D12-PPM FY2022
D12 County · est $1.7M
Bid dateThursday, March 17—
D12 County · est $1.7M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 50 more items below.
| Item | Quantity | R1Chagrin Valley Paving INC | R2Karvo Companies INC | R3Kokosing Construction Company INC | R4Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|
| 424E12000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | — | $210 | $225 | $260 | $305 | 19% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, "A" | 80 CY | $2,900 | $2,500 | $1,420 | $1,500 | 13% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 825 CY | $225 | $255 | $280 | $295 | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $175,000 | $215,000 | $184,701 |
| Item | Quantity | R1Chagrin Valley Paving INC | R2Karvo Companies INC | R3Kokosing Construction Company INC | R4Barbicas Construction Company INC |
|---|---|---|---|---|---|
| 202E32000 CURB REMOVED | 363 FT | $10.00 | $11.50 | $10.00 | $6.50 |
| 203E10000 EXCAVATION | 77 CY | $60.00 | $65.00 | $60.00 | $31.00 |
| 203E20000 EMBANKMENT | 32 CY | $80.00 | $55.00 | $80.00 | $55.00 |
| 209E60501 LINEAR GRADING, AS PER PLAN | 6.06 MILE | $1,000 | $1,885 | $1,500 | $2,750 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $450,000 |
| 10% |
| 624E10000 MOBILIZATION | 1 LS | $130,000 | $90,000 | $100,000 | $450,000 | 7% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 268 CY | $400 | $450 | $600 | $345 | 6% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A | — | $1.50 | $1.10 | $1.20 | $1.75 | 5% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 200 SY | $400 | $325 | $510 | $455 | 5% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 200 SY | $400 | $475 | $610 | $465 | 5% |
| 254E01011 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER | 6,428 SY | $8.00 | $11.50 | $15.00 | $6.25 | 3% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, "B" | 160 CY | $300 | $315 | $620 | $350 | 3% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 370 SY | $100 | $60.00 | $150 | $68.00 | 2% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, "C" | 120 CY | $300 | $345 | $450 | $360 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 350 HOUR | $100 | $75.00 | $70.00 | $70.00 | 2% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 75 SY | $400 | $450 | $570 | $440 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (1.5") | 14,789 SY | $2.00 | $2.00 | $5.00 | $2.25 | 2% |
| 609E26000 CURB, TYPE 6 | 561 FT | $40.00 | $49.25 | $40.00 | $42.00 | 1% |
| 630E97800 SIGNING, MISC.:ADDITIONAL SIGNS, GROUND MOUNTED, A | 800 SF | $27.00 | $35.07 | $15.00 | $25.00 | 1% |
| 646E10010 EDGE LINE, 6" | 7.84 MILE | $2,644 | $3,437 | $5,500 | $5,500 | 1% |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $400 | $550 | $470 | $525 | 1% |
| 7 EACH |
| $600 |
| $1,400 |
| $600 |
| $600 |
| 623E39601 MONUMENT BOX RECONSTRUCTED TO GRADE, AS PER PLAN | 1 EACH | $900 | $1,800 | $900 | $800 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 249 SY | $5.00 | $2.00 | $5.00 | $2.50 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $1,000 | $1,400 | $1,000 | $1,050 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 1 EACH | $1,500 | $1,900 | $1,500 | $1,350 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 2,000 LB | $2.00 | $2.75 | $2.00 | $1.50 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22, (5.5") | 20 CY | $200 | $300 | $380 | $275 |
| 304E20000 AGGREGATE BASE, (5") | 17 CY | $100 | $175 | $100 | $195 |
| 407E13900 TACK COAT, 702.13 | 514 GAL | $2.00 | $2.50 | $2.55 | $2.70 |
| 407E20000 NON-TRACKING TACK COAT | 7,992 GAL | $2.00 | $2.25 | $2.26 | $2.70 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 16 CY | $400 | $410 | $470 | $515 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 198 CY | $75.00 | $80.00 | $70.00 | $110 |
| 618E43000 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 2.51 MILE | $4,000 | $2,000 | $2,400 | $4,300 |
| 874E21000 LONGITUDINAL JOINT PREPARATION | 2.51 MILE | $1,000 | $4,300 | $1,250 | $8,500 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 1,035 LB | $5.00 | $0.85 | $0.65 | $3.70 |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | 1 (5009 SY | $3.00 | $3.45 | $4.00 | $8.60 |
| 618E40601 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER | 0.81 MILE | $8,000 | $4,500 | $5,400 | $8,700 |
| 621E00100 RPM | 315 EACH | $50.55 | $77.38 | $40.55 | $79.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 299 EACH | $1.00 | $3.00 | $2.00 | $9.00 |
| 646E10110 LANE LINE, 6" | 1.13 MILE | $1,874 | $2,436 | $2,500 | $2,500 |
| 646E10200 CENTER LINE | 3.59 MILE | $3,009 | $3,911 | $5,500 | $5,500 |
| 646E10310 CHANNELIZING LINE, 12" | 134 FT | $2.01 | $2.61 | $5.00 | $5.00 |
| 646E10400 STOP LINE | 112 FT | $9.59 | $12.47 | $15.00 | $15.00 |
| 646E10510 CROSSWALK LINE, 12" | 95 FT | $8.47 | $11.01 | $10.00 | $10.00 |
| 646E10900 HANDICAP SYMBOL MARKING | 3 EACH | $230 | $299 | $295 | $295 |
| 646E20110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $338 | $440 | $600 | $600 |
| 646E20200 PARKING LOT STALL MARKING | 1,155 FT | $1.01 | $1.31 | $8.50 | $8.50 |
| 646E20510 DOTTED LINE, 12" | 95 FT | $0.99 | $1.29 | $2.00 | $2.00 |
| 690E98400 SPECIAL - INVENTORY EXISTING PAVEMENT MARKINGS | 1 LS | $2,952 | $3,837 | $650 | $650 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 3 EACH | $1,200 | $1,200 | $1,200 | $1,600 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $300 | $235 | $270 | $290 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $920 | $500 | $920 | $920 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 1.13 MILE | $335 | $435 | $2,000 | $2,000 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 3.41 MILE | $991 | $1,287 | $1,375 | $1,375 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 3.41 MILE | $760 | $988 | $1,250 | $1,250 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 7.49 MILE | $788 | $1,023 | $1,000 | $1,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 6.82 MILE | $558 | $724 | $675 | $675 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 134 FT | $0.70 | $0.91 | $0.50 | $0.50 |
| 614E24208 WORK ZONE DOTTED LINE, CLASS I, 12", 642 PAINT | 95 FT | $0.65 | $0.83 | $1.00 | $1.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 112 FT | $3.55 | $4.58 | $3.50 | $3.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 112 FT | $3.50 | $4.51 | $3.50 | $3.50 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 95 FT | $3.25 | $4.23 | $3.50 | $3.50 |
| 614E27250 WORK ZONE CROSSWALK LINE, CLASS III, 12", 642 PAIN | 95 FT | $3.25 | $4.17 | $3.50 | $3.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $22,000 | $10,000 | $100,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $500 | $6,000 | $15,000 | $8,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E12000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | — | $210 | $337k | 17% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN, "A" | 80 CY | $2,900 | $232k | 12% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 825 CY | $225 | $186k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $175,000 | $175k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $130,000 | $130k | 7% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 268 CY | $400 | $107k | 5% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A | — | $1.5 | $90k | 5% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 200 SY | $400 | $80k | 4% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 200 SY | $400 | $80k | 4% |
| 254E01011 PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER | 6,428 SY | $8 | $51k | 3% |