HAM-IR 71-08.65
HAM County · est $4.1M
Bid dateThursday, August 24—
HAM County · est $4.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 220 more items below.
| Item | Quantity | R1Kt Holden Construction LLC | R2Sunesis Construction CO | R3Prus Construction Company | R4Eagle Bridge CO | R5John R Jurgensen Company | R6Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 452E16060 13.5" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1 | 4,912 SY | $138 | $147 | $180 | $144 | $175 | $130 | 23% |
| 203E10000 EXCAVATION | 20,257 CY | $30.00 | $29.40 | $24.00 | $27.00 | $27.91 | $27.00 | 21% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 139 CY | $1,520 | $1,654 | $995 |
| Item | Quantity | R1Kt Holden Construction LLC | R2Sunesis Construction CO | R3Prus Construction Company | R4Eagle Bridge CO | R5John R Jurgensen Company | R6Complete General Construction Company |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $15,400 | $26,000 | $20,000 | $21,824 | $50,000 |
| 202E20010 HEADWALL REMOVED | 3 EACH | $260 | $361 | $815 | $800 | $402 | $540 |
| 202E23000 PAVEMENT REMOVED | 1,638 SY | $22.00 | $35.77 | $23.50 | $30.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,250 |
| $1,631 |
| $1,710 |
| 7% |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN | 5,014 SF | $40.00 | $54.89 | $48.50 | $55.00 | $71.86 | $73.00 | 7% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,700 | $2,700 | $2,700 | $2,700 | $2,700 | $2,700 | 5% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $130,000 | $79,460 | $20,000 | $135,000 | $27,873 | $13,000 | 4% |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 943 FT | $118 | $123 | $215 | $125 | $121 | $175 | 4% |
| 203E98000 ROADWAY, MISC.:FLOOD CONTROL EMBANKMENT | 2,155 CY | $48.00 | $26.24 | $40.00 | $40.00 | $95.18 | $90.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $168,727 | $85,000 | $200,000 | $200,000 | $200,000 | 3% |
| 304E20000 AGGREGATE BASE | 905 CY | $90.00 | $97.53 | $112 | $82.00 | $86.71 | $80.00 | 3% |
| 807E13010 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN | 25.42 MILE | $3,025 | $3,025 | $3,025 | $3,025 | $3,025 | $3,025 | 3% |
| 804E15030 FIBER OPTIC CABLE, 72 FIBER | 16,177 FT | $3.70 | $3.00 | $3.90 | $3.90 | $3.90 | $5.00 | 2% |
| 659E00300 TOPSOIL | 1,478 CY | $40.00 | $48.60 | $58.00 | $20.00 | $3.00 | $30.00 | 2% |
| 203E20000 EMBANKMENT | 6,143 CY | $9.00 | $14.04 | $16.00 | $12.00 | $17.81 | $8.00 | 2% |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 91 CY | $600 | $747 | $800 | $650 | $1,438 | $695 | 2% |
| 621E00100 RPM | 1,526 EACH | $34.70 | $34.70 | $34.70 | $34.70 | $34.70 | $34.70 | 2% |
| 611E97400 CONDUIT, MISC.:12' X 9' CONDUIT, TYPE A, 706.05, D | 35 FT | $1,500 | $1,323 | $1,290 | $1,500 | $1,379 | $3,175 | 2% |
| 645E00117 EDGE LINE, 6", TYPE A3, AS PER PLAN | 1.64 MILE | $31,400 | $31,400 | $31,400 | $31,400 | $31,400 | $31,400 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $51,000 | $24,488 | $45,000 | $65,000 | $36,478 | $30,000 | 2% |
| 630E97700 SIGNING, MISC.: WRONG WAY DETECTION SYSTEM | 1 EACH | $48,000 | $52,970 | $52,970 | $60,000 | $52,970 | $59,000 | 2% |
| $27.75 |
| $30.00 |
