HOC-SR 664-16.51
HOC County · est $0.5M
Bid dateThursday, March 9—
HOC County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Parker Corporation | R2Axis Civil Construction LLC | R3R C Construction Company And Son | R4INC Double Z Construction Company | R5Alan Stone CO INC | R6Shelly & Sands INC | R7D G M INC | R8Eclipse CO LLC | R9Ohio-west Virginia Excavating CO | R10Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 611E95201 10' X 6' CONDUIT, TYPE A, 706.05, AS PER PLAN | 70 FT | $1,282 | $1,860 | $1,300 | $1,400 | $1,059 | $1,573 | $2,050 | $1,443 | $1,815 | $1,787 | 22% |
| Item | Quantity | R1Parker Corporation | R2Axis Civil Construction LLC | R3R C Construction Company And Son | R4INC Double Z Construction Company | R5Alan Stone CO INC | R6Shelly & Sands INC | R7D G M INC | R8Eclipse CO LLC | R9Ohio-west Virginia Excavating CO | R10Sunesis Construction CO |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" AND UNDER | 14 FT | $10.00 | $30.00 | $50.00 | $38.00 | $30.00 | $20.00 | $50.00 | $16.00 | $184 | $13.79 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) |
| 244 CY |
| $155 |
| $144 |
| $160 |
| $150 |
| $133 |
| $183 |
| $170 |
| $142 |
| $249 |
| $234 |
| 9% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 84 CY | $431 | $320 | $285 | $385 | $364 | $600 | $400 | $385 | $544 | $385 | 9% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 59 CY | $539 | $410 | $425 | $410 | $378 | $500 | $430 | $410 | $579 | $410 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $23,000 | $20,000 | $25,000 | $34,500 | $70,000 | $11,946 | $37,500 | $25,000 | $37,000 | $14,460 | 6% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 40 CY | $550 | $490 | $600 | $725 | $594 | $693 | $600 | $839 | $446 | $707 | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $8,500 | $10,000 | $8,000 | $8,500 | $7,185 | $4,500 | $7,500 | $2,100 | $4,100 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $10,000 | $20,000 | $19,000 | $20,000 | $20,000 | $46,186 | $41,000 | $72,112 | 5% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $19,000 | $15,000 | $10,000 | $7,500 | $18,000 | $12,000 | $10,000 | $14,000 | $16,200 | $8,616 | 5% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $19,000 | $15,000 | $10,000 | $45,000 | $34,000 | $28,922 | $25,000 | $80,000 | $44,700 | $102,412 | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $17,970 | $4,500 | $15,000 | $3,600 | $5,000 | $2,889 | $16,000 | $11,500 | $9,000 | $4,830 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $15,000 | $500 | $10,000 | $1,000 | $2,100 | $1,300 | $11,000 | $9,000 | $1,800 | $1,193 | 4% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $14,000 | $13,500 | $6,500 | $13,000 | $22,500 | $4,499 | $3,000 | $18,000 | $16,750 | $50,756 | 3% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 175 SY | $75.00 | $98.00 | $145 | $110 | $98.89 | $160 | $160 | $116 | $156 | $132 | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 11 CY | $650 | $1,200 | $750 | $1,350 | $1,427 | $3,480 | $1,500 | $2,816 | $2,000 | $2,027 | 2% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 4,817 LB | $1.25 | $2.80 | $3.00 | $2.50 | $2.34 | $2.78 | $3.00 | $6.00 | $4.00 | $3.00 | 1% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,500 | $2,210 | $2,000 | $2,350 | $2,450 | $2,200 | $2,200 | $2,350 | $2,800 | $2,850 | 1% |
| 304E20000 AGGREGATE BASE | 92 CY | $65.00 | $120 | $85.00 | $154 | $104 | $104 | $110 | $98.00 | $133 | $123 | 1% |
| 203E10000 EXCAVATION | 268 CY | $20.00 | $25.00 | $25.00 | $36.00 | $33.98 | $27.00 | $25.00 | $30.00 | $50.00 | $48.29 | 1% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $5,000 | $5,500 | $10,000 | $15,000 | $15,000 | $5,100 | $2,000 | $3,806 | $15,000 | $5,757 | 1% |
| 24 FT |
| $20.00 |
| $30.00 |
| $100 |
| $5.00 |
| $17.00 |
| $40.00 |
| $75.00 |
| $46.00 |
| $123 |
| $29.81 |
| 202E38000 GUARDRAIL REMOVED | 54 FT | $5.00 | $15.00 | $5.00 | $4.50 | $18.00 | $35.00 | $2.00 | $5.00 | $37.00 | $4.80 |
| 202E98000 REMOVAL MISC.: STONE RETAINING WALL | 1 LS | $250 | $1,200 | $4,500 | $1,000 | $2,000 | $1,350 | $1,000 | $2,744 | $2,500 | $459 |
| 203E20000 EMBANKMENT | 194 CY | $20.00 | $25.00 | $25.00 | $15.00 | $32.20 | $20.00 | $25.00 | $35.00 | $119 | $22.02 |
| 204E10000 SUBGRADE COMPACTION | 469 SY | $0.50 | $3.00 | $2.00 | $7.00 | $4.62 | $2.10 | $12.00 | $1.00 | $4.00 | $4.84 |
