PER-MR Nuzum 00.04
PER County · est $0.4M
Bid dateThursday, February 17—
PER County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 37 more items below.
| Item | Quantity | R1J & J Bridge Company INC | R2Buds INC | R3Shelly & Sands INC | R4Mc Connell Contracting INC | R5Axis Civil Construction LLC | R6Righter Company INC | R7Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 515E10050 PRESTRESSED CONCRETE NON-COMPOSITE BOX BEAM BRIDGE | 4 EACH | $24,000 | $24,000 | $16,500 | $20,250 | $25,150 | $25,000 | $17,900 | 31% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 42 CY | $810 | $825 | $890 | $575 | $850 | $800 | $1,100 | 11% |
| Item | Quantity | R1J & J Bridge Company INC | R2Buds INC | R3Shelly & Sands INC | R4Mc Connell Contracting INC | R5Axis Civil Construction LLC | R6Righter Company INC | R7Complete General Construction Company |
|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED, ASPHALT | 154 SY | $14.00 | $18.00 | $8.00 | $8.00 | $11.00 | $10.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 364 SY | $5.00 | $3.00 | $4.00 | $2.50 | $4.00 | $2.00 | $7.00 |
| 204E13000 EXCAVATION OF SUBGRADE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 125 FT |
| $165 |
| $128 |
| $130 |
| $141 |
| $141 |
| $141 |
| $195 |
| 7% |
| 638E05101 2" COPPER SERVICE BRANCH, AS PER PLAN | 210 FT | $75.00 | $40.00 | $60.00 | $65.00 | $65.00 | $100 | $85.00 | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $4,000 | $2,300 | $7,500 | $5,500 | $8,000 | $4,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $10,500 | $10,000 | $35,000 | $20,000 | $10,000 | $10,000 | 5% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 320 FT | $38.00 | $35.70 | $34.00 | $40.00 | $40.00 | $50.00 | $37.50 | 4% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $12,000 | $7,500 | $20,000 | $5,000 | $9,500 | $20,000 | $24,000 | 4% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $12,000 | $14,000 | $18,000 | $20,000 | $12,450 | $20,000 | $15,000 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $8,000 | $6,400 | $3,500 | $12,000 | $7,500 | $20,000 | 3% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 92 CY | $92.00 | $135 | $85.00 | $105 | $75.00 | $100 | $90.00 | 3% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 3,752 LB | $2.00 | $2.00 | $3.00 | $2.00 | $2.65 | $2.00 | $3.00 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (16 CY | $450 | $390 | $395 | $400 | $450 | $395 | $385 | 2% |
| 304E20000 AGGREGATE BASE | 68 CY | $100 | $110 | $110 | $105 | $110 | $80.00 | $75.00 | 2% |
| 203E20000 EMBANKMENT | 206 CY | $32.00 | $35.00 | $39.00 | $30.00 | $25.00 | $25.00 | $50.00 | 2% |
| 606E25000 ANCHOR ASSEMBLY, TYPE A | 4 EACH | $1,500 | $1,500 | $1,500 | $2,800 | $2,800 | $2,800 | $1,660 | 2% |
| 511E33417 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 4 CY | $1,500 | $2,500 | $5,000 | $600 | $850 | $800 | $3,000 | 2% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $5,000 | $15,000 | $33,000 | $35,000 | $16,500 | $20,000 | $30,000 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 12 CY | $400 | $410 | $404 | $405 | $450 | $404 | $410 | 2% |
| 203E10000 EXCAVATION | 63 CY | $70.00 | $35.00 | $24.00 | $20.00 | $25.00 | $25.00 | $25.00 | 1% |
| 10 CY |
| $5.00 |
| $20.00 |
| $32.00 |
| $20.00 |
| $25.00 |
| $25.00 |
| $15.00 |
| 204E21000 GRANULAR EMBANKMENT | 10 CY | $50.00 | $50.00 | $92.00 | $75.00 | $80.00 | $60.00 | $30.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $50.00 | $85.00 | $180 | $50.00 | $170 | $100 | $300 |
| 204E50000 GEOTEXTILE FABRIC | 30 SY | $1.00 | $2.00 | $10.00 | $5.00 | $5.00 | $5.00 | $5.26 |
| 606E13000 GUARDRAIL, TYPE 5 | 100 FT | $25.00 | $22.00 | $22.00 | $34.00 | $34.00 | $34.00 | $29.00 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $800 | $850 | $850 | $2,575 | $2,575 | $2,575 | $1,415 |
