ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Brumbaugh Construction INC | R2J & J Schlaegel INC | R3Sunesis Construction CO | R4Double Z Construction Company | R5Complete General Construction Company | R6Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E96493 20' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN | 54 FT | $2,500 | $3,258 | $2,582 | $2,400 | $4,800 | $2,622 | 34% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $35,000 | $12,500 | $23,581 | $30,000 | $50,000 | $63,426 | 9% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 62 CY | $500 | $550 |
| Item | Quantity | R1Brumbaugh Construction INC | R2J & J Schlaegel INC | R3Sunesis Construction CO | R4Double Z Construction Company | R5Complete General Construction Company | R6Eclipse CO LLC |
|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 313 SY | $12.00 | $15.00 | $9.10 | $19.00 | $17.00 | $9.00 |
| 202E30000 WALK REMOVED | 599 SF | $4.00 | $3.00 | $1.10 | $3.50 | $3.75 | $2.00 |
| 202E32000 CURB REMOVED | 160 FT | $10.00 | $10.00 | $5.56 | $8.00 | $12.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $632 |
| $650 |
| $600 |
| $796 |
| 8% |
| 517E76300 RAILING, MISC.: PEDESTRIAN TUBULAR STEEL, AS PER P | 85 FT | $350 | $312 | $324 | $250 | $312 | $335 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $23,832 | $9,600 | $32,195 | $30,000 | $20,000 | $49,602 | 6% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 19 CY | $850 | $1,200 | $1,149 | $1,350 | $1,400 | $1,791 | 4% |
| 503E21100 UNCLASSIFIED EXCAVATION | 530 CY | $25.00 | $20.00 | $47.25 | $75.00 | $45.00 | $35.00 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 27 CY | $425 | $420 | $504 | $420 | $550 | $561 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $7,500 | $7,061 | $29,000 | $15,000 | $19,000 | 3% |
| 690E98400 SPECIAL - BYPASS PUMPING | 1 LS | $10,000 | $7,500 | $13,396 | $18,500 | $4,500 | $18,949 | 3% |
| 611E99574 MANHOLE, NO. 3 | 3 EACH | $3,300 | $4,800 | $3,803 | $4,550 | $7,000 | $5,136 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 23 CY | $425 | $420 | $605 | $430 | $617 | $630 | 2% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 67 CY | $140 | $130 | $278 | $143 | $175 | $126 | 2% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 6,317 LB | $1.25 | $1.91 | $2.40 | $2.13 | $2.50 | $7.00 | 2% |
| 609E24510 CURB, TYPE 4-C | 160 FT | $45.00 | $54.00 | $38.48 | $38.00 | $50.00 | $32.00 | 2% |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $3,600 | $4,800 | $4,414 | $4,550 | $5,500 | $5,025 | 2% |
| 607E23000 FENCE, TYPE CLT | 74 FT | $90.00 | $72.50 | $73.13 | $75.00 | $72.50 | $78.00 | 2% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 6 CY | $1,100 | $1,200 | $1,137 | $1,250 | $2,100 | $2,117 | 2% |
| 608E10000 4" CONCRETE WALK | 726 SF | $9.00 | $13.00 | $10.94 | $10.00 | $8.00 | $11.00 | 2% |
| 530E50010 SPECIAL - RETAINING WALL (CELLULAR) | 80 SF | $80.00 | $65.00 | $52.74 | $123 | $94.59 | $353 | 2% |
| $5.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 36 FT | $20.00 | $25.00 | $18.25 | $18.00 | $25.00 | $25.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 17 FT | $50.00 | $50.00 | $14.69 | $40.00 | $30.00 | $26.00 |
| 202E75000 FENCE REMOVED | 51 FT | $6.00 | $18.00 | $18.16 | $9.00 | $18.00 | $19.00 |
| 203E10000 EXCAVATION | 81 CY | $16.00 | $30.00 | $36.33 | $90.00 | $35.00 | $64.00 |
| 203E20000 EMBANKMENT | 9 CY | $16.00 | $50.00 | $82.08 | $40.00 | $45.00 | $230 |
| 204E10000 SUBGRADE COMPACTION | 331 SY | $1.50 | $2.00 | $2.92 | $7.00 | $3.75 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 72 FT | $5.00 | $14.00 | $3.15 | $7.00 | $3.00 | $30.00 |
