CUY-SR 82-09.12
CUY County · est $0.9M
Bid dateThursday, May 11—
CUY County · est $0.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 55 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Karvo Companies INC | R3Specialized Construction INC | R4Shelly Company | % of bid |
|---|---|---|---|---|---|---|
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 2,189 SY | $70.00 | $75.00 | $75.00 | $95.00 | 20% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (607 CY | $175 | $200 | $210 | $250 | 14% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 434 CY | $220 | $265 | $260 | $300 | 12% |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $485 | $375 | $500 | $700 | 7% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $50,895 | $84,029 | $44,000 | $270,000 | 7% |
| 304E20000 AGGREGATE BASE | 541 CY | $85.00 | $95.00 | $100 | $100 |
| Item | Quantity | R1Ronyak Paving INC | R2Karvo Companies INC | R3Specialized Construction INC | R4Shelly Company |
|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $500 | $250 | $3,000 | $5,000 |
| 202E30000 WALK REMOVED | 376 SF | $3.00 | $5.00 | $5.00 | $12.00 |
| 202E32000 CURB REMOVED | 35 FT | $12.00 | $30.00 | $30.00 | $35.00 |
| 202E38000 GUARDRAIL REMOVED | 211 FT | $1.60 | $5.00 | $2.00 | $1.60 |
| 202E42206 ANCHOR ASSEMBLY REMOVED | 4 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | — | $3.00 | $4.80 | $5.00 | $3.75 | 5% |
| 202E23000 PAVEMENT REMOVED | 1,318 SY | $28.00 | $20.00 | $25.00 | $25.00 | 5% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 21 EACH | $1,500 | $1,250 | $1,950 | $2,000 | 4% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 621 SY | $50.00 | $55.00 | $45.00 | $90.00 | 4% |
| 203E10000 EXCAVATION | 506 CY | $60.00 | $35.00 | $150 | $25.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $30,213 | $83,000 | $39,000 | $40,000 | 4% |
| 441E70801 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 449 (23 CY | $525 | $525 | $500 | $600 | 2% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 115 CY | $95.00 | $125 | $140 | $175 | 1% |
| 832E30000 EROSION CONTROL | 10,573 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,490 | $12,000 | $9,000 | $5,000 | 1% |
| 609E26000 CURB, TYPE 6 | 183 FT | $45.00 | $50.00 | $78.00 | $65.00 | 1% |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 139 CY | $55.00 | $55.00 | $50.00 | $55.00 | 1% |
| 608E52000 CURB RAMP | 188 SF | $35.00 | $15.00 | $60.00 | $50.00 | 1% |
| 407E20000 NON-TRACKING TACK COAT | 1,629 GAL | $4.00 | $2.75 | $3.00 | $2.50 | 1% |
| $65.00 |
| $250 |
| $65.00 |
| $65.00 |
| 204E10000 SUBGRADE COMPACTION | 4,829 SY | $1.00 | $0.35 | $1.00 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 73 CY | $50.00 | $25.00 | $150 | $25.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 73 CY | $50.00 | $75.00 | $100 | $60.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $250 | $125 | $100 | $200 |
| 204E50000 GEOTEXTILE FABRIC | 219 SY | $5.00 | $1.00 | $5.00 | $3.26 |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 3 STA | $145 | $950 | $150 | $145 |
| 209E60201 LINEAR GRADING, AS PER PLAN | 67 STA | $90.00 | $100 | $150 | $120 |
| 606E15050 GUARDRAIL, TYPE MGS | 150 FT | $30.20 | $32.00 | $35.00 | $30.20 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 2 EACH | $3,120 | $2,650 | $3,120 | $3,120 |
| 608E10000 4" CONCRETE WALK | 187 SF | $20.00 | $10.00 | $30.00 | $40.00 |
| 623E39501 MONUMENT BOX ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $1,100 | $1,200 | $1,750 | $1,200 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 3 EACH | $275 | $235 | $215 | $215 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 3 EACH | $175 | $180 | $175 | $160 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $200 | $200 | $150 | $200 |
