SUM-SR 176/SR 303-00.23/00.00
SUM County · est $2.7M
Bid dateThursday, August 11—
SUM County · est $2.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 71 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Shelly Company | R3Karvo Companies INC | R4Kokosing Construction Company INC | R5Barbicas Construction Company INC | R6Chagrin Valley Paving INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (4902 CY | $250 | $245 | $265 | $258 | $300 | $265 | 59% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1") | 167,631 SY | $0.65 | $1.00 | $1.50 | $1.10 | $3.00 | $3.00 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $101,461 | $180,000 | $183,000 |
| Item | Quantity | R1Shelly & Sands INC | R2Shelly Company | R3Karvo Companies INC | R4Kokosing Construction Company INC | R5Barbicas Construction Company INC | R6Chagrin Valley Paving INC |
|---|---|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 884 SF | $6.50 | $5.00 | $7.00 | $5.00 | $5.00 | $4.00 |
| 202E32000 CURB REMOVED | 340 FT | $9.00 | $15.00 | $20.00 | $15.00 | $7.00 | $12.00 |
| 202E38000 GUARDRAIL REMOVED | 226 FT | $2.00 | $2.00 | $2.20 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $230,972 |
| $150,000 |
| $325,000 |
| 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $167,024 | $100,000 | $125,000 | $150,000 | 5% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN (T=2") | 1,147 CY | $70.00 | $60.00 | $95.00 | $50.00 | $70.00 | $80.00 | 4% |
| 646E10010 EDGE LINE, 6" | 18.04 MILE | $3,450 | $3,476 | $3,450 | $3,476 | $3,450 | $3,450 | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,300 SY | $40.00 | $45.00 | $50.00 | $138 | $30.00 | $60.00 | 2% |
| 407E20000 NON-TRACKING TACK COAT @ 0.09 GAL/SY | 15,879 GAL | $3.00 | $2.85 | $3.25 | $2.75 | $4.00 | $2.00 | 2% |
| 646E10200 CENTER LINE | 9.02 MILE | $4,750 | $4,376 | $4,750 | $4,376 | $4,750 | $4,750 | 2% |
| 209E60200 LINEAR GRADING | 802 STA | $48.00 | $30.00 | $47.94 | $64.00 | $15.00 | $20.00 | 2% |
| 408E10001 PRIME COAT, AS PER PLAN @ 0.4 GAL/SY | 8,255 GAL | $4.00 | $3.75 | $5.00 | $4.50 | $6.50 | $2.00 | 2% |
| 252E01000 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 200 SY | $140 | $160 | $180 | $253 | $125 | $200 | 1% |
| 611E04400 12" CONDUIT, TYPE B | 210 FT | $110 | $300 | $85.00 | $45.00 | $80.00 | $300 | 1% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 15 EACH | $1,500 | $1,500 | $1,500 | $1,500 | $1,000 | $1,500 | 1% |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 36.08 MILE | $600 | $588 | $600 | $837 | $600 | $600 | 1% |
| 621E00100 RPM (YELLOW/YELLOW) | 630 EACH | $32.50 | $32.50 | $33.50 | $32.50 | $32.50 | $71.00 | 1% |
| 608E52000 CURB RAMP | 662 SF | $30.50 | $22.00 | $22.00 | $22.00 | $15.00 | $40.00 | 1% |
| 659E10000 SEEDING AND MULCHING | 22,284 SY | $0.83 | $0.83 | $1.25 | $1.95 | $1.00 | $1.00 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,000 | $3,000 | $2,000 | $2,600 | $1,000 | $1,500 | 1% |
| 516E14600 STRUCTURAL JOINT OR JOINT SEALER, MISC.: SILICON S | 107 FT | $150 | $150 | $150 | $150 | $232 | $232 | 1% |
| $5.00 |
| $2.00 |
| 203E10000 EXCAVATION | 50 CY | $105 | $30.00 | $50.00 | $35.00 | $45.00 | $30.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 88 FT | $36.40 | $36.40 | $36.00 | $36.40 | $36.40 | $36.40 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 38 FT | $38.60 | $38.60 | $39.60 | $38.60 | $38.60 | $38.60 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(MASH 2016) | 2 EACH | $3,280 | $3,280 | $3,495 | $3,280 | $3,280 | $3,280 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $3,140 | $3,140 | $3,320 | $3,140 | $3,140 | $3,140 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 1 EACH | $1,260 | $1,260 | $1,475 | $1,260 | $1,260 | $1,260 |
