MEG-CR 163-00.47
MEG County · est $0.4M
Bid dateThursday, January 13—
MEG County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 25 more items below.
| Item | Quantity | R1D G M INC | R2Alan Stone CO INC | R3George J Igel & CO INC | R4Complete General Construction Company | R5Shelly & Sands INC | R6R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 6 EACH | $18,350 | $18,000 | $20,000 | $17,500 | $17,470 | $22,500 | 29% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 37 CY | $1,150 | $1,500 | $1,150 | $950 | $1,900 | $1,200 | 11% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 50 CY | $700 | $800 |
| Item | Quantity | R1D G M INC | R2Alan Stone CO INC | R3George J Igel & CO INC | R4Complete General Construction Company | R5Shelly & Sands INC | R6R C Construction Company And Son INC |
|---|---|---|---|---|---|---|---|
| 209E60500 LINEAR GRADING | 0.05 MILE | $5,000 | $12,000 | $69,000 | $50,000 | $28,000 | $2,000 |
| 606E13001 GUARDRAIL, TYPE 5, AS PER PLAN | 75 FT | $37.00 | $29.80 | $29.80 | $29.80 | $27.00 | $55.00 |
| 606E13001 GUARDRAIL, TYPE 5, AS PER PLAN, ON 10' RADIUS | 12.5 FT | $43.00 | $37.20 | $37.20 | $37.20 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,000 |
| $1,030 |
| $1,100 |
| $750 |
| 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 114 CY | $260 | $210 | $250 | $205 | $205 | $325 | 8% |
| 517E72300 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 137.5 FT | $195 | $160 | $160 | $155 | $165 | $157 | 7% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 350 FT | $58.00 | $48.00 | $45.00 | $35.00 | $36.00 | $55.00 | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 8,984 LB | $2.00 | $3.00 | $2.00 | $2.00 | $2.00 | $3.00 | 5% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $17,500 | $20,000 | $50,000 | $25,000 | $45,000 | $12,500 | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $13,000 | $5,000 | $500 | $10,000 | $1,400 | $3,500 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 28 CY | $315 | $470 | $300 | $470 | $470 | $525 | 2% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 82 CY | $105 | $140 | $200 | $175 | $290 | $155 | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 98 CY | $80.00 | $80.00 | $80.00 | $100 | $110 | $125 | 2% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $7,000 | $10,500 | $10,000 | $11,000 | $16,000 | $35,000 | 2% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $7,000 | $4,500 | $1,500 | $4,000 | $5,000 | $35,000 | 2% |
| 606E25001 ANCHOR ASSEMBLY, TYPE A, AS PER PLAN | 3 EACH | $2,125 | $1,485 | $1,485 | $1,485 | $1,600 | $1,500 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $6,000 | $19,000 | $10,000 | $10,000 | $20,000 | $15,000 | 2% |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 3 EACH | $1,950 | $1,300 | $1,230 | $1,230 | $950 | $750 | 2% |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 24 EACH | $170 | $200 | $180 | $550 | $157 | $250 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $5,000 | $2,500 | $5,000 | $2,700 | $15,000 | 1% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $3,500 | $3,000 | $8,000 | $7,000 | $6,000 | $7,500 | 1% |
| $30.00 |
| $60.00 |
| 606E17291 GUARDRAIL, TYPE 5, LONG-SPAN, AS PER PLAN | 1 FT | $1,825 | $62.00 | $62.00 | $62.00 | $50.00 | $65.00 |
| 606E20000 FLARED END SECTION | 1 EACH | $100 | $58.00 | $58.00 | $58.00 | $70.00 | $250 |
| 659E10000 SEEDING AND MULCHING | 891 SY | $3.00 | $2.50 | $5.00 | $3.25 | $3.25 | $10.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.08 TON | $800 | $650 | $800 | $800 | $800 | $1,200 |
| 659E31000 LIME | 0.18 ACRE | $100 | $800 | $80.00 | $80.00 | $80.00 | $800 |
| 659E35000 WATER | 7 MGAL | $1.00 | $0.01 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 100E44000 PREMIUM FOR SPECIAL HAZARD INSURANCE | 1 LS | $500 | $500 | $1,000 | $30,000 | $1,000 | $15,000 |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 419 SY | $5.00 | $7.00 | $3.50 | $30.00 | $14.00 | $35.00 |
| 204E10000 SUBGRADE COMPACTION | 509 SY | $5.00 | $2.50 | $3.00 | $5.00 | $3.25 | $2.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 33.2 FT | $10.00 | $35.00 | $2.00 | $25.00 | $25.00 | $50.00 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 2.3 CY | $150 | $300 | $350 | $750 | $120 | $125 |
| 407E10000 TACK COAT | 51 GAL | $5.00 | $2.00 | $5.00 | $1.85 | $1.85 | $15.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $22,000 | $17,000 | $2,500 | $16,550 | $16,550 | $16,550 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 310 FT | $10.00 | $10.00 | $20.00 | $45.00 | $41.00 | $25.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 58.2 SY | $15.00 | $50.00 | $22.00 | $22.00 | $23.29 | $50.00 |
| 512E33000 TYPE 2 WATERPROOFING | 21 SY | $30.00 | $30.00 | $41.00 | $36.00 | $38.11 | $35.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 25 SF | $15.00 | $2.00 | $8.00 | $15.00 | $8.77 | $25.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 24 EACH | $35.00 | $25.00 | $34.00 | $75.00 | $36.00 | $20.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 120 FT | $20.00 | $20.00 | $25.00 | $14.00 | $14.00 | $25.00 |
| 507E00410 STEEL PILES, MISC.: SPECIAL - PILE SPLICING | 1 EACH | $50.00 | $500 | $365 | $500 | $150 | $750 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $7,000 | $4,500 | $3,000 | $10,700 | $12,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12050 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 6 EACH | $18,350 | $110k | 27% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 37 CY | $1,150 | $43k | 10% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 50 CY | $700 | $35k | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 114 CY | $260 | $30k | 7% |
| 517E72300 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 137.5 FT | $195 | $27k | 7% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 350 FT | $58 | $20k | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 8,984 LB | $2 | $18k | 4% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $17,500 | $18k | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $13,000 | $13k | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 28 CY | $315 | $9k | 2% |