SUM-CR 662-00.00 (4th St)
SUM County · est $0.6M
Bid dateThursday, April 27—
SUM County · est $0.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Chagrin Valley Paving INC | R3Barbicas Construction Company INC | R4Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|
| 424E13101 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE A | 449 (335 CY | $285 | $250 | $325 | $300 | 15% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (497 CY | $185 | $190 | $310 | $205 | 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $59,990 | $72,000 | $50,000 | $40,054 | 10% |
| 608E52000 CURB RAMP | 3,897 SF | $15.00 | $20.00 | $20.00 | $28.00 | 9% |
| 253E01000 PAVEMENT REPAIR | 500 SY | $90.00 | $90.00 | $82.00 | $136 | 7% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN(T= | 9,939 SY | $3.75 | $4.00 | $6.00 | $5.00 |
| Item | Quantity | R1Karvo Companies INC | R2Chagrin Valley Paving INC | R3Barbicas Construction Company INC | R4Shelly & Sands INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $250 | $100 | $1,000 | $4,500 |
| 203E10000 EXCAVATION(FOR PAVEMENT REPAIR) | 85 CY | $25.00 | $25.00 | $20.00 | $46.00 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $2,000 | $1,500 | $1,200 | $2,000 |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 14 CY | $30.00 | $200 | $200 | $385 |
| 659E00500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 202E30000 WALK REMOVED | 5,669 SF | $6.00 | $3.00 | $3.50 | $2.70 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $32,275 | $35,000 | $75,000 | $20,000 | 5% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 22 EACH | $1,250 | $1,500 | $300 | $1,250 | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 500 SY | $40.00 | $42.00 | $26.00 | $80.00 | 3% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 13 EACH | $1,500 | $2,000 | $1,200 | $1,500 | 3% |
| 202E32000 CURB REMOVED | 643 FT | $25.00 | $10.00 | $10.00 | $11.50 | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 33 CY | $425 | $400 | $550 | $775 | 2% |
| 608E10000 4" CONCRETE WALK | 1,390 SF | $10.00 | $10.00 | $12.00 | $13.00 | 2% |
| 832E30000 EROSION CONTROL | 13,250 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 5 EACH | $2,500 | $2,500 | $1,800 | $2,500 | 2% |
| 609E26000 CURB, TYPE 6 | 251 FT | $35.00 | $50.00 | $40.00 | $58.50 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $7,500 | $15,000 | $2,000 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $2,000 | $1,250 | $600 | $3,000 | 1% |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $5,000 | $5,000 | $7,500 | $2,000 | 1% |
| 101 SY |
| $2.00 |
| $15.00 |
| $10.00 |
| $34.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 20 FT | $15.00 | $50.00 | $20.00 | $200 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $950 | $3,000 | $1,200 | $2,500 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 1 EACH | $1,750 | $3,500 | $1,800 | $3,000 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,200 LB | $3.00 | $4.00 | $2.00 | $3.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 380 FT | $5.00 | $5.00 | $5.00 | $3.50 |
| 304E20001 AGGREGATE BASE, AS PER PLAN(FOR PAVEMENT REPAIR) | 85 CY | $25.00 | $75.00 | $40.00 | $30.00 |
| 407E20000 NON-TRACKING TACK COAT | 1,408 GAL | $2.75 | $2.00 | $3.50 | $3.05 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 558 LB | $1.00 | $5.00 | $2.00 | $1.00 |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 2 EACH | $1,300 | $1,300 | $1,800 | $1,300 |
| 644E00100 EDGE LINE, 4" | 0.02 MILE | $10,000 | $10,000 | $10,000 | $10,000 |
| 644E00300 CENTER LINE | 0.44 MILE | $5,750 | $5,750 | $5,750 | $5,750 |
| 644E00400 CHANNELIZING LINE, 8" | 60 FT | $3.00 | $3.00 | $3.00 | $3.00 |
| 644E00500 STOP LINE | 60 FT | $6.00 | $6.00 | $6.00 | $6.00 |
| 644E00620 CROSSWALK LINE, 12" | 264 FT | $4.00 | $4.00 | $4.00 | $4.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 39 FT | $6.00 | $6.00 | $6.00 | $6.00 |
| 644E01000 RAILROAD SYMBOL MARKING | 2 EACH | $500 | $500 | $500 | $500 |
| 644E01110 SCHOOL SYMBOL MARKING, 96" | 1 EACH | $500 | $500 | $500 | $500 |
| 644E01300 LANE ARROW | 2 EACH | $90.00 | $90.00 | $90.00 | $90.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 32 HOUR | $75.00 | $100 | $75.00 | $80.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $225 | $300 | $150 | $375 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $900 | $900 | $900 | $1,400 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.88 MILE | $1,250 | $1,250 | $1,250 | $1,250 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.44 MILE | $1,600 | $1,600 | $1,600 | $1,600 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 120 FT | $2.00 | $2.00 | $2.00 | $2.00 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 60 FT | $2.00 | $2.00 | $2.00 | $2.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 120 FT | $3.50 | $3.50 | $3.50 | $3.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 60 FT | $3.50 | $3.50 | $3.50 | $3.50 |
| 614E31742 WORK ZONE SCHOOL SYMBOL MARKING, 96", CLASS I | 2 EACH | $350 | $350 | $350 | $350 |
| 614E31750 WORK ZONE SCHOOL SYMBOL MARKING, 96", CLASS III, 6 | 1 EACH | $350 | $350 | $350 | $350 |
| 614E32000 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I | 4 EACH | $350 | $350 | $350 | $350 |
| 614E32210 WORK ZONE RAILROAD SYMBOL MARKING, CLASS III, 642 | 2 EACH | $350 | $350 | $350 | $350 |
| 616E10000 WATER | 10 MGAL | $0.25 | $5.00 | $11.43 | $20.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,275 | $100 | $200 | $1,000 |
| 690E98400 SPECIAL - PRE-CONSTRUCTION VIDEO | 1 LS | $785 | $785 | $785 | $1,200 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 424E13101 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE A | 449 (335 CY | $285 | $95k | 14% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (497 CY | $185 | $92k | 14% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $59,990 | $60k | 9% |
| 608E52000 CURB RAMP | 3,897 SF | $15 | $58k | 9% |
| 253E01000 PAVEMENT REPAIR | 500 SY | $90 | $45k | 7% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN(T= | 9,939 SY | $3.75 | $37k | 6% |
| 202E30000 WALK REMOVED | 5,669 SF | $6 | $34k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $32,275 | $32k | 5% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 22 EACH | $1,250 | $28k | 4% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 500 SY | $40 | $20k | 3% |