ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 122 more items below.
| Item | Quantity | R1Brumbaugh Construction INC | R2John R Jurgensen Company | R3Barrett Paving Materials INC | R4Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|
| 255E10110 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 2,602 SY | $208 | $282 | $290 | $250 | 18% |
| 826E10041 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), FI | 1,130 CY | $335 | $248 | $290 | $340 | 13% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 742 CY | $390 | $292 | $275 | $450 | 10% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 32,075 SF | $7.50 | $7.95 | $6.50 | $9.00 | 8% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 8,219 FT | $26.00 | $19.12 | $18.00 | $35.00 | 7% |
| 304E20000 AGGREGATE BASE | 1,712 CY | $90.00 | $147 | $105 |
| Item | Quantity | R1Brumbaugh Construction INC | R2John R Jurgensen Company | R3Barrett Paving Materials INC | R4Complete General Construction Company |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $38,000 | $13,625 | $35,000 | $30,000 |
| 202E23000 PAVEMENT REMOVED (CONCRETE BASE) | 1,539 SY | $14.00 | $23.72 | $26.00 | $40.00 |
| 202E23000 PAVEMENT REMOVED (CONCRETE) | 946 SY | $19.00 | $22.95 | $11.00 | $20.00 |
| 202E30000 WALK REMOVED | 11,198 SF | $2.50 | $3.00 | $3.00 | $3.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $95.00 |
| 5% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (345 CY | $389 | $483 | $350 | $350 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $110,000 | $89,122 | $195,000 | $250,000 | 4% |
| 611E98690 CATCH BASIN, MISC.:TYPE D CATCH BASIN | 26 EACH | $4,000 | $5,231 | $6,000 | $4,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $50,000 | $100,000 | $100,000 | 3% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 5,090 FT | $18.25 | $16.70 | $16.00 | $16.50 | 3% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 1,183 CY | $77.50 | $87.17 | $70.00 | $58.00 | 3% |
| 202E23000 PAVEMENT REMOVED (ASPHALT) | 5,893 SY | $13.50 | $13.77 | $11.00 | $10.00 | 3% |
| 625E10500 LIGHT POLE, MISC.:MONO ARM LIGHT POLE (AT12B32.5) | 17 EACH | $3,850 | $3,590 | $3,590 | $3,500 | 2% |
| 452E13011 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 538 SY | $110 | $101 | $95.00 | $120 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.75" THICK | 18,132 SY | $3.25 | $3.55 | $3.00 | $2.90 | 2% |
| 690E12040 SPECIAL - PAVEMENT CRACK AND JOINT REINFORCING FAB | 2,279 SY | $24.75 | $18.21 | $27.00 | $42.50 | 2% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 447 CY | $125 | $187 | $125 | $175 | 2% |
| 203E10000 EXCAVATION | 2,063 CY | $26.50 | $35.97 | $46.00 | $32.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $50,000 | $19,892 | $30,000 | $90,000 | 2% |
| 8.5 SY |
| $65.00 |
| $292 |
| $26.00 |
| $65.00 |
| 202E32000 CURB REMOVED | 7,781 FT | $4.25 | $8.79 | $5.00 | $6.00 |
| 202E32500 CURB AND GUTTER REMOVED | 412 FT | $11.00 | $15.06 | $7.00 | $11.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,064 FT | $19.00 | $28.76 | $30.00 | $40.00 |
| 202E53100 MAILBOX REMOVED | 9 EACH | $200 | $150 | $85.00 | $100 |
| 202E58000 MANHOLE REMOVED | 12 EACH | $1,250 | $793 | $850 | $1,600 |
| 202E58100 CATCH BASIN REMOVED | 26 EACH | $425 | $715 | $650 | $800 |
| 202E98100 REMOVAL MISC.: PRIVATE FLAG POLE AND CONCRETE BASE | 6 EACH | $700 | $1,937 | $150 | $250 |
