LOR-CR 78-00.00 (Moore Rd)
LOR County · est $0.5M
Bid dateThursday, March 17—
LOR County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 44 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Karvo Companies INC | R3Chagrin Valley Paving INC | R4Cross-roads Asphalt Recycling INC | R5Ronyak Paving INC | % of bid |
|---|---|---|---|---|---|---|---|
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 1,314 SY | $78.00 | $54.00 | $50.00 | $52.00 | $70.00 | 24% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 456 CY | $190 | $190 | $175 | $195 | $185 | 20% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (274 CY | $178 | $178 | $200 | $185 | $185 | 11% |
| Item | Quantity | R1Kokosing Construction Company INC | R2Karvo Companies INC | R3Chagrin Valley Paving INC | R4Cross-roads Asphalt Recycling INC | R5Ronyak Paving INC |
|---|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 149 SF | $7.50 | $4.50 | $3.00 | $3.00 | $14.00 |
| 202E32500 CURB AND GUTTER REMOVED | 76 FT | $10.75 | $27.50 | $12.00 | $12.00 | $30.00 |
| 203E10000 EXCAVATION | 20 CY | $38.50 | $65.00 | $80.00 | $85.00 | $80.00 |
| 204E10000 SUBGRADE COMPACTION |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 614E11000 MAINTAINING TRAFFIC |
| 1 LS |
| $43,994 |
| $43,000 |
| $50,000 |
| $50,715 |
| $58,640 |
| 10% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 1,314 SY | $25.00 | $19.80 | $20.00 | $34.00 | $30.00 | 8% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | — | $1.25 | $1.65 | $3.00 | $2.00 | $2.00 | 4% |
| 659E00300 TOPSOIL | 290 CY | $48.00 | $37.00 | $65.00 | $65.00 | $37.00 | 3% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 220 CY | $53.00 | $58.00 | $15.00 | $65.00 | $60.00 | 3% |
| 832E30001 EROSION CONTROL, AS PER PLAN | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $12,000 | $30,000 | $20,000 | $45,850 | 2% |
| 608E52000 CURB RAMP | 498 SF | $18.00 | $38.00 | $20.00 | $20.00 | $38.00 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $1,800 | $1,900 | $1,500 | $1,500 | $1,650 | 2% |
| 617E10100 COMPACTED AGGREGATE | 230 CY | $30.00 | $68.00 | $75.00 | $60.00 | $80.00 | 2% |
| 659E10000 SEEDING AND MULCHING | 3,455 SY | $1.65 | $1.25 | $1.25 | $2.75 | $1.25 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $67.50 | $75.00 | $80.00 | $60.00 | $70.00 | 1% |
| 209E60500 LINEAR GRADING | 1.17 MILE | $4,500 | $5,500 | $2,000 | $2,600 | $5,000 | 1% |
| 203E10001 EXCAVATION, AS PER PLAN | 220 CY | $21.00 | $28.00 | $10.00 | $52.00 | $38.00 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 1,966 GAL | $2.00 | $2.25 | $2.00 | $3.75 | $4.00 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 3 EACH | $1,200 | $1,200 | $1,200 | $1,200 | $1,600 | 1% |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 1,479 FT | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 | 1% |
| 161 SY |
| $1.00 |
| $0.25 |
| $2.00 |
| $7.50 |
| $9.00 |
| 204E10001 SUBGRADE COMPACTION, AS PER PLAN | 1,314 SY | $0.60 | $0.25 | $0.10 | $2.00 | $0.10 |
| 608E10000 4" CONCRETE WALK | 136 SF | $18.00 | $11.50 | $7.50 | $7.50 | $21.00 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 1 EACH | $800 | $1,150 | $1,000 | $1,000 | $900 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 7 EACH | $200 | $245 | $235 | $150 | $325 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 7 EACH | $345 | $395 | $345 | $250 | $325 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $500 | $150 | $150 | $500 | $100 |
| 659E14000 REPAIR SEEDING AND MULCHING | 172 SY | $5.00 | $2.00 | $2.00 | $0.75 | $2.00 |
| 659E15000 INTER-SEEDING | 172 SY | $5.00 | $0.01 | $0.01 | $0.75 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.31 TON | $1,939 | $1,200 | $1,200 | $992 | $1,200 |
| 659E31000 LIME | 0.71 ACRE | $700 | $0.01 | $100 | $397 | $1.00 |
| 659E35000 WATER | 18.6 MGAL | $40.00 | $0.01 | $1.00 | $20.00 | $0.50 |
| 659E40000 MOWING | 31 MSF | $60.00 | $0.01 | $25.00 | $50.00 | $0.50 |
| 254E01011 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER | 149 SY | $8.00 | $14.00 | $30.00 | $9.00 | $20.00 |
| 254E01600 PATCHING PLANED SURFACE | 1,314 SY | $1.25 | $1.00 | $5.00 | $5.00 | $1.00 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 30 FT | $35.00 | $100 | $30.00 | $30.00 | $100 |
| 617E20000 SHOULDER PREPARATION | 1,377 SY | $0.10 | $5.75 | $1.00 | $2.50 | $2.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $750 | $1,150 | $1,000 | $1,000 | $700 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $750 | $1,350 | $1,200 | $1,200 | $2,500 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 189 FT | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 630E80100 SIGN, FLAT SHEET | 64 SF | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 10 EACH | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 13 EACH | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 1.44 MILE | $585 | $585 | $585 | $585 | $585 |
| 642E00300 CENTER LINE, TYPE 1 | 0.78 MILE | $1,200 | $1,200 | $1,200 | $1,200 | $1,200 |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 182 FT | $0.70 | $0.70 | $0.70 | $0.70 | $0.70 |
| 642E00500 STOP LINE, TYPE 1 | 31 FT | $3.85 | $3.85 | $3.85 | $3.85 | $3.85 |
| 642E00620 CROSSWALK LINE, 12", TYPE 1 | 499 FT | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 | 190 FT | $3.85 | $3.85 | $3.85 | $3.85 | $3.85 |
| 642E01000 RAILROAD SYMBOL MARKING, TYPE 1 | 1 EACH | $300 | $300 | $300 | $300 | $300 |
| 642E01300 LANE ARROW, TYPE 1 | 4 EACH | $55.00 | $55.00 | $55.00 | $55.00 | $55.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $125 | $320 | $250 | $225 | $275 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $600 | $900 | $900 | $900 | $900 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 2.34 MILE | $1,000 | $1,000 | $1,000 | $1,000 | $1,000 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 546 FT | $0.50 | $0.50 | $0.50 | $0.50 | $0.50 |
| 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P | 570 FT | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 165 FT | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 9 EACH | $40.00 | $40.00 | $40.00 | $40.00 | $40.00 |
| 614E32200 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I, 642 PA | 1 EACH | $300 | $300 | $300 | $300 | $300 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $5,000 | $5,000 | $4,000 | $5,163 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $3,200 | $100 | $1,000 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 1,314 SY | $78 | $102k | 21% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 456 CY | $190 | $87k | 18% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (274 CY | $178 | $49k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $43,994 | $44k | 9% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 1,314 SY | $25 | $33k | 7% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | — | $1.25 | $16k | 3% |
| 659E00300 TOPSOIL | 290 CY | $48 | $14k | 3% |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 220 CY | $53 | $12k | 2% |
| 832E30001 EROSION CONTROL, AS PER PLAN | 10,000 EACH | $1 | $10k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 2% |