CUY-Ashton Lane Bridge
CUY County · est $0.7M
Bid dateThursday, January 27—
CUY County · est $0.7M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 51 more items below.
| Item | Quantity | R1Fabrizi Trucking & Paving CO INC | R2Union Industrial Contractors INC | R3Lockhart Concrete CO | R4Eclipse CO LLC | R5Schirmer Construction LLC | R6Kenmore Construction CO INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 43 FT | $3,265 | $2,750 | $5,380 | $3,400 | $3,300 | $4,500 | 32% |
| 517E75120 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 125 FT | $465 | $230 | $165 | $604 | $175 | $425 | 13% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 20,086 LB | $2.10 | $1.65 |
| Item | Quantity | R1Fabrizi Trucking & Paving CO INC | R2Union Industrial Contractors INC | R3Lockhart Concrete CO | R4Eclipse CO LLC | R5Schirmer Construction LLC | R6Kenmore Construction CO INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $7,500 | $15,000 | $7,500 | $5,000 | $10,000 |
| 202E23000 PAVEMENT REMOVED | 43 SY | $18.00 | $30.00 | $20.00 | $15.00 | $50.00 | $25.00 |
| 202E30000 WALK REMOVED | 948 SF | $1.50 | $2.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.17 |
| $4.00 |
| $1.85 |
| $2.00 |
| 10% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 78 CY | $380 | $450 | $1,000 | $717 | $750 | $688 | 7% |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE (WINGWALLS) | 28 CY | $975 | $925 | $1,300 | $1,923 | $850 | $2,000 | 6% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $21,000 | $60,000 | $35,000 | $29,000 | $114,000 | $70,000 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 46 CY | $250 | $250 | $230 | $181 | $260 | $250 | 3% |
| 511E44111 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 26 CY | $440 | $580 | $1,500 | $1,060 | $1,400 | $920 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,900 | $20,000 | $15,000 | $25,747 | $20,000 | $20,000 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $50,000 | $30,000 | $17,000 | $12,000 | $100,000 | 2% |
| 601E32201 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, AS PE | 57 CY | $175 | $400 | $139 | $177 | $175 | $230 | 2% |
| 608E10000 4" CONCRETE WALK | 1,253 SF | $7.00 | $14.00 | $6.22 | $15.00 | $10.00 | $12.00 | 2% |
| 611E10400 24" CONDUIT, TYPE B | 41 FT | $205 | $100 | $135 | $180 | $150 | $195 | 2% |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 2 EACH | $3,925 | $3,200 | $6,300 | $4,500 | $3,800 | $2,900 | 2% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 415 CY | $18.00 | $120 | $40.00 | $49.00 | $105 | $140 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $7,000 | $7,500 | $4,065 | $7,042 | $5,000 | $7,500 | 2% |
| 611E05900 15" CONDUIT, TYPE B | 45 FT | $150 | $75.00 | $95.00 | $108 | $110 | $145 | 2% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 135 FT | $45.00 | $70.00 | $32.95 | $59.00 | $50.00 | $35.00 | 1% |
| 511E53012 CLASS QC2 CONCRETE, MISC.: (HEADWALL) | 6 CY | $1,005 | $1,050 | $1,500 | $1,452 | $3,200 | $1,200 | 1% |
| 512E33010 TYPE 3 WATERPROOFING | 147 SY | $40.00 | $40.00 | $30.65 | $50.00 | $45.00 | $35.00 | 1% |
| $1.00 |
| $4.00 |
| $2.00 |
| 202E32500 CURB AND GUTTER REMOVED | 78 FT | $8.00 | $20.00 | $4.00 | $8.00 | $18.00 | $5.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 106 FT | $1.00 | $40.00 | $25.00 | $31.00 | $30.00 | $35.00 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $50.00 | $750 | $200 | $403 | $1,000 | $200 |
| 203E10000 EXCAVATION | 100 CY | $8.00 | $27.00 | $20.00 | $21.00 | $50.00 | $30.00 |
| 203E20000 EMBANKMENT | 287 CY | $6.00 | $30.00 | $35.00 | $27.00 | $40.00 | $5.00 |
| 204E10000 SUBGRADE COMPACTION | 267 SY | $4.00 | $4.00 | $3.00 | $1.00 | $3.00 | $3.00 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $200 | $100 | $300 | $53.00 | $25.00 | $150 |
| 659E00300 TOPSOIL | 6 CY | $65.00 | $200 | $199 | $103 | $300 | $75.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 52 SY | $45.00 | $5.00 | $24.00 | $60.00 | $25.00 | $24.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 3 SY | $5.00 | $10.00 | $35.00 | $9.00 | $15.00 | $35.00 |
| 659E15000 INTER-SEEDING | 3 SY | $5.00 | $1.00 | $35.00 | $2.00 | $15.00 | $35.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.01 TON | $600 | $1,000 | $5,000 | $1,694 | $1,000 | $5,000 |
| 659E31000 LIME | 0.01 ACRE | $500 | $500 | $5,000 | $131 | $1,000 | $5,000 |
