MAH-SR 170-13.19
MAH County · est $1.4M
Bid dateThursday, September 29—
MAH County · est $1.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 34 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Karvo Companies INC | R3Shelly Company | R4Chagrin Valley Paving INC | % of bid |
|---|---|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (1809 CY | $295 | $269 | $271 | $275 | 48% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 70 EACH | $1,300 | $1,700 | $1,300 | $1,750 | 8% |
| 608E52000 CURB RAMP | 4,663 SF | $19.29 | $12.45 | $19.30 | $15.30 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $56,447 | $81,500 | $125,500 | $160,000 | 5% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T = 1 | 65,069 SY | $0.85 | $1.15 | $1.75 | $3.00 | 5% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 41 EACH | $1,200 | $1,050 | $1,200 | $1,250 |
| Item | Quantity | R1Shelly & Sands INC | R2Karvo Companies INC | R3Shelly Company | R4Chagrin Valley Paving INC |
|---|---|---|---|---|---|
| 202E32000 CURB REMOVED | 96 FT | $10.00 | $43.00 | $10.00 | $25.00 |
| 203E10000 EXCAVATION | 17 CY | $125 | $125 | $20.00 | $75.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $1,100 | $500 | $1,800 | $1,250 |
| 611E99660 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $65,000 | $40,000 | $90,000 | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 500 SY | $55.00 | $75.00 | $80.00 | $90.00 | 2% |
| 202E30000 WALK REMOVED | 5,759 SF | $4.00 | $5.35 | $4.00 | $6.50 | 2% |
| 253E01000 PAVEMENT REPAIR | 100 SY | $225 | $140 | $255 | $400 | 2% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 22 EACH | $950 | $1,575 | $950 | $1,250 | 2% |
| 407E20000 NON-TRACKING TACK COAT @ 0.09 GAL/SY | 5,857 GAL | $3.00 | $3.00 | $2.50 | $2.00 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $75.00 | $75.00 | $75.00 | $100 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,500 | $1,750 | $2,500 | $1,500 | 1% |
| 608E10000 4" CONCRETE WALK | 1,327 SF | $9.50 | $7.25 | $9.50 | $6.95 | 1% |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 9 EACH | $1,300 | $1,700 | $1,300 | $1,250 | 1% |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 6 EACH | $1,800 | $1,675 | $1,800 | $1,750 | 1% |
| 632E27005 LOOP DETECTOR UNIT, AS PER PLAN | 8 EACH | $1,300 | $1,300 | $1,300 | $1,300 | 1% |
| 646E10200 CENTER LINE | 2.32 MILE | $4,289 | $6,000 | $6,000 | $6,000 | 1% |
| 646E10520 CROSSWALK LINE, 24" | 857 FT | $11.29 | $15.00 | $15.00 | $15.00 | 1% |
| 4 EACH |
| $2,000 |
| $1,675 |
| $2,000 |
| $1,750 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 2,550 LB | $3.00 | $1.75 | $3.00 | $3.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 600 FT | $4.00 | $3.49 | $3.00 | $8.00 |
| 304E20000 AGGREGATE BASE | 17 CY | $90.00 | $100 | $65.00 | $125 |
| 609E26000 CURB, TYPE 6 | 96 FT | $65.00 | $30.00 | $65.00 | $35.00 |
| 638E10400 FIRE HYDRANT ADJUSTED TO GRADE | 1 EACH | $4,000 | $800 | $5,000 | $5,000 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $200 | $225 | $950 | $1,250 |
| 646E10010 EDGE LINE, 6" | 0.32 MILE | $3,277 | $8,500 | $8,500 | $8,500 |
| 646E10110 LANE LINE, 6" | 4.64 MILE | $1,146 | $1,500 | $1,500 | $1,500 |
| 646E10310 CHANNELIZING LINE, 12" | 948 FT | $1.92 | $3.50 | $3.50 | $3.50 |
| 646E10400 STOP LINE | 525 FT | $11.33 | $15.00 | $15.00 | $15.00 |
| 646E10510 CROSSWALK LINE, 12" | 513 FT | $7.16 | $7.50 | $7.50 | $7.50 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 179 FT | $8.29 | $15.00 | $15.00 | $15.00 |
| 646E10800 ISLAND MARKING | 91 SF | $7.16 | $15.00 | $15.00 | $15.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 4 EACH | $577 | $1,000 | $1,000 | $1,000 |
| 646E20300 LANE ARROW | 18 EACH | $157 | $250 | $250 | $250 |
| 614E12460 WORK ZONE MARKING SIGN | 40 EACH | $120 | $85.00 | $85.00 | $85.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $322 | $180 | $120 | $400 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,100 | $900 | $900 | $900 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 3.55 MILE | $450 | $600 | $450 | $600 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 3.55 MILE | $450 | $600 | $450 | $600 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 4.33 MILE | $950 | $1,250 | $950 | $1,250 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 4.33 MILE | $950 | $1,250 | $950 | $1,250 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 847 FT | $1.00 | $0.65 | $1.00 | $0.65 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 847 FT | $1.00 | $0.65 | $1.00 | $0.65 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 521 FT | $2.00 | $3.50 | $2.00 | $3.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 521 FT | $2.00 | $3.50 | $2.00 | $3.50 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $2,000 | $5,000 | $2,500 | $5,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,391 | $6,500 | $5,000 | $15,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $2,000 | $5,000 | $3,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E14001 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 448 (1809 CY | $295 | $534k | 44% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 70 EACH | $1,300 | $91k | 7% |
| 608E52000 CURB RAMP | 4,663 SF | $19.29 | $90k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $56,447 | $56k | 5% |
| 897E01010 PAVEMENT PLANING, ASPHALT CONCRETE, CLASS A (T = 1 | 65,069 SY | $0.85 | $55k | 5% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 41 EACH | $1,200 | $49k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 500 SY | $55 | $28k | 2% |
| 202E30000 WALK REMOVED | 5,759 SF | $4 | $23k | 2% |
| 253E01000 PAVEMENT REPAIR | 100 SY | $225 | $23k | 2% |