STA-SR 43/VAR-12.70/VAR
STA County · est $2.7M
Bid dateThursday, January 12—
STA County · est $2.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 40 more items below.
| Item | Quantity | R1Chagrin Valley Paving INC | R2Barbicas Construction Company INC | R3Shelly Company | R4Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (2628 CY | $190 | $242 | $185 | $235 | 18% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (V | 75,645 SY | $6.00 | $5.00 | $2.75 | $4.20 | 17% |
| 424E14101 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 449 (1577 CY | $225 | $300 | $275 | $280 | 13% |
| 608E52000 CURB RAMP | 18,262 SF | $13.65 | $14.00 | $13.65 | $11.50 | 9% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 100 EACH | $2,000 | $2,300 | $1,800 | $1,450 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $200,000 | $90,000 | $463,500 | $280,000 |
| Item | Quantity | R1Chagrin Valley Paving INC | R2Barbicas Construction Company INC | R3Shelly Company | R4Karvo Companies INC |
|---|---|---|---|---|---|
| 202E32000 CURB REMOVED | 1,098 FT | $9.00 | $9.00 | $9.00 | $30.00 |
| 203E10000 EXCAVATION | 25 CY | $100 | $40.00 | $30.00 | $25.00 |
| 625E31600 PULL BOX, MISC.: ADJUSTED TO GRADE | 6 EACH | $550 | $250 | $1,400 | $400 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | $227,073 | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,250 SY | $75.00 | $30.00 | $60.00 | $60.00 | 3% |
| 202E30000 WALK REMOVED | 27,436 SF | $3.40 | $3.50 | $3.40 | $5.00 | 3% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 72 EACH | $1,250 | $1,500 | $1,300 | $1,500 | 3% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 52 EACH | $1,500 | $1,200 | $1,300 | $1,000 | 3% |
| 608E10000 4" CONCRETE WALK | 9,174 SF | $5.65 | $5.75 | $5.65 | $8.00 | 2% |
| 609E26000 CURB, TYPE 6 | 1,095 FT | $35.00 | $35.00 | $35.00 | $20.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 300 HOUR | $125 | $70.00 | $75.00 | $85.00 | 1% |
| 646E60100 GREEN COLORED PAVEMENT FOR BIKE LANES | 1,674 SF | $22.00 | $22.00 | $13.00 | $22.00 | 1% |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 21 EACH | $1,500 | $1,300 | $1,500 | $1,300 | 1% |
| 253E01000 PAVEMENT REPAIR | 150 SY | $200 | $140 | $300 | $250 | 1% |
| 646E10510 CROSSWALK LINE, 12" | 3,702 FT | $6.00 | $6.00 | $7.00 | $6.00 | 1% |
| 646E20300 LANE ARROW | 128 EACH | $170 | $170 | $150 | $170 | 1% |
| 646E10520 CROSSWALK LINE, 24" | 1,830 FT | $11.00 | $11.00 | $12.00 | $11.00 | 1% |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 7 EACH | $1,500 | $1,850 | $1,700 | $1,700 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 3 EACH | $1,400 | $750 | $1,800 | $550 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 3,950 LB | $3.00 | $2.50 | $2.50 | $3.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 900 FT | $5.00 | $4.50 | $5.00 | $5.00 |
| 304E20000 AGGREGATE BASE | 25 CY | $125 | $75.00 | $60.00 | $40.00 |
| 407E13900 TACK COAT, 702.13 | 6,765 GAL | $2.00 | $4.50 | $5.50 | $3.00 |
| 407E20000 NON-TRACKING TACK COAT | 4,585 GAL | $2.00 | $4.50 | $2.75 | $3.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 15 EACH | $1,000 | $300 | $700 | $70.00 |
| 646E10010 EDGE LINE, 6" | 0.91 MILE | $3,990 | $3,990 | $3,200 | $3,990 |
| 646E10110 LANE LINE, 6" | 3.1 MILE | $2,635 | $2,635 | $2,250 | $2,635 |
| 646E10200 CENTER LINE | 3.2 MILE | $4,850 | $4,850 | $3,790 | $4,850 |
| 646E10300 CHANNELIZING LINE, 8" | 1,904 FT | $1.70 | $1.70 | $2.30 | $1.70 |
| 646E10400 STOP LINE | 939 FT | $12.00 | $12.00 | $12.00 | $12.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 1,736 FT | $9.00 | $9.00 | $9.00 | $9.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 4 EACH | $650 | $650 | $650 | $650 |
| 646E20100 SCHOOL SYMBOL MARKING, 72" | 4 EACH | $600 | $600 | $675 | $600 |
| 646E20200 PARKING LOT STALL MARKING | 1,070 FT | $4.70 | $4.70 | $3.00 | $4.70 |
| 646E20504 DOTTED LINE, 6" | 1,863 FT | $4.00 | $4.00 | $2.75 | $4.00 |
| 646E20600 BIKE LANE SYMBOL MARKING | 58 EACH | $150 | $150 | $175 | $150 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 8 EACH | $1,400 | $1,400 | $1,400 | $1,400 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $500 | $200 | $120 | $400 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 7 SNMT | $900 | $900 | $900 | $900 |
| 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT | 6.2 MILE | $650 | $650 | $720 | $650 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 3.1 MILE | $600 | $650 | $700 | $600 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 6.4 MILE | $1,500 | $1,500 | $1,290 | $1,500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 3.2 MILE | $1,200 | $1,500 | $1,275 | $1,200 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 1.82 MILE | $750 | $600 | $900 | $750 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.91 MILE | $650 | $600 | $880 | $650 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 3,808 FT | $0.65 | $0.75 | $0.60 | $0.65 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 1,904 FT | $0.62 | $0.75 | $0.60 | $0.62 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 1,878 FT | $3.10 | $3.25 | $3.25 | $3.10 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 939 FT | $3.20 | $3.25 | $3.25 | $3.20 |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $10,000 | $8,000 | $3,000 | $7,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $25,000 | $15,000 | $18,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $1,200 | $2,300 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $8,000 | $300 | $10,000 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (2628 CY | $190 | $499k | 17% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN (V | 75,645 SY | $6 | $454k | 15% |
| 424E14101 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B | 449 (1577 CY | $225 | $355k | 12% |
| 608E52000 CURB RAMP | 18,262 SF | $13.65 | $249k | 8% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 100 EACH | $2,000 | $200k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $200,000 | $200k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,250 SY | $75 | $94k | 3% |
| 202E30000 WALK REMOVED | 27,436 SF | $3.4 | $93k | 3% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 72 EACH | $1,250 | $90k | 3% |