SUM-Munroe Falls Ave
SUM County · est $0.4M
Bid dateThursday, March 17—
SUM County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 19 more items below.
| Item | Quantity | R1Barbicas Construction Company INC | R2Chagrin Valley Paving INC | R3Karvo Companies INC | R4Kenmore Construction CO INC | % of bid |
|---|---|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 375 CY | $180 | $185 | $188 | $240 | 21% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (375 CY | $150 | $175 | $150 | $175 | 18% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=3") | 8,856 SY | $4.00 | $3.00 | $2.55 | $5.00 | 11% |
| 690E98300 SPECIAL - GLASPAVE 25 PAVEMENT INTERLAYER | 8,856 SY | $3.65 | $3.65 |
| Item | Quantity | R1Barbicas Construction Company INC | R2Chagrin Valley Paving INC | R3Karvo Companies INC | R4Kenmore Construction CO INC |
|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 10 SY | $50.00 | $50.00 | $80.00 | $50.00 |
| 203E10000 EXCAVATION | 74 CY | $15.00 | $10.00 | $20.00 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 443 SY | $0.50 | $0.50 | $0.10 | $2.00 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 62 STA | $25.00 | $25.00 | $90.00 | $300 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $3.65 |
| $3.65 |
| 10% |
| 253E01000 PAVEMENT REPAIR | 443 SY | $61.00 | $60.00 | $72.00 | $125 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $22,000 | $15,000 | $15,000 | $10,000 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $35,000 | $39,000 | $60,000 | 5% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 443 SY | $25.00 | $30.00 | $42.00 | $35.00 | 3% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 8 EACH | $1,300 | $1,500 | $1,600 | $1,700 | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 80 CY | $80.00 | $100 | $80.00 | $50.00 | 2% |
| 609E98000 CURB, MISC.:CURB REMOVED AND REPLACED | 170 FT | $30.00 | $50.00 | $67.00 | $50.00 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 10 EACH | $500 | $1,250 | $1,600 | $1,800 | 2% |
| 304E20000 AGGREGATE BASE | 74 CY | $50.00 | $30.00 | $55.00 | $45.00 | 1% |
| 644E00300 CENTER LINE | 0.59 MILE | $5,800 | $6,000 | $6,000 | $5,800 | 1% |
| 644E00100 EDGE LINE, 4" | 1.16 MILE | $2,900 | $3,200 | $3,200 | $2,900 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 1,255 GAL | $2.50 | $2.00 | $2.25 | $3.00 | 1% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 622 LB | $4.93 | $2.00 | $0.70 | $3.00 | 1% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 5 EACH | $600 | $1,000 | $1,200 | $650 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 2 EACH | $1,500 | $1,300 | $1,300 | $1,500 | 1% |
| 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA | 62 STA | $35.00 | $25.00 | $50.00 | $300 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $650 | $1,000 | $1,400 | $900 |
| 690E98400 SPECIAL - PRECONSTRUCTION VIDEO TAPING | 1 LS | $925 | $980 | $645 | $900 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $1.25 | $2.00 | $1.50 | $3.00 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $500 | $500 | $188 | $400 |
| 644E00400 CHANNELIZING LINE, 8" | 133 FT | $1.25 | $2.00 | $2.00 | $1.25 |
| 644E00500 STOP LINE | 64 FT | $6.00 | $7.50 | $7.50 | $6.00 |
| 644E01300 LANE ARROW | 6 EACH | $125 | $95.00 | $95.00 | $125 |
| 644E00620 CROSSWALK LINE, 12" | 125 FT | $3.00 | $3.75 | $3.75 | $3.00 |
| 646E20400 WORD ON PAVEMENT, 72" | 8 EACH | $165 | $300 | $300 | $165 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $80.00 | $80.00 | $100 |
| 614E21400 WORK ZONE CENTER LINE, CLASS II | 1.18 MILE | $1,200 | $650 | $650 | $1,200 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.59 MILE | $1,200 | $2,000 | $2,000 | $1,200 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 1.18 MILE | $700 | $325 | $325 | $700 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,000 | $3,500 | $5,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 375 CY | $180 | $68k | 20% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (375 CY | $150 | $56k | 16% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=3") | 8,856 SY | $4 | $35k | 10% |
| 690E98300 SPECIAL - GLASPAVE 25 PAVEMENT INTERLAYER | 8,856 SY | $3.65 | $32k | 9% |
| 253E01000 PAVEMENT REPAIR | 443 SY | $61 | $27k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $22,000 | $22k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $15k | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 443 SY | $25 | $11k | 3% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 8 EACH | $1,300 | $10k | 3% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 80 CY | $80 | $6k | 2% |