| 202E30700 CONCRETE BARRIER REMOVED | 75 FT | $15.00 | $38.05 | $47.50 | $35.00 | $54.91 | $26.00 |
| 202E32000 CURB REMOVED | 1,348 FT | $5.00 | $6.85 | $14.00 | $4.00 | $8.45 | $9.00 |
| 202E32700 GUTTER REMOVED | 134 SY | $12.00 | $28.50 | $15.00 | $20.00 | $16.34 | $44.00 |
| 202E35101 PIPE REMOVED, 24" AND UNDER, AS PER PLAN | 477 FT | $41.00 | $28.66 | $38.00 | $20.00 | $84.89 | $40.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 152 FT | $42.00 | $23.40 | $36.50 | $30.00 | $106 | $75.00 |
| 202E38000 GUARDRAIL REMOVED | 675 FT | $5.50 | $5.00 | $5.00 | $5.00 | $5.00 | $2.00 |
| 202E58100 CATCH BASIN REMOVED | 6 EACH | $410 | $525 | $725 | $250 | $491 | $575 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT. 12" | 50 FT | $20.00 | $21.72 | $25.00 | $45.00 | $40.98 | $31.00 |
| 202E98000 REMOVAL MISC.: LIGHT TOWER RETAINING WALL | 1 LS | $3,500 | $1,361 | $3,000 | $3,000 | $3,761 | $2,000 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 438 CY | $100 | $108 | $86.00 | $80.00 | $89.72 | $95.00 |
| 204E45000 PROOF ROLLING | 3 HOUR | $110 | $246 | $145 | $400 | $233 | $340 |
| 206E10500 CEMENT | 207 TON | $195 | $258 | $205 | $195 | $198 | $195 |
| 206E11001 CURING COAT, AS PER PLAN | 5,226 SY | $1.25 | $1.52 | $1.25 | $1.25 | $1.46 | $1.25 |
| 206E15030 CEMENT STABILIZED SUBGRADE, 16 INCHES DEEP | 5,425 SY | $5.88 | $9.66 | $7.25 | $11.00 | $10.34 | $7.70 |
| 606E15050 GUARDRAIL, TYPE MGS | 831.25 FT | $19.60 | $21.50 | $21.50 | $21.50 | $21.50 | $19.60 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(NCHRP 350 OR MASH 2016 | 3 EACH | $2,730 | $2,650 | $2,650 | $2,650 | $2,650 | $2,730 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 1 EACH | $920 | $1,270 | $1,270 | $1,270 | $1,270 | $920 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 3 EACH | $2,425 | $2,550 | $2,550 | $2,550 | $2,550 | $2,425 |
| 606E35103 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, AS PER PLAN | 1 EACH | $960 | $700 | $700 | $700 | $700 | $960 |
| 608E12000 5" CONCRETE WALK | 4,655 SF | $8.44 | $10.59 | $9.00 | $10.00 | $8.69 | $7.50 |
| 608E52000 CURB RAMP | 306 SF | $21.00 | $23.88 | $15.50 | $21.00 | $19.67 | $40.00 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 3 EACH | $3,000 | $3,000 | $8,750 | $3,500 | $4,505 | $5,000 |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 4 EACH | $2,750 | $2,750 | $7,250 | $3,500 | $4,255 | $5,500 |
| 623E40500 REFERENCE MONUMENT | 1 EACH | $999 | $810 | $2,500 | $2,000 | $876 | $700 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, 1 WAY | 13 EACH | $15.00 | $10.00 | $15.00 | $10.00 | $29.83 | $10.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1 WAY | 20 EACH | $10.50 | $10.00 | $20.00 | $10.00 | $10.00 | $12.30 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $38,705 | $24,096 | $40,000 | $50,000 | $34,245 | $49,000 |
| 203E98000 ROADWAY, MISC.: UNDERCUT | 562 CY | $55.00 | $51.18 | $85.00 | $35.00 | $126 | $90.00 |
| 202E98000 REMOVAL MISC.: SANDBAGS | 1 LS | $3,500 | $2,601 | $3,000 | $10,000 | $14,285 | $15,000 |
| 601E11000 RIPRAP, TYPE D | 38 SY | $240 | $189 | $215 | $225 | $414 | $275 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 2 CY | $850 | $194 | $500 | $250 | $553 | $400 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $200 | $200 | $175 | $350 | $200 | $100 |