| 690E50300 SPECIAL - MAILBOX SUPPORT SYSTEM, MULTIPLE | 3 EACH | $100 | $350 | $300 | $400 | $659 | $210 | $500 | $270 | $400 | $121 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 71 CY | $65.00 | $125 | $120 | $120 | $134 | $120 | $120 | $109 | $130 | $228 |
| 659E10000 SEEDING AND MULCHING | 1,611 SY | $1.00 | $2.10 | $5.00 | $3.90 | $4.27 | $2.20 | $4.00 | $2.00 | $3.00 | $4.28 |
| 659E20000 COMMERCIAL FERTILIZER | 0.15 TON | $1,667 | $1,400 | $2,000 | $1,400 | $979 | $995 | $1,000 | $1,438 | $2,000 | $950 |
| 659E31000 LIME | 0.34 ACRE | $736 | $100 | $1,000 | $100 | $400 | $154 | $100 | $103 | $150 | $100 |
| 659E35000 WATER | 5 MGAL | $0.05 | $1.00 | $1.00 | $1.00 | $12.97 | $1.00 | $1.00 | $1.00 | $1.00 | $20.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 24 FT | $10.00 | $25.00 | $30.00 | $31.00 | $75.00 | $20.00 | $40.00 | $21.00 | $73.00 | $13.60 |
| 611E06100 15" CONDUIT, TYPE C, 707.45 | 16 FT | $50.00 | $170 | $175 | $75.00 | $107 | $75.00 | $200 | $200 | $194 | $165 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5" AVERAGE | 599 SY | $8.00 | $16.00 | $20.00 | $16.00 | $15.00 | $7.23 | $17.00 | $16.00 | $25.00 | $19.93 |
| 407E20000 NON-TRACKING TACK COAT | 116 GAL | $20.00 | $3.50 | $25.00 | $3.50 | $5.15 | $3.30 | $3.50 | $3.50 | $5.00 | $3.50 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 12 EACH | $20.00 | $7.00 | $50.00 | $15.00 | $24.15 | $20.85 | $7.00 | $7.00 | $9.00 | $1.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $50.00 | $185 | $300 | $90.00 | $91.01 | $80.38 | $150 | $90.00 | $275 | $108 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 3 EACH | $50.00 | $185 | $50.00 | $125 | $128 | $268 | $150 | $128 | $240 | $108 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.24 MILE | $4,025 | $4,025 | $12,500 | $5,500 | $6,519 | $1,382 | $4,100 | $5,500 | $5,700 | $4,025 |
| 642E00300 CENTER LINE, TYPE 1 | 0.12 MILE | $7,400 | $7,400 | $12,500 | $5,500 | $11,359 | $1,800 | $7,500 | $5,500 | $10,500 | $7,400 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $10.00 | $750 | $7,500 | $550 | $10,449 | $15,000 | $2,000 | $24,000 | $9,700 | $22,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 13 EACH | $10.00 | $22.00 | $25.00 | $18.00 | $22.29 | $10.00 | $40.00 | $14.00 | $59.00 | $42.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 13 EACH | $10.00 | $22.00 | $25.00 | $24.00 | $27.20 | $14.00 | $40.00 | $22.00 | $68.00 | $48.00 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.31 MILE | $4,839 | $6,700 | $12,500 | $6,400 | $4,151 | $4,300 | $7,000 | $6,400 | $9,500 | $6,700 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 22 FT | $10.00 | $12.00 | $50.00 | $6.00 | $25.00 | $38.00 | $12.00 | $6.00 | $17.00 | $12.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 240 FT | $10.00 | $17.00 | $25.00 | $25.00 | $21.00 | $38.00 | $40.00 | $49.00 | $63.00 | $113 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $650 | $1,200 | $750 | $1,050 | $2,218 | $1,695 | $1,800 | $2,704 | $9,600 | $1,792 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 50 SY | $12.00 | $18.00 | $50.00 | $21.50 | $15.24 | $21.97 | $50.00 | $23.00 | $35.00 | $50.00 |
| 512E33000 TYPE 2 WATERPROOFING | 230 SY | $14.00 | $14.00 | $30.00 | $25.00 | $33.35 | $26.26 | $20.00 | $22.00 | $35.00 | $25.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 36 SF | $5.00 | $6.00 | $30.00 | $5.00 | $11.36 | $10.34 | $15.00 | $9.00 | $3.00 | $5.40 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 13 CY | $93.00 | $180 | $85.00 | $111 | $136 | $405 | $120 | $141 | $263 | $171 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E95201 10' X 6' CONDUIT, TYPE A, 706.05, AS PER PLAN | 70 FT | $1,282 | $90k | 20% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 244 CY | $155 | $38k | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 84 CY | $431 | $36k | 8% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 59 CY | $539 | $32k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $23,000 | $23k | 5% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 40 CY | $550 | $22k | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $20k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 4% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $19,000 | $19k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $19,000 | $19k | 4% |