| 659E10000 SEEDING AND MULCHING | 1,133 SY | $1.25 | $1.25 | $5.00 | $1.25 |
| 659E14000 REPAIR SEEDING AND MULCHING | 57 SY | $3.00 | $3.00 | $1.00 | $3.00 |
| 659E15000 INTER-SEEDING | 57 SY | $1.00 | $0.01 | $1.00 | $0.10 |
| 659E20000 COMMERCIAL FERTILIZER | 0.26 TON | $1,200 | $1,200 | $250 | $1,200 |
| 659E31000 LIME | 0.23 ACRE | $10.00 | $1.00 | $30.00 | $0.09 |
| 659E35000 WATER | 7 MGAL | $10.00 | $0.01 | $1.00 | $0.10 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 100 FT | $18.00 | $10.00 | $15.00 | $10.00 |
| 611E01500 6" CONDUIT, TYPE F | 100 FT | $14.00 | $10.00 | $15.00 | $10.00 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $2.00 | $3.00 | $3.50 | $3.00 |
| 254E01600 PATCHING PLANED SURFACE | 200 SY | $1.00 | $1.00 | $5.00 | $1.00 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 7 CY | $350 | $550 | $500 | $500 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 52 SY | $100 | $100 | $275 | $300 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $750 | $800 | $1,400 | $900 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED, (TYPE C), WHITE | 3 EACH | $85.00 | $95.00 | $85.00 | $85.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BI-DIRECTIONAL) | 6 EACH | $10.40 | $10.00 | $15.00 | $10.40 |
| 644E00100 EDGE LINE, 4" | 1.34 MILE | $4,000 | $4,000 | $4,000 | $4,000 |
| 644E00300 CENTER LINE | 0.67 MILE | $8,000 | $8,000 | $8,000 | $8,000 |
| 644E00400 CHANNELIZING LINE, 8" | 142 FT | $5.00 | $5.00 | $5.00 | $5.00 |
| 644E00500 STOP LINE | 18 FT | $20.00 | $20.00 | $20.00 | $20.00 |
| 644E00620 CROSSWALK LINE, 12" | 126 FT | $10.00 | $10.00 | $10.00 | $10.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 90 FT | $7.50 | $7.50 | $7.50 | $7.50 |
| 644E01300 LANE ARROW | 3 EACH | $200 | $200 | $200 | $200 |
| 644E01400 WORD ON PAVEMENT, 72" | 1 EACH | $350 | $350 | $350 | $350 |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $95.00 | $75.00 | $100 | $100 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $900 | $900 | $900 | $900 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.74 MILE | $1,500 | $1,500 | $1,500 | $1,500 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 1.48 MILE | $700 | $700 | $700 | $700 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 690 FT | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E25200 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS I, 642 P | 288 FT | $4.00 | $4.00 | $4.00 | $4.00 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 54 FT | $4.00 | $4.00 | $4.00 | $4.00 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 390 FT | $3.00 | $3.00 | $3.00 | $3.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 3 EACH | $75.00 | $75.00 | $75.00 | $75.00 |
| 616E10000 WATER | 10 MGAL | $5.00 | $1.00 | $1.00 | $20.00 |
| 616E20000 CALCIUM CHLORIDE | 1 TON | $5.00 | $5.00 | $100 | $100 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,250 | $5,000 | $3,000 | $5,000 |
| 690E98400 SPECIAL - PRE-CONSTRUCTION PHOTOGRAPHY, AS PER PLA | 1 LS | $1,000 | $800 | $1,000 | $1,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 253E01001 PAVEMENT REPAIR, AS PER PLAN | 2,189 SY | $70 | $153k | 18% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (607 CY | $175 | $106k | 12% |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 434 CY | $220 | $95k | 11% |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $485 | $51k | 6% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $50,895 | $51k | 6% |
| 304E20000 AGGREGATE BASE | 541 CY | $85 | $46k | 5% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | — | $3 | $37k | 4% |
| 202E23000 PAVEMENT REMOVED | 1,318 SY | $28 | $37k | 4% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 21 EACH | $1,500 | $32k | 4% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 621 SY | $50 | $31k | 4% |