| 659E35000 WATER | 0.41 MGAL | $20.00 | $5.00 | $500 | $654 | $100 | $10.00 |
| 832E30000 EROSION CONTROL | 2,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 838E20701 GABIONS, AS PER PLAN | 10 CY | $275 | $340 | $515 | $797 | $600 | $400 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 62 FT | $18.00 | $25.00 | $32.00 | $19.00 | $30.00 | $35.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 50 FT | $18.00 | $30.00 | $32.00 | $23.00 | $32.00 | $40.00 |
| 611E01400 6" CONDUIT, TYPE E | 15 FT | $20.00 | $50.00 | $100 | $27.00 | $90.00 | $95.00 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $3,100 | $3,000 | $1,900 | $4,500 | $3,500 | $2,500 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $950 | $1,250 | $450 | $570 | $600 | $500 |
| 304E20000 AGGREGATE BASE | 38 CY | $60.00 | $185 | $71.00 | $82.00 | $115 | $80.00 |
| 407E10000 TACK COAT | 48 GAL | $3.00 | $3.00 | $11.00 | $5.00 | $3.00 | $5.00 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 9 CY | $550 | $550 | $385 | $802 | $575 | $570 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (12 CY | $320 | $320 | $320 | $357 | $325 | $350 |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 43 SY | $75.00 | $110 | $71.50 | $204 | $140 | $145 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 65 FT | $50.00 | $70.00 | $40.95 | $66.00 | $50.00 | $35.00 |
| 613E41250 LOW STRENGTH MORTAR BACKFILL (TYPE 1) | 9 CY | $125 | $115 | $114 | $136 | $300 | $200 |
| 642E00300 CENTER LINE, TYPE 1 | 0.02 MILE | $95,000 | $72,455 | $73,000 | $98,438 | $75,000 | $95,000 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 7 CY | $60.00 | $220 | $265 | $163 | $215 | $100 |
| 616E10000 WATER | 0.35 MGAL | $10.00 | $100 | $500 | $136 | $100 | $10.00 |
| 202E22900 APPROACH SLAB REMOVED | 100 SY | $20.00 | $70.00 | $15.00 | $76.00 | $50.00 | $35.00 |
| 202E38500 BRIDGE RAILING REMOVED | 141 FT | $10.00 | $15.00 | $5.00 | $3.00 | $12.00 | $15.00 |
| 503E31100 ROCK EXCAVATION | 54 CY | $75.00 | $188 | $100 | $155 | $110 | $165 |
| 511E52100 CLASS QC FS CONCRETE | 2 CY | $985 | $600 | $685 | $1,280 | $3,500 | $1,500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 125 SY | $34.00 | $35.00 | $17.12 | $26.00 | $40.00 | $56.00 |
| 512E33000 TYPE 2 WATERPROOFING | 114 SY | $36.00 | $40.00 | $17.50 | $19.00 | $32.00 | $35.00 |
| 512E33300 TYPE A WATERPROOFING | 84 SY | $38.00 | $30.00 | $16.00 | $44.00 | $40.00 | $40.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 62 SF | $9.00 | $5.00 | $4.75 | $7.00 | $3.00 | $15.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 99 CY | $52.00 | $115 | $83.00 | $101 | $125 | $100 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 140 FT | $15.00 | $17.00 | $43.00 | $9.00 | $25.00 | $15.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 12 FT | $20.00 | $25.00 | $43.00 | $20.00 | $25.00 | $15.00 |
| 530E50030 SPECIAL - RETAINING WALL - NORTHEAST RETAINING W | 1 LS | $4,000 | $6,000 | $15,000 | $15,000 | $22,000 | $10,000 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $4,520 | $2,500 | $3,500 | $9,975 | $10,000 | $7,000 |
| 840E23000 SELECT GRANULAR BACKFILL | 33 CY | $54.00 | $100 | $94.00 | $87.00 | $125 | $120 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,150 | $7,500 | $15,000 | $12,000 | $10,000 | $6,500 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,500 | $4,500 | $3,300 | $6,000 | $10,000 | $10,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,100 | $11,000 | $10,000 | $11,000 | $8,000 | $7,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 43 FT | $3,265 | $140k | 26% |
| 517E75120 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI | 125 FT | $465 | $58k | 11% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 20,086 LB | $2.1 | $42k | 8% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 78 CY | $380 | $30k | 6% |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE (WINGWALLS) | 28 CY | $975 | $27k | 5% |
| 202E11003 STRUCTURE REMOVED, OVER 20 FOOT SPAN, AS PER PLAN | 1 LS | $21,000 | $21k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 46 CY | $250 | $12k | 2% |
| 511E44111 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 26 CY | $440 | $11k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $10,900 | $11k | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $10k | 2% |