| 203E20000 EMBANKMENT | 561 CY | $47.00 | $23.19 | $46.00 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 10,134 SY | $2.25 | $6.11 | $4.00 | $3.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 1,183 CY | $25.50 | $26.20 | $60.00 | $24.00 |
| 204E45000 PROOF ROLLING | 4 HOUR | $255 | $213 | $200 | $300 |
| 204E50000 GEOTEXTILE FABRIC | 474 SY | $2.65 | $6.95 | $5.00 | $3.00 |
| 204E51000 GEOGRID | 9,118 SY | $3.25 | $4.16 | $4.00 | $6.00 |
| 608E52001 CURB RAMP, AS PER PLAN | 1,527 SF | $27.00 | $23.52 | $23.00 | $28.00 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 9 EACH | $250 | $430 | $400 | $400 |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 617 TON | $64.00 | $24.50 | $50.00 | $100 |
| 690E98000 SPECIAL -MONITORING WELL ADJUSTED TO GRADE | 1 EACH | $940 | $574 | $3,500 | $1,000 |
| 659E00300 TOPSOIL | 968 CY | $43.00 | $10.00 | $85.00 | $25.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 8,725 SY | $3.00 | $0.92 | $1.40 | $2.45 |
| 659E14000 REPAIR SEEDING AND MULCHING | 436 SY | $2.00 | $0.78 | $1.40 | $0.80 |
| 659E15000 INTER-SEEDING | 436 SY | $2.00 | $0.78 | $1.00 | $0.10 |
| 659E20000 COMMERCIAL FERTILIZER | 1.96 TON | $775 | $993 | $875 | $530 |
| 659E31000 LIME | 1.8 ACRE | $100 | $154 | $70.00 | $80.00 |
| 659E35000 WATER | 47.1 MGAL | $2.00 | $1.00 | $1.00 | $0.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,350 | $2,000 | $2,000 | $5,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,750 | $11,775 | $14,000 | $12,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $13,150 | $11,838 | $12,000 | $12,000 |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00406 4" CONDUIT, TYPE F | 50 FT | $43.00 | $40.19 | $42.00 | $12.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 130 FT | $14.00 | $46.04 | $42.00 | $16.00 |
| 611E00900 6" CONDUIT, TYPE B | 50 FT | $40.00 | $44.00 | $42.00 | $30.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $40.00 | $44.00 | $42.00 | $20.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $40.00 | $44.00 | $42.00 | $10.00 |
| 611E01800 8" CONDUIT, TYPE B | 50 FT | $45.00 | $45.74 | $46.00 | $50.00 |
| 611E02500 8" CONDUIT, TYPE E | 50 FT | $45.00 | $45.74 | $46.00 | $20.00 |
| 611E04400 12" CONDUIT, TYPE B | 497 FT | $91.00 | $119 | $100 | $150 |
| 611E04600 12" CONDUIT, TYPE C | 47 FT | $107 | $145 | $100 | $100 |
| 611E05900 15" CONDUIT, TYPE B | 411 FT | $90.00 | $103 | $115 | $165 |
| 611E06100 15" CONDUIT, TYPE C | 29 FT | $106 | $110 | $115 | $130 |
| 611E07400 18" CONDUIT, TYPE B | 296 FT | $107 | $121 | $140 | $175 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $2,500 | $1,353 | $3,300 | $2,000 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $5,100 | $2,233 | $4,500 | $4,500 |
| 611E99582 MANHOLE, NO. 3 WITH 90" BASE I.D. AND 8" WEIR | 1 EACH | $10,500 | $14,856 | $9,000 | $15,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 4 EACH | $350 | $574 | $900 | $750 |
| 895E10020 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 2 | 1 EACH | $26,000 | $26,713 | $25,000 | $35,000 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE | — | $5.50 | $7.93 | $3.00 | $5.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 0.25" THICK | 2,232 SY | $2.75 | $2.68 | $3.00 | $2.37 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 7,490 FT | $2.45 | $1.90 | $3.50 | $3.75 |
