.00 | $50.00 | $100 |
| Item | Quantity | R1Ronyak Paving INC | R2Chagrin Valley Paving INC | R3Shelly & Sands INC | R4Karvo Companies INC |
|---|---|---|---|---|---|
| 209E60201 LINEAR GRADING, AS PER PLAN | 6.83 STA | $165 | $200 | $425 | $350 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $850 | $850 | $850 | $600 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT | 3,148 GAL | $2.00 | $3.00 | $3.00 | $3.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $26,145 | $75,000 | $55,000 | $50,000 | 5% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 2 | 20,728 SY | $1.25 | $1.50 | $2.75 | $1.85 | 5% |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 20 EACH | $1,150 | $1,400 | $1,400 | $1,200 | 4% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 19 EACH | $950 | $950 | $950 | $1,000 | 3% |
| 608E52001 CURB RAMP, AS PER PLAN | 975 SF | $16.25 | $20.50 | $20.50 | $18.00 | 3% |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 10 EACH | $1,025 | $1,100 | $1,100 | $1,100 | 2% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 5,000 LB | $2.00 | $2.00 | $2.00 | $2.00 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 21 CY | $450 | $300 | $430 | $400 | 2% |
| 646E10520 CROSSWALK LINE, 24" | 1,308 FT | $7.00 | $7.00 | $7.15 | $12.25 | 2% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $1,500 | $1,500 | $2,000 | $2,000 | 2% |
| 202E30000 WALK REMOVED | 1,805 SF | $4.85 | $3.00 | $3.00 | $5.00 | 2% |
| 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P | 75 CY | $115 | $150 | $250 | $300 | 2% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 21 EACH | $400 | $875 | $875 | $500 | 2% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 1,728 LB | $4.00 | $2.00 | $0.65 | $1.00 | 1% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 1 | 444 SY | $15.00 | $2.00 | $12.50 | $15.00 | 1% |
| 608E10000 4" CONCRETE WALK | 830 SF | $8.00 | $7.75 | $7.75 | $10.00 | 1% |
| 9 CY |
| $140 |
| $200 |
| $330 |
| $235 |
| 646E10010 EDGE LINE, 6" | 1.05 MILE | $5,200 | $5,200 | $3,255 | $3,850 |
| 646E10200 CENTER LINE, YELLOW | 0.93 MILE | $6,050 | $6,050 | $3,925 | $6,000 |
| 646E10400 STOP LINE | 50 FT | $12.00 | $12.00 | $13.00 | $15.00 |
| 646E10510 CROSSWALK LINE, 12" | 406 FT | $6.00 | $6.00 | $6.15 | $6.00 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $500 | $500 | $2,395 | $1,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $75.00 | $75.00 | $70.00 | $75.00 |
| 614E12460 WORK ZONE MARKING SIGN | 14 EACH | $85.00 | $85.00 | $110 | $85.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $400 | $900 | $1,100 | $900 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 1.86 MILE | $1,100 | $1,100 | $1,500 | $1,250 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.93 MILE | $900 | $900 | $1,500 | $1,250 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 2.1 MILE | $750 | $750 | $500 | $650 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 1.05 MILE | $625 | $625 | $500 | $650 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 100 FT | $3.00 | $3.00 | $3.00 | $3.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 50 FT | $2.90 | $2.90 | $3.00 | $3.50 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 812 FT | $1.40 | $1.40 | $1.50 | $3.00 |
| 614E27060 WORK ZONE CROSSWALK LINE, CLASS I, 24", 642 PAINT | 2,616 FT | $2.00 | $2.00 | $2.00 | $4.00 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 406 FT | $1.00 | $1.00 | $1.50 | $3.00 |
| 614E27260 WORK ZONE CROSSWALK LINE, CLASS III, 24", 642 PAIN | 1,308 FT | $1.00 | $1.00 | $2.00 | $4.00 |
| 630E97800 SIGNING, MISC.: ADDITIONAL SIGNS, GROUND MOUNTED, | 300 SF | $16.75 | $16.75 | $16.75 | $16.75 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,917 | $5,200 | $3,427 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,450 | $50.00 | $2,000 | $1,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 869 CY | $185 | $161k | 26% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (582 CY | $175 | $102k | 17% |
| 624E10000 MOBILIZATION | 1 LS | $49,810 | $50k | 8% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 500 SY | $70 | $35k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $26,145 | $26k | 4% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 2 | 20,728 SY | $1.25 | $26k | 4% |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 20 EACH | $1,150 | $23k | 4% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 19 EACH | $950 | $18k | 3% |
| 608E52001 CURB RAMP, AS PER PLAN | 975 SF | $16.25 | $16k | 3% |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 10 EACH | $1,025 | $10k | 2% |