HAS-SR 646-06.33
HAS County · est $0.7M
Bid dateThursday, September 15—
HAS County · est $0.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 50 more items below.
| Item | Quantity | R1Tucson INC | R2Shelly & Sands INC | R3Ohio-west Virginia Excavating CO | R4Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 1,753 SY | $51.00 | $60.00 | $62.00 | $80.00 | 16% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 812 FT | $58.00 | $50.00 | $38.96 | $27.00 | 9% |
| 611E13400 30" CONDUIT, TYPE B | 291 FT | $155 | $160 | $297 | $205 | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 126 CY | $350 | $425 | $312 | $390 | 8% |
| 611E10600 24" CONDUIT, TYPE C | 330 FT | $104 | $90.00 | $135 | $125 | 6% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 63 CY | $525 | $550 | $398 | $557 |
| Item | Quantity | R1Tucson INC | R2Shelly & Sands INC | R3Ohio-west Virginia Excavating CO | R4Eclipse CO LLC |
|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 1,201 SF | $3.00 | $1.00 | $2.10 | $2.00 |
| 202E32000 CURB REMOVED | 582 FT | $12.75 | $6.00 | $10.66 | $4.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 191 FT | $22.25 | $28.00 | $19.67 | $23.00 |
| 202E53100 MAILBOX REMOVED | 4 EACH | $77.75 | $125 | $101 | $43.00 |
| 202E58100 CATCH BASIN REMOVED | 11 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 611E99574 MANHOLE, NO. 3 | 7 EACH | $3,985 | $4,500 | $6,822 | $6,000 | 5% |
| 304E20000 AGGREGATE BASE | 267 CY | $98.50 | $115 | $115 | $111 | 5% |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN, 706.02 | 201 FT | $130 | $100 | $135 | $140 | 5% |
| 611E98180 CATCH BASIN, NO. 3A | 9 EACH | $2,330 | $3,000 | $3,093 | $5,000 | 4% |
| 203E10000 EXCAVATION | 664 CY | $31.00 | $15.00 | $30.51 | $32.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $18,600 | $20,000 | $14,000 | $35,603 | 3% |
| 611E10400 24" CONDUIT, TYPE B | 132 FT | $128 | $110 | $230 | $175 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,400 | $24,000 | $15,295 | $28,280 | 3% |
| 202E23000 PAVEMENT REMOVED | 1,277 SY | $12.00 | $12.00 | $10.16 | $6.00 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 43 CY | $351 | $250 | $253 | $190 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $14,500 | $3,000 | $9,450 | $19,000 | 3% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 764 FT | $16.50 | $13.00 | $25.46 | $25.00 | 2% |
| 530E01300 SPECIAL - STRUCTURES: RETAINING WALL | 37 FT | $325 | $250 | $373 | $900 | 2% |
| 609E26000 CURB, TYPE 6 | 286 FT | $41.00 | $52.00 | $39.14 | $55.00 | 2% |
| $490 |
| $300 |
| $612 |
| $299 |
| 202E75000 FENCE REMOVED | 132 FT | $9.75 | $4.00 | $10.12 | $5.00 |
| 202E98200 REMOVAL MISC.:: RETAINING WALL | 37 FT | $19.50 | $20.00 | $37.16 | $63.00 |
| 203E20000 EMBANKMENT | 29 CY | $21.50 | $35.00 | $94.58 | $23.00 |
| 204E10000 SUBGRADE COMPACTION | 1,570 SY | $1.75 | $2.50 | $1.65 | $1.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 48 CY | $21.75 | $25.00 | $53.96 | $45.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 48 CY | $77.75 | $100 | $130 | $128 |
| 204E45000 PROOF ROLLING | 2 HOUR | $175 | $250 | $268 | $325 |
| 204E51000 GEOGRID | 143 SY | $5.75 | $10.00 | $5.28 | $2.00 |
| 608E10000 4" CONCRETE WALK | 1,555 SF | $7.50 | $8.00 | $15.09 | $13.00 |
| 608E52000 CURB RAMP | 197 SF | $14.00 | $50.00 | $52.89 | $23.00 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 4 EACH | $215 | $250 | $215 | $280 |
