WAS-SR 7-28.97
WAS County · est $0.4M
Bid dateThursday, April 14—
WAS County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 24 more items below.
| Item | Quantity | R1Parker Corporation | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4Wolf Creek Contracting Company LLC | % of bid |
|---|---|---|---|---|---|---|
| 611E26001 72" CONDUIT, TYPE A, AS PER PLAN706.02 | 112 FT | $661 | $600 | $910 | $629 | 25% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 480 CY | $110 | $160 | $145 | $155 | 18% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 114 CY | $361 | $235 | $240 | $412 | 14% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 55 CY | $561 | $270 | $340 | $641 |
| Item | Quantity | R1Parker Corporation | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4Wolf Creek Contracting Company LLC |
|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 337 FT | $2.00 | $7.00 | $2.00 | $2.75 |
| 203E20000 EMBANKMENT | 94 CY | $20.00 | $45.00 | $12.00 | $31.79 |
| 204E10000 SUBGRADE COMPACTION | 487 SY | $0.50 | $4.00 | $2.00 | $4.89 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 37.5 FT | $45.64 | $50.00 | $32.00 | $52.28 |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 10% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $12,000 | $10,000 | $20,000 | $1,494 | 4% |
| 203E10000 EXCAVATION | 589 CY | $20.00 | $17.00 | $20.00 | $35.11 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $8,500 | $31,000 | $9,027 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $32,000 | $35,000 | $38,886 | 3% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,500 | $2,300 | $3,000 | $2,863 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 137.5 FT | $42.98 | $57.00 | $30.00 | $49.23 | 2% |
| 304E20000 AGGREGATE BASE | 87 CY | $65.00 | $95.00 | $100 | $156 | 2% |
| 602E20000 CONCRETE MASONRY | 5.54 CY | $1,000 | $1,200 | $1,500 | $1,376 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $2,500 | $3,800 | $4,000 | $2,863 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $10,000 | $20,000 | $25,562 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,450 | $5,000 | $3,200 | $4,194 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/2" AVERAG | 422 SY | $8.00 | $9.00 | $10.00 | $27.49 | 1% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 310 FT | $10.00 | $20.00 | $21.00 | $58.51 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $2,000 | $5,000 | $2,621 | 1% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,300 | $3,300 | $2,000 | $1,489 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $2,000 | $5,000 | $2,988 | 1% |
| 29 CY |
| $65.00 |
| $100 |
| $125 |
| $134 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 5 CY | $65.00 | $225 | $270 | $152 |
| 659E10000 SEEDING AND MULCHING | 1,569 SY | $1.00 | $2.20 | $2.50 | $2.35 |
| 659E20000 COMMERCIAL FERTILIZER | 0.15 TON | $1,667 | $800 | $1,200 | $916 |
| 659E31000 LIME | 0.33 ACRE | $758 | $90.00 | $191 | $91.64 |
| 659E35000 WATER | 5 MGAL | $0.05 | $1.00 | $1.00 | $1.15 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 24 FT | $10.00 | $16.00 | $45.00 | $25.15 |
| 407E20000 NON-TRACKING TACK COAT | 108 GAL | $5.00 | $8.00 | $11.00 | $4.58 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 13 EACH | $20.00 | $12.00 | $10.00 | $10.75 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 6 EACH | $20.00 | $8.00 | $13.00 | $13.74 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $50.00 | $80.00 | $80.00 | $57.27 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $50.00 | $20.00 | $80.00 | $57.27 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.21 MILE | $3,450 | $3,500 | $4,000 | $6,586 |
| 642E00300 CENTER LINE, TYPE 1 | 0.11 MILE | $5,750 | $5,800 | $7,000 | $20,332 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $200 | $2,100 | $2,500 | $6,872 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 15 EACH | $10.00 | $35.00 | $46.00 | $11.45 |
| 614E13360 OBJECT MARKER, TWO WAY | 15 EACH | $10.00 | $40.00 | $51.00 | $17.18 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.3 MILE | $2,500 | $4,500 | $5,700 | $5,555 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 24 FT | $10.00 | $12.00 | $16.00 | $13.74 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E26001 72" CONDUIT, TYPE A, AS PER PLAN706.02 | 112 FT | $661 | $74k | 24% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 480 CY | $110 | $53k | 17% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 114 CY | $361 | $41k | 13% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 55 CY | $561 | $31k | 10% |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $12,000 | $12k | 4% |
| 203E10000 EXCAVATION | 589 CY | $20 | $12k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $10k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $10k | 3% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,500 | $6k | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 137.5 FT | $42.98 | $6k | 2% |