| 608E10000 4" CONCRETE WALK | 272 SF | $13.00 | $10.00 | $25.00 | $10.00 | $10.00 | $12.00 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $2,000 | $2,000 | $2,000 | $2,000 | $1,500 | $1,500 |
| 625E31600 PULL BOX, MISC.: ADJUSTED TO GRADE | 3 EACH | $1,750 | $1,750 | $200 | $1,750 | $300 | $1,500 |
| 659E20000 COMMERCIAL FERTILIZER | 2.99 TON | $900 | $901 | $1,200 | $910 | $910 | $901 |
| 659E31000 LIME | 4.6 ACRE | $154 | $154 | $0.01 | $50.00 | $50.00 | $154 |
| 659E35000 WATER | 120.3 MGAL | $1.00 | $1.00 | $0.01 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98150 CATCH BASIN, NO. 3 | 2 EACH | $4,300 | $7,500 | $4,500 | $5,500 | $3,000 | $7,100 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 3 EACH | $2,000 | $2,000 | $2,000 | $2,000 | $2,000 | $1,900 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $3,500 | $3,500 | $3,500 | $3,500 | $2,000 | $3,000 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 900 LB | $4.00 | $4.00 | $4.00 | $4.00 | $2.00 | $4.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,650 FT | $4.00 | $5.00 | $3.50 | $4.85 | $4.00 | $3.00 |
| 253E01000 PAVEMENT REPAIR | 100 SY | $142 | $280 | $180 | $791 | $100 | $275 |
| 304E20000 AGGREGATE BASE | 50 CY | $98.00 | $45.00 | $40.00 | $80.00 | $50.00 | $100 |
| 609E26000 CURB, TYPE 6 | 340 FT | $45.00 | $29.00 | $50.00 | $29.00 | $35.00 | $48.00 |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T = 2 | 4,400 SY | $0.75 | $2.40 | $1.50 | $1.55 | $6.00 | $4.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 743 EACH | $5.00 | $4.00 | $2.00 | $7.30 | $3.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 7 EACH | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 265 FT | $10.00 | $10.00 | $10.00 | $11.00 | $10.00 | $11.00 |
| 630E80100 SIGN, FLAT SHEET | 60 SF | $18.50 | $18.50 | $18.50 | $15.00 | $18.50 | $18.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 22 SF | $18.50 | $18.50 | $18.50 | $15.00 | $18.50 | $18.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 26 EACH | $30.00 | $30.00 | $30.00 | $12.00 | $30.00 | $35.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 26 EACH | $30.00 | $30.00 | $30.00 | $16.00 | $30.00 | $30.00 |
| 646E10110 LANE LINE, 6" | 1.7 MILE | $1,900 | $1,976 | $1,900 | $1,976 | $1,900 | $1,900 |
| 646E10300 CHANNELIZING LINE, 8" | 2,350 FT | $2.00 | $1.80 | $2.00 | $1.76 | $2.00 | $2.00 |
| 646E10400 STOP LINE | 182 FT | $16.00 | $12.00 | $16.00 | $12.00 | $16.00 | $16.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 495 FT | $16.00 | $8.50 | $16.00 | $8.50 | $16.00 | $16.00 |
| 646E10800 ISLAND MARKING | 114 SF | $16.00 | $7.00 | $16.00 | $7.00 | $16.00 | $16.00 |
| 646E20110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $625 | $675 | $625 | $675 | $625 | $625 |
| 646E20300 LANE ARROW | 32 EACH | $150 | $160 | $150 | $160 | $150 | $150 |
| 646E20350 LANE REDUCTION ARROW | 2 EACH | $200 | $300 | $200 | $300 | $200 | $200 |
| 646E20504 DOTTED LINE, 6" | 690 FT | $1.25 | $2.00 | $1.25 | $2.00 | $1.25 | $1.25 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 4 EACH | $1,250 | $1,250 | $1,250 | $1,250 | $1,250 | $1,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $75.00 | $65.00 | $75.00 | $13.83 | $80.00 | $100 |