| 407E20000 NON-TRACKING TACK COAT | 2,390 GAL | $1.10 | $15.00 | $3.50 | $1.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 318 CY | $90.00 | $82.79 | $90.00 | $150 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $500 | $635 | $625 | $450 |
| 441E70700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (31 CY | $778 | $564 | $450 | $700 |
| 452E10011 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 79 SY | $96.00 | $86.69 | $75.00 | $135 |
| 609E72000 CONCRETE MEDIAN | 8.5 SY | $162 | $177 | $125 | $250 |
| 690E12150 SPECIAL - ASPHALT REJUVENATING AGENT | 783 GAL | $36.00 | $32.30 | $34.00 | $32.00 |
| 690E12160 SPECIAL - TESTING | 1 LS | $500 | $500 | $500 | $500 |
| 638E10501 FIRE HYDRANT REMOVED AND RESET, AS PER PLAN | 1 EACH | $3,200 | $5,764 | $9,800 | $3,750 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 11 EACH | $150 | $121 | $700 | $220 |
| 638E10900 SERVICE BOX ADJUSTED TO GRADE | 2 EACH | $150 | $574 | $700 | $125 |
| 611E99654 MANHOLE ADJUSTED TO GRADE (SANITARY) | 16 EACH | $190 | $574 | $980 | $950 |
| 625E00450 CONNECTION, FUSED PULL APART | 34 EACH | $129 | $159 | $159 | $150 |
| 625E00470 CONNECTION, UNFUSED BOLTED | 6 EACH | $62.00 | $215 | $215 | $175 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 17 EACH | $1,310 | $1,770 | $1,770 | $1,600 |
| 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE | 9,582 FT | $2.20 | $3.45 | $3.45 | $3.25 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 2,856 FT | $1.45 | $2.00 | $2.00 | $2.00 |
| 625E25408 CONDUIT, 2", 725.051 | 2,888 FT | $9.65 | $11.70 | $11.70 | $11.00 |
| 625E25909 CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN, | 124 FT | $11.70 | $39.85 | $39.85 | $35.00 |
| 625E25909 CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN, | 231 FT | $17.00 | $38.75 | $38.75 | $60.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 17 EACH | $2,250 | $2,987 | $2,987 | $2,000 |
| 625E29000 TRENCH | 2,888 FT | $8.00 | $11.90 | $11.90 | $10.00 |
| 625E30510 PULL BOX, 725.06, SIZE 4 | 2 EACH | $1,025 | $1,080 | $1,080 | $1,200 |
| 625E31600 PULL BOX, MISC.: ADJUSTED TO GRADE | 2 EACH | $235 | $232 | $232 | $1,375 |
| 625E32000 GROUND ROD | 17 EACH | $425 | $298 | $298 | $400 |
| 625E34001 POWER SERVICE, AS PER PLAN | 2 EACH | $10,600 | $10,284 | $10,284 | $12,000 |
| 632E69900 SERVICE CABLE, 3 CONDUCTOR, NO. 4 AWG | 312 FT | $13.40 | $10.65 | $10.65 | $12.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 309 FT | $13.50 | $12.75 | $12.00 | $15.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 93 FT | $13.50 | $16.75 | $12.00 | $16.50 |
| 630E80100 SIGN, FLAT SHEET | 189.75 SF | $26.50 | $25.75 | $24.00 | $18.00 |
| 630E80511 SIGN, STREET NAME, AS PER PLAN | 12 EACH | $26.50 | $260 | $150 | $245 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 33 EACH | $22.00 | $20.00 | $20.00 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 18 EACH | $22.00 | $30.00 | $20.00 | $20.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 2 EACH | $56.00 | $45.00 | $50.00 | $20.00 |
| 630E87510 REMOVAL OF POLE MOUNTED SIGN AND STORAGE | 1 EACH | $115 | $46.00 | $100 | $25.00 |
| 630E97700 SIGNING, MISC.:REMOVAL OF ENCROACHMENT SIGNS AND S | 2 EACH | $115 | $775 | $100 | $1,500 |
| 644E00104 EDGE LINE, 6" | 1.62 MILE | $4,500 | $5,500 | $4,000 | $5,500 |
| 644E00300 CENTER LINE | 1.2 MILE | $8,350 | $6,500 | $7,500 | $6,500 |
| 644E00400 CHANNELIZING LINE, 8" | 713 FT | $2.20 | $1.80 | $2.00 | $1.80 |
