LIC-SR 310-09.88
LIC County · est $0.4M
Bid dateThursday, June 16—
LIC County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 27 more items below.
| Item | Quantity | R1Buds INC | R2Axis Civil Construction LLC | R3Complete General Construction Company | R4Ohio-west Virginia Excavating CO | % of bid |
|---|---|---|---|---|---|---|
| 611E94911 8' X 6' CONDUIT, TYPE A, 706.05, AS PER PLAN | 128 FT | $1,430 | $1,575 | $1,150 | $2,455 | 46% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 2,000 DLR | $21.00 | $21.00 | $21.00 | $21.00 | 11% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 35 CY | $750 | $620 | $850 | $887 | 7% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 66 CY | $365 | $280 | $345 | $462 | 6% |
| 511E46001 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 33 SY | $416 | $900 | $1,400 | $1,158 | 3% |
| 202E35200 PIPE REMOVED, OVER 24" | 134 FT | $98.00 | $100 |
| Item | Quantity | R1Buds INC | R2Axis Civil Construction LLC | R3Complete General Construction Company | R4Ohio-west Virginia Excavating CO |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $5,000 | $17,500 | $12,946 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $600 | $2,000 | $3,000 | $2,994 |
| 203E10000 EXCAVATION | 52 CY | $25.00 | $40.00 | $45.00 | $42.43 |
| 203E20000 EMBANKMENT | 68 CY | $45.00 | $40.00 | $50.00 | $91.80 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $75.00 |
| $47.60 |
| 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $12,500 | $17,000 | $40,000 | $52,616 | 3% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 22 CY | $505 | $450 | $600 | $815 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $25,000 | $20,000 | $73,626 | 3% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (16 CY | $600 | $450 | $470 | $720 | 2% |
| 304E20000 AGGREGATE BASE | 58 CY | $112 | $120 | $90.00 | $140 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,400 | $5,000 | $2,000 | $13,087 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $6,200 | $24,500 | $50,000 | $14,734 | 2% |
| 512E33000 TYPE 2 WATERPROOFING | 342 SY | $18.00 | $20.00 | $25.00 | $32.48 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 2,402 LB | $2.50 | $2.00 | $1.50 | $4.14 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $5,000 | $6,950 | $6,950 | $7,599 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $4,500 | $5,000 | $9,276 | 1% |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $4,500 | $5,000 | $10,000 | $4,956 | 1% |
| 621E00100 RPM | 2 EACH | $2,000 | $1,200 | $1,200 | $3,395 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $950 | $700 | $700 | $2,648 | 1% |
| 726 SY |
| $3.15 |
| $5.00 |
| $5.75 |
| $6.79 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $650 | $1,400 | $1,195 | $1,901 |
| 659E31000 LIME | 0.2 ACRE | $450 | $80.00 | $85.00 | $109 |
| 659E35000 WATER | 4 MGAL | $1.00 | $1.00 | $1.00 | $1.36 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 26 CY | $110 | $120 | $175 | $185 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $5.00 | $20.00 | $6.00 | $55.58 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $5.00 | $20.00 | $6.00 | $55.58 |
| 204E10000 SUBGRADE COMPACTION | 355 SY | $3.00 | $5.00 | $10.00 | $1.96 |
| 407E20000 NON-TRACKING TACK COAT | 45 GAL | $4.15 | $5.00 | $4.00 | $5.43 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 6 CY | $150 | $150 | $175 | $313 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $10.00 | $50.00 | $50.00 | $87.74 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 24 FT | $15.00 | $22.00 | $22.00 | $41.27 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $45.00 | $250 | $250 | $543 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $65.00 | $65.00 | $136 |
| 644E00104 EDGE LINE, 6" | 0.03 MILE | $10,000 | $9,945 | $9,945 | $13,507 |
| 644E00300 CENTER LINE | 0.03 MILE | $13,000 | $12,850 | $12,850 | $17,452 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 40 FT | $10.00 | $8.05 | $8.05 | $10.93 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $85.00 | $150 | $500 | $1,025 |
| 616E10000 WATER | 1 MGAL | $1.00 | $1.00 | $150 | $67.90 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 45 SY | $24.00 | $65.00 | $55.00 | $54.20 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 34 SF | $10.00 | $10.00 | $10.00 | $13.33 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $3,000 | $5,000 | $4,000 | $3,056 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E94911 8' X 6' CONDUIT, TYPE A, 706.05, AS PER PLAN | 128 FT | $1,430 | $183k | 43% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 2,000 DLR | $21 | $42k | 10% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 35 CY | $750 | $26k | 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 66 CY | $365 | $24k | 6% |
| 511E46001 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 33 SY | $416 | $14k | 3% |
| 202E35200 PIPE REMOVED, OVER 24" | 134 FT | $98 | $13k | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $12,500 | $13k | 3% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 22 CY | $505 | $11k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 2% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (16 CY | $600 | $10k | 2% |