| 659E00300 TOPSOIL | 62 CY | $5.00 | $20.00 | $32.00 | $30.00 | $40.00 | $25.00 | $20.00 |
| 659E10000 SEEDING AND MULCHING | 557 SY | $3.00 | $3.00 | $4.46 | $3.50 | $4.45 | $4.45 | $4.45 |
| 659E20000 COMMERCIAL FERTILIZER | 0.08 TON | $3,000 | $650 | $800 | $1,200 | $800 | $800 | $800 |
| 659E31000 LIME | 0.12 ACRE | $1,500 | $200 | $80.00 | $1,000 | $80.00 | $80.00 | $80.00 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 4,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00900 6" CONDUIT, TYPE B, FOR DRAINAGE CONNECTION | 30 FT | $20.00 | $20.00 | $14.00 | $5.00 | $30.00 | $10.00 | $6.00 |
| 611E01500 6" CONDUIT, TYPE F, FOR DRAINAGE CONNECTION | 30 FT | $20.00 | $15.00 | $14.00 | $5.00 | $30.00 | $10.00 | $6.00 |
| 407E10000 TACK COAT | 19 GAL | $3.50 | $4.00 | $4.00 | $4.00 | $5.00 | $4.00 | $1.85 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $8.00 | $10.00 | $10.00 | $14.00 | $14.00 | $14.00 | $13.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 25 FT | $12.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 12.6 SF | $25.00 | $25.00 | $25.00 | $51.00 | $25.00 | $25.00 | $29.00 |
| 407E10000 TACK COAT | 6 GAL | $3.50 | $4.00 | $4.00 | $4.00 | $5.00 | $4.00 | $1.85 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 10 CY | $400 | $410 | $404 | $405 | $450 | $404 | $410 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1,000 | $7,500 | $30,000 | $5,000 | $30,000 | $20,000 | $40,000 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 280 FT | $2.00 | $3.00 | $28.00 | $4.00 | $2.00 | $10.00 | $30.00 |
| 507E93300 STEEL POINTS OR SHOES | 8 EACH | $125 | $150 | $120 | $150 | $130 | $200 | $120 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 48 SY | $25.00 | $35.00 | $55.00 | $18.00 | $64.00 | $55.00 | $55.00 |
| 512E33010 TYPE 3 WATERPROOFING | 96 SY | $35.00 | $35.00 | $35.00 | $60.50 | $36.00 | $35.00 | $35.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 22 SF | $4.00 | $15.00 | $15.00 | $15.00 | $11.00 | $5.00 | $15.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 32 FT | $30.00 | $50.00 | $40.00 | $40.00 | $30.00 | $48.00 | $48.00 |
| 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J | 32 FT | $30.00 | $100 | $25.00 | $25.00 | $15.00 | $25.00 | $25.00 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 16 EACH | $200 | $165 | $88.00 | $175 | $220 | $200 | $575 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $2,000 | $5,000 | $3,100 | $3,500 | $6,000 | $5,350 | $5,000 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 117 FT | $18.00 | $18.00 | $13.50 | $20.00 | $21.00 | $13.50 | $13.50 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 60 FT | $8.00 | $20.00 | $5.00 | $10.00 | $15.00 | $10.00 | $13.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 52 FT | $8.00 | $20.00 | $12.00 | $10.00 | $15.00 | $20.00 | $16.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,500 | $4,000 | $2,600 | $30,000 | $3,500 | $2,500 | $11,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $4,000 | $9,000 | $4,000 | $5,500 | $12,000 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E10050 PRESTRESSED CONCRETE NON-COMPOSITE BOX BEAM BRIDGE | 4 EACH | $24,000 | $96k | 27% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 42 CY | $810 | $34k | 10% |
| 517E72300 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 125 FT | $165 | $21k | 6% |
| 638E05101 2" COPPER SERVICE BRANCH, AS PER PLAN | 210 FT | $75 | $16k | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $15k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 4% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 320 FT | $38 | $12k | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $12,000 | $12k | 3% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $12,000 | $12k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $10k | 3% |