| 644E00500 STOP LINE | 219 FT | $8.90 | $7.84 | $8.00 | $7.84 |
| 644E00630 CROSSWALK LINE, 24" | 605 FT | $7.80 | $7.84 | $7.00 | $7.84 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 54 FT | $7.80 | $7.44 | $7.00 | $7.44 |
| 644E00720 CHEVRON MARKING | 653 FT | $7.80 | $7.44 | $7.00 | $7.44 |
| 644E01200 PARKING LOT STALL MARKING | 17 FT | $11.00 | $3.92 | $10.00 | $3.92 |
| 644E01300 LANE ARROW | 29 EACH | $110 | $99.00 | $100 | $99.00 |
| 644E01400 WORD ON PAVEMENT, 72" | 1 EACH | $400 | $240 | $350 | $240 |
| 644E01510 DOTTED LINE, 6" | 740 FT | $1.70 | $1.80 | $1.50 | $1.80 |
| 644E01630 BIKE LANE SYMBOL MARKING | 22 EACH | $400 | $435 | $350 | $435 |
| 644E20800 YIELD LINE | 13 FT | $11.00 | $40.00 | $10.00 | $40.00 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 127 FT | $39.00 | $15.70 | $35.00 | $15.70 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $75.00 | $115 | $85.00 | $95.00 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $275 | $150 | $256 | $365 |
| 614E12600 REPLACEMENT DRUM | 15 EACH | $70.00 | $60.00 | $64.00 | $72.00 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1.2 MILE | $1,840 | $2,260 | $1,750 | $2,260 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.15 MILE | $3,685 | $2,260 | $3,500 | $2,260 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.2 MILE | $1,580 | $2,260 | $1,500 | $2,260 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 1.6 MILE | $1,315 | $1,510 | $1,250 | $1,510 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 1.6 MILE | $1,050 | $1,510 | $1,000 | $1,510 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 713 FT | $1.05 | $0.75 | $1.00 | $0.75 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 300 FT | $2.10 | $0.75 | $2.00 | $0.75 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 713 FT | $1.05 | $0.75 | $1.00 | $0.75 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 219 FT | $3.15 | $4.75 | $3.00 | $4.75 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 219 FT | $3.15 | $4.75 | $3.00 | $4.75 |
| 614E30000 WORK ZONE ARROW, CLASS I | 15 EACH | $37.00 | $65.00 | $35.00 | $65.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 15 EACH | $37.00 | $65.00 | $35.00 | $65.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 2 CY | $215 | $1,403 | $2,700 | $807 |
| 616E10000 WATER | 12 MGAL | $5.00 | $60.29 | $25.00 | $89.28 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $25,911 | $28,465 | $32,450 | $27,000 |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $2,250 | $2,068 | $1,500 | $2,250 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 255E10110 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 2,602 SY | $207.5 | $540k | 13% |
| 826E10041 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), FI | 1,130 CY | $335 | $379k | 9% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 742 CY | $390 | $289k | 7% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 32,075 SF | $7.5 | $241k | 6% |
| 609E26001 CURB, TYPE 6, AS PER PLAN | 8,219 FT | $26 | $214k | 5% |
| 304E20000 AGGREGATE BASE | 1,712 CY | $90 | $154k | 4% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (345 CY | $389 | $134k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $110,000 | $110k | 3% |
| 611E98690 CATCH BASIN, MISC.:TYPE D CATCH BASIN | 26 EACH | $4,000 | $104k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 2% |