| 659E10000 SEEDING AND MULCHING | 20,373 SY | $0.86 | $1.82 | $1.12 | $1.75 | $0.86 | $1.80 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,020 SY | $0.50 | $0.50 | $1.12 | $2.00 | $0.50 | $0.80 |
| 659E20000 COMMERCIAL FERTILIZER | 3 TON | $1,500 | $1,500 | $925 | $1,750 | $1,500 | $759 |
| 659E31000 LIME | 5 ACRE | $200 | $200 | $75.00 | $10.00 | $200 | $25.00 |
| 659E35000 WATER | 111 MGAL | $1.00 | $1.00 | $1.00 | $20.00 | $1.00 | $1.00 |
| 659E40000 MOWING | 46 MSF | $1.00 | $1.00 | $13.25 | $20.00 | $1.00 | $10.00 |
| 670E00500 SLOPE EROSION PROTECTION | 2,700 SY | $2.35 | $3.80 | $3.80 | $2.50 | $2.35 | $2.45 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 792 SY | $2.35 | $2.35 | $2.90 | $2.50 | $2.35 | $2.55 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $1,795 | $1,800 | $2,250 | $1,795 | $3,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $3,200 | $9,300 | $8,060 | $15,000 | $4,140 | $17,500 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $11,350 | $12,227 | $5,000 | $15,000 | $12,227 | $12,500 |
| 832E30000 EROSION CONTROL | 45,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1.12 CY | $2,500 | $4,168 | $6,000 | $2,500 | $3,460 | $3,500 |
| 605E11101 6" SHALLOW PIPE UNDERDRAINS, AS PER PLAN, 707.31, | 1,253 FT | $16.55 | $14.68 | $21.50 | $16.00 | $26.81 | $17.50 |
| 611E00511 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, AS PER | 64 FT | $60.00 | $48.35 | $36.00 | $16.00 | $62.10 | $35.50 |
| 611E00900 6" CONDUIT, TYPE B FOR DRAINAGE CONNECTION | 100 FT | $7.20 | $40.70 | $27.50 | $17.00 | $63.42 | $36.00 |
| 611E01100 6" CONDUIT, TYPE C FOR DRAINAGE CONNECTION | 100 FT | $6.00 | $40.70 | $27.50 | $12.00 | $63.42 | $36.00 |
| 611E01400 6" CONDUIT, TYPE E FOR DRAINAGE CONNECTION | 100 FT | $6.00 | $26.55 | $27.50 | $12.00 | $63.42 | $14.00 |
| 611E01500 6" CONDUIT, TYPE F FOR DRAINAGE CONNECTION | 100 FT | $4.80 | $26.55 | $27.50 | $12.00 | $63.42 | $14.00 |
| 611E04600 12" CONDUIT, TYPE C | 6 FT | $320 | $320 | $315 | $380 | $433 | $350 |
| 611E05900 15" CONDUIT, TYPE B | 138 FT | $155 | $213 | $175 | $130 | $204 | $170 |
| 611E05901 15" CONDUIT, TYPE B, AS PER PLAN | 100 FT | $65.00 | $117 | $140 | $135 | $135 | $155 |
| 611E06700 15" CONDUIT, TYPE F | 96 FT | $125 | $110 | $135 | $118 | $193 | $135 |
| 611E07401 18" CONDUIT, TYPE B, AS PER PLAN | 13 FT | $144 | $199 | $270 | $290 | $258 | $315 |
| 611E07600 18" CONDUIT, TYPE C | 136 FT | $90.00 | $99.29 | $132 | $135 | $172 | $200 |
| 611E10600 24" CONDUIT, TYPE C | 295 FT | $105 | $146 | $170 | $175 | $183 | $165 |
| 611E10601 24" CONDUIT, TYPE C, AS PER PLAN | 40 FT | $80.00 | $111 | $140 | $165 | $138 | $140 |
| 611E13400 30" CONDUIT, TYPE B | 154 FT | $205 | $200 | $250 | $350 | $209 | $250 |
| 611E13601 30" CONDUIT, TYPE C, AS PER PLAN | 235 FT | $180 | $161 | $170 | $265 | $161 | $150 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $4,000 | $4,616 | $6,000 | $4,900 | $4,093 | $5,365 |