| 614E12460 WORK ZONE MARKING SIGN | 41 EACH | $55.00 | $55.00 | $55.00 | $55.00 | $75.00 | $55.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 21 CY | $400 | $125 | $275 | $235 | $200 | $321 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $920 | $900 | $900 | $900 | $900 | $900 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 1.69 MILE | $600 | $650 | $600 | $650 | $600 | $600 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 1.69 MILE | $600 | $590 | $600 | $590 | $600 | $600 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 9.02 MILE | $1,000 | $1,275 | $1,000 | $1,275 | $2,000 | $1,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 9.02 MILE | $1,000 | $990 | $1,000 | $990 | $2,000 | $1,000 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 2,350 FT | $0.50 | $0.60 | $0.50 | $0.59 | $0.50 | $0.50 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 2,350 FT | $0.50 | $0.60 | $0.50 | $0.57 | $0.50 | $0.50 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 182 FT | $3.95 | $3.20 | $3.95 | $3.20 | $3.95 | $3.95 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 182 FT | $3.95 | $3.10 | $3.95 | $3.10 | $3.95 | $3.95 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $3,000 | $3,000 | $3,000 | $3,000 | $2,000 | $1,575 |
| 519E12304 PATCHING CONCRETE BRIDGE DECK - TYPE C | 3 SY | $750 | $750 | $750 | $750 | $914 | $914 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $3,000 | $3,000 | $3,000 | $3,000 | $2,000 | $1,575 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 12 SY | $60.00 | $60.00 | $60.00 | $60.00 | $42.10 | $43.00 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 431 SY | $20.00 | $20.00 | $20.00 | $20.00 | $18.60 | $18.60 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 100 SF | $130 | $130 | $130 | $130 | $130 | $131 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 431 SY | $15.00 | $15.00 | $15.00 | $15.00 | $36.50 | $43.00 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $3,000 | $3,000 | $3,000 | $3,000 | $2,000 | $1,575 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $3,000 | $3,000 | $3,000 | $3,000 | $2,000 | $1,575 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 12 SY | $70.00 | $70.00 | $70.00 | $70.00 | $36.50 | $43.00 |
| 512E73500 TREATING CONCRETE BRIDGE DECKS WITH GRAVITY FED RE | 451 SY | $17.00 | $17.00 | $17.00 | $17.00 | $12.80 | $26.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 100 SF | $130 | $130 | $130 | $130 | $130 | $131 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $2,500 | $2,500 | $2,500 | $2,500 | $2,000 | $1,575 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 12 SY | $60.00 | $60.00 | $60.00 | $60.00 | $42.10 | $43.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 100 SF | $130 | $130 | $130 | $130 | $130 | $131 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $12,500 | $18,000 | $11,520 | $40,000 | $25,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,002 | $4,250 | $4,500 | $3,000 | $400 | $250 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (4902 CY | $250 | $1.23M | 51% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T=1") | 167,631 SY | $0.65 | $109k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $101,461 | $101k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN (T=2") | 1,147 CY | $70 | $80k | 3% |
| 646E10010 EDGE LINE, 6" | 18.04 MILE | $3,450 | $62k | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,300 SY | $40 | $52k | 2% |
| 407E20000 NON-TRACKING TACK COAT @ 0.09 GAL/SY | 15,879 GAL | $3 | $48k | 2% |
| 646E10200 CENTER LINE | 9.02 MILE | $4,750 | $43k | 2% |
| 209E60200 LINEAR GRADING | 802 STA | $48 | $38k | 2% |