| 607E61200 GATE, TYPE CLT | 1 EACH | $2,900 | $2,165 | $2,184 | $1,500 | $2,165 | $2,326 |
| 659E00300 TOPSOIL | 42 CY | $55.00 | $65.00 | $59.81 | $90.00 | $45.00 | $72.00 |
| 659E10000 SEEDING AND MULCHING | 374 SY | $6.00 | $7.00 | $6.64 | $11.51 | $15.00 | $8.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $750 | $1,000 | $2,306 | $2,286 | $1,000 | $1,558 |
| 659E31000 LIME | 0.1 ACRE | $5.00 | $500 | $115 | $114 | $80.00 | $269 |
| 659E35000 WATER | 1 MGAL | $5.00 | $100 | $17.30 | $17.15 | $50.00 | $2.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E07400 18" CONDUIT, TYPE B | 37 FT | $110 | $125 | $157 | $140 | $225 | $159 |
| 611E13400 30" CONDUIT, TYPE B | 34 FT | $175 | $160 | $238 | $215 | $260 | $207 |
| 611E13600 30" CONDUIT, TYPE C | 7 FT | $200 | $150 | $517 | $195 | $225 | $190 |
| 304E20000 AGGREGATE BASE | 48 CY | $60.00 | $85.00 | $106 | $100 | $130 | $82.00 |
| 407E10000 TACK COAT | 30 GAL | $20.00 | $20.00 | $5.04 | $1.00 | $15.00 | $15.30 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 19 SY | $150 | $135 | $101 | $164 | $240 | $102 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 76 FT | $20.00 | $25.00 | $29.82 | $13.00 | $32.00 | $35.00 |
| 202E58000 MANHOLE REMOVED | 2 EACH | $800 | $500 | $1,026 | $520 | $700 | $745 |
| 611E00900 6" CONDUIT, TYPE B | 75 FT | $50.00 | $110 | $132 | $320 | $150 | $84.00 |
| 611E01801 8" CONDUIT, TYPE B, AS PER PLAN | 10 FT | $55.00 | $110 | $194 | $243 | $160 | $249 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $2,000 | $5,000 | $13,673 | $12,000 | $8,000 | $53,247 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 84 SY | $40.00 | $40.00 | $45.39 | $43.50 | $43.50 | $23.00 |
| 512E33000 TYPE 2 WATERPROOFING | 249 SY | $20.00 | $25.00 | $28.24 | $24.00 | $24.00 | $21.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 101 SF | $3.50 | $12.00 | $4.96 | $9.00 | $15.00 | $8.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 18 CY | $75.00 | $110 | $208 | $125 | $160 | $131 |
| 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 33 CY | $125 | $125 | $175 | $133 | $130 | $137 |
| 602E98000 MASONRY, MISC.:SALVAGED MASONRY STONE | 1 LS | $3,000 | $4,000 | $36,415 | $47,000 | $12,000 | $18,657 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $5,500 | $0.01 | $4,500 | $6,000 | $12,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,000 | $2,500 | $2,560 | $4,100 | $15,000 | $5,000 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,000 | $5,000 | $4,968 | $5,000 | $5,000 | $10,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $7,500 | $6,254 | $5,000 | $5,000 | $8,000 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 8 EACH | $400 | $750 | $1.31 | $215 | $600 | $670 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96493 20' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN | 54 FT | $2,500 | $135k | 28% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $35,000 | $35k | 7% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 62 CY | $500 | $31k | 6% |
| 517E76300 RAILING, MISC.: PEDESTRIAN TUBULAR STEEL, AS PER P | 85 FT | $350 | $30k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $23,832 | $24k | 5% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 19 CY | $850 | $16k | 3% |
| 503E21100 UNCLASSIFIED EXCAVATION | 530 CY | $25 | $13k | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 27 CY | $425 | $11k | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $10k | 2% |
| 690E98400 SPECIAL - BYPASS PUMPING | 1 LS | $10,000 | $10k | 2% |