| 659E00300 TOPSOIL | 55 CY | $83.00 | $75.00 | $102 | $87.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 494 SY | $4.00 | $7.00 | $8.73 | $10.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 25 SY | $1.60 | $0.80 | $8.73 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.07 TON | $2,850 | $900 | $1,746 | $996 |
| 659E31000 LIME | 0.11 ACRE | $1,700 | $150 | $99.82 | $161 |
| 659E35000 WATER | 3 MGAL | $17.25 | $1.00 | $1.25 | $1.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E01500 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 35 FT | $21.00 | $50.00 | $26.27 | $34.00 |
| 611E04400 12" CONDUIT, TYPE B | 78 FT | $87.50 | $70.00 | $97.73 | $120 |
| 611E04600 12" CONDUIT, TYPE C | 94 FT | $83.50 | $60.00 | $83.71 | $92.00 |
| 611E07400 18" CONDUIT, TYPE B | 17 FT | $124 | $80.00 | $87.61 | $130 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $1,665 | $2,300 | $2,194 | $4,800 |
| 638E10500 FIRE HYDRANT REMOVED AND RESET | 1 EACH | $650 | $6,000 | $4,889 | $4,651 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 4 EACH | $725 | $500 | $489 | $1,909 |
| 638E10900 SERVICE BOX ADJUSTED TO GRADE | 2 EACH | $725 | $490 | $489 | $1,909 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 100 FT | $13.25 | $8.00 | $17.50 | $25.00 |
| 611E00901 6" CONDUIT, TYPE B, AS PER PLAN | 100 FT | $36.75 | $30.00 | $79.73 | $60.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $920 | $850 | $1,133 | $1,909 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 150 FT | $10.80 | $18.00 | $18.71 | $22.00 |
| 630E08510 STREET NAME SIGN SUPPORT, NO. 2 POST | 12.5 FT | $19.50 | $19.00 | $62.37 | $25.00 |
| 630E08600 SIGN POST REFLECTOR | 3 EACH | $27.00 | $45.00 | $125 | $62.00 |
| 630E80100 SIGN, FLAT SHEET | 86 SF | $16.25 | $20.00 | $49.90 | $25.00 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 2 EACH | $32.50 | $209 | $312 | $267 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 20 EACH | $27.00 | $10.00 | $93.55 | $12.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 9 EACH | $27.00 | $16.00 | $93.55 | $19.00 |
| 642E00300 CENTER LINE, TYPE 1 | 1.01 MILE | $1,900 | $1,800 | $2,183 | $1,916 |
| 642E00500 STOP LINE, TYPE 1 | 39 FT | $12.00 | $11.00 | $13.72 | $12.00 |
| 642E00620 CROSSWALK LINE, 12", TYPE 1 | 40 FT | $9.75 | $9.00 | $11.23 | $10.00 |
| 407E10000 TACK COAT | 196 GAL | $4.50 | $3.30 | $5.61 | $4.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,000 | $3,600 | $4,491 | $3,744 |
| 616E10000 WATER | 5 MGAL | $17.25 | $100 | $1.25 | $40.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,250 | $3,500 | $9,955 | $15,000 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $1,150 | $3,900 | $3,740 | $684 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,525 | $10,000 | $9,355 | $11,197 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 1,753 SY | $51 | $89k | 13% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 812 FT | $58 | $47k | 7% |
| 611E13400 30" CONDUIT, TYPE B | 291 FT | $155.25 | $45k | 7% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 126 CY | $350 | $44k | 6% |
| 611E10600 24" CONDUIT, TYPE C | 330 FT | $103.75 | $34k | 5% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 63 CY | $525 | $33k | 5% |
| 611E99574 MANHOLE, NO. 3 | 7 EACH | $3,985 | $28k | 4% |
| 304E20000 AGGREGATE BASE | 267 CY | $98.5 | $26k | 4% |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN, 706.02 | 201 FT | $130 | $26k | 4% |
| 611E98180 CATCH BASIN, NO. 3A | 9 EACH | $2,330 | $21k | 3% |