Published by ODOT on this contract’s Proposal PDF · EDGE Goal: 5.0%
5.0%EDGE / SBE GoalEDGE = Encouraging Diversity, Growth & Equity — Ohio state-level program for certified businesses owned by economically disadvantaged individuals. Renamed Small Business Enterprise (SBE) in 2025+. Stacks alongside the federal DBE goal.
Project scope
Bid tab · ODOT
Curb, Walk & Ramp18%
Erosion & Landscaping14%
Pavement Marking14%
Asphalt Paving11%
Signs11%
Maintaining Traffic11%
Other
Per-bidder unit pricing
ODOT bid tab line items with each bidder’s unit price. Top 20 items by low bid’s extended amount · 8 more items below.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$550
$600
1%
608E52000CURB RAMP
817.5 SF
$9.00
$26.00
1%
251E01041PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA
30 SY
$225
$500
1%
609E26001CURB, TYPE 6, AS PER PLAN
210 FT
$30.00
$49.00
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$6,000
$4,000
1%
614E98100WORK ZONE PAVEMENT MARKING, MISC.:ANDICAPPED PARKI
1,830 FT
$3.02
$1.25
1%
644E01600HANDICAP SYMBOL MARKING
40 EACH
$131
$160
1%
202E30000WALK REMOVED
1,495 SF
$3.25
$5.00
0%
608E100004" CONCRETE WALK
677.5 SF
$6.00
$12.00
0%
202E32001CURB REMOVED, AS PER PLAN
185 FT
$12.00
$18.00
0%
644E00500STOP LINE
378 FT
$5.00
$10.00
0%
630E03100GROUND MOUNTED SUPPORT, NO. 3 POST
100 FT
$16.00
$24.00
0%
623E10001CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P