LAK-US 6-02.60
LAK County · est $1.6M
Bid dateThursday, January 27—
LAK County · est $1.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 30 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Chagrin Valley Paving INC | R3Shelly Company | R4Karvo Companies INC | R5Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|
| 441E50301 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2356 CY | $145 | $160 | $130 | $160 | $170 | 23% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 1,577 CY | $180 | $165 | $185 | $215 | $230 | 19% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 2,000 SY | $120 | $75.00 | $155 | $125 | $140 | 16% |
| 253E02001 |
| Item | Quantity | R1Ronyak Paving INC | R2Chagrin Valley Paving INC | R3Shelly Company | R4Karvo Companies INC | R5Kokosing Construction Company INC |
|---|---|---|---|---|---|---|
| 608E52000 CURB RAMP | 260 SF | $16.00 | $13.00 | $15.00 | $15.00 | $16.00 |
| 608E53020 DETECTABLE WARNING | 24 SF | $66.00 | $55.00 | $62.00 | $62.00 | $66.00 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $675 | $800 | $1,325 | $1,325 | $675 |
| 690E98400 SPECIAL - PRE-CONSTRUCTION VIDEOGRAPHY | 1 LS |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 350 CY |
| $335 |
| $250 |
| $370 |
| $500 |
| $550 |
| 8% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 1,500 SY | $70.00 | $40.00 | $57.00 | $75.00 | $55.00 | 7% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 45,374 SY | $2.00 | $4.00 | $1.85 | $2.25 | $2.75 | 6% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $80,000 | $174,000 | $197,500 | $72,000 | $178,962 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $72,970 | $81,300 | $40,000 | $50,000 | $100,000 | 5% |
| 617E10100 COMPACTED AGGREGATE | 316 CY | $65.00 | $70.00 | $65.00 | $80.00 | $35.00 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 12 EACH | $1,350 | $1,100 | $1,100 | $1,100 | $1,100 | 1% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 72 CY | $180 | $165 | $185 | $210 | $170 | 1% |
| 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 | 3,192 FT | $3.85 | $3.85 | $3.85 | $3.85 | $3.85 | 1% |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $75.00 | $79.00 | $65.00 | $75.00 | $70.00 | 1% |
| 617E20000 SHOULDER PREPARATION | 5,552 SY | $2.00 | $0.50 | $0.50 | $3.00 | $7.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,675 | $10,000 | $5,000 | $18,000 | $7,650 | 1% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 2,618 LB | $4.00 | $2.00 | $1.75 | $0.80 | $0.60 | 1% |
| 407E13900 TACK COAT, 702.13 | 3,176 GAL | $2.00 | $2.00 | $3.50 | $3.00 | $2.55 | 0% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 5.98 MILE | $1,000 | $1,000 | $1,000 | $1,000 | $1,000 | 0% |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 9 EACH | $650 | $800 | $1,450 | $1,450 | $650 | 0% |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 9.96 MILE | $550 | $550 | $550 | $550 | $550 | 0% |
| $2,000 |
| $1,358 |
| $2,000 |
| $2,025 |
| $2,000 |
| 202E30000 WALK REMOVED | 260 SF | $10.00 | $5.00 | $4.50 | $4.50 | $4.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 2 EACH | $850 | $1,000 | $1,750 | $1,750 | $850 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 2 EACH | $1,100 | $1,500 | $2,250 | $2,250 | $1,100 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 2,000 LB | $1.85 | $2.00 | $2.00 | $2.00 | $1.85 |
| 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN | 20 CY | $20.00 | $50.00 | $20.00 | $41.21 | $20.00 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 20 CY | $85.00 | $100 | $50.00 | $75.00 | $85.00 |
| 407E10000 TACK COAT | 2,269 GAL | $2.00 | $2.00 | $2.50 | $2.50 | $2.45 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 4.98 MILE | $550 | $550 | $550 | $550 | $550 |
| 642E00200 LANE LINE, 4", TYPE 1 | 0.03 MILE | $375 | $375 | $375 | $375 | $375 |
| 642E00300 CENTER LINE, TYPE 1 | 2.99 MILE | $900 | $900 | $900 | $900 | $900 |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 384 FT | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 |
| 642E00500 STOP LINE, TYPE 1 | 212 FT | $3.85 | $3.85 | $3.85 | $3.85 | $3.85 |
| 642E00620 CROSSWALK LINE, 12", TYPE 1 | 369 FT | $2.65 | $2.65 | $2.65 | $2.65 | $2.65 |
| 642E01300 LANE ARROW, TYPE 1 | 21 EACH | $48.00 | $48.00 | $48.00 | $48.00 | $48.00 |
| 642E01400 WORD ON PAVEMENT, 72", TYPE 1 | 5 EACH | $150 | $150 | $150 | $150 | $150 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.06 MILE | $550 | $500 | $500 | $500 | $500 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.03 MILE | $500 | $500 | $500 | $500 | $500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 2.99 MILE | $1,000 | $1,000 | $1,000 | $1,000 | $1,000 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 4.98 MILE | $550 | $550 | $550 | $550 | $550 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 768 FT | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 384 FT | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 424 FT | $3.85 | $3.85 | $3.85 | $3.85 | $3.85 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 212 FT | $3.85 | $3.85 | $3.85 | $3.85 | $3.85 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $925 | $1,050 | $1,000 | $900 | $900 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,262 | $1,000 | $2,500 | $6,500 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50301 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (2356 CY | $145 | $342k | 23% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 1,577 CY | $180 | $284k | 19% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 2,000 SY | $120 | $240k | 16% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 350 CY | $335 | $117k | 8% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 1,500 SY | $70 | $105k | 7% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 45,374 SY | $2 | $91k | 6% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $80,000 | $80k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $72,970 | $73k | 5% |
| 617E10100 COMPACTED AGGREGATE | 316 CY | $65 | $21k | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 12 EACH | $1,350 | $16k | 1% |