| 611E98151 CATCH BASIN, NO. 3, AS PER PLAN | 1 EACH | $2,000 | $2,960 | $3,200 | $4,000 | $1,019 | $3,420 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $3,500 | $3,474 | $5,250 | $3,800 | $2,731 | $4,500 |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 3 EACH | $2,000 | $2,506 | $3,600 | $3,000 | $1,019 | $3,325 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,100 | $2,290 | $3,000 | $2,200 | $1,949 | $3,325 |
| 611E98511 CATCH BASIN, NO. 2-3, AS PER PLAN | 1 EACH | $800 | $1,843 | $3,000 | $2,000 | $1,019 | $3,425 |
| 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D | 1 EACH | $13,500 | $14,438 | $13,750 | $11,000 | $10,542 | $12,000 |
| 611E99115 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D, AS | 1 EACH | $10,000 | $9,049 | $7,800 | $8,000 | $6,520 | $8,850 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $3,700 | $6,870 | $8,250 | $6,500 | $5,689 | $5,850 |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN | 3 EACH | $5,000 | $5,454 | $5,800 | $4,000 | $3,417 | $3,550 |
| 611E97300 CONDUIT, MISC.: SEWER INSPECTION | 1 LS | $15,000 | $16,530 | $5,500 | $15,000 | $15,000 | $16,530 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" | 717 SY | $29.00 | $30.03 | $6.75 | $20.00 | $29.00 | $29.00 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 9 CY | $530 | $468 | $425 | $756 | $624 | $650 |
| 407E20000 NON-TRACKING TACK COAT | 79 GAL | $10.00 | $10.00 | $8.50 | $14.50 | $10.00 | $10.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1.5 CY | $925 | $185 | $750 | $2,961 | $1,105 | $1,300 |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 30 CY | $995 | $995 | $400 | $888 | $995 | $995 |
| 609E24510 CURB, TYPE 4-C | 66 FT | $35.00 | $45.62 | $95.00 | $40.00 | $41.76 | $73.00 |
| 609E26000 CURB, TYPE 6 | 1,835 FT | $21.00 | $27.34 | $35.00 | $25.00 | $24.85 | $31.00 |
| 609E50000 4" CONCRETE TRAFFIC ISLAND | 537 SY | $67.50 | $67.50 | $54.00 | $85.00 | $75.91 | $68.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 4 EACH | $69.00 | $160 | $160 | $160 | $160 | $150 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 15 EACH | $64.00 | $89.50 | $89.50 | $89.50 | $89.50 | $150 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT12B35 | 1 EACH | $3,625 | $3,975 | $3,975 | $3,975 | $3,975 | $4,000 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 1 EACH | $1,950 | $2,670 | $2,670 | $2,670 | $2,670 | $3,000 |
| 625E23300 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE | 462 FT | $4.00 | $4.60 | $4.60 | $4.60 | $4.60 | $5.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 141 FT | $1.75 | $2.00 | $2.00 | $2.00 | $2.00 | $6.50 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 230 FT | $10.50 | $12.00 | $12.00 | $12.00 | $12.00 | $26.00 |
| 625E24330 1-1/2" DUCT CABLE WITH THREE NO. 2 AWG 2400 VOLT C | 460 FT | $13.15 | $14.95 | $14.95 | $14.95 | $14.95 | $20.00 |
| 625E25400 CONDUIT, 2", 725.04 | 666 FT | $12.95 | $21.75 | $21.75 | $21.75 | $21.75 | $20.00 |
| 625E25506 CONDUIT, 3", 725.052 | 144 FT | $6.80 | $14.95 | $14.95 | $14.95 | $14.95 | $16.00 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, TYPE II, 200 | 1 EACH | $460 | $435 | $435 | $435 | $435 | $500 |
| 625E29000 TRENCH | 652 FT | $11.50 | $13.00 | $13.00 | $13.00 | $13.00 | $5.00 |
| 625E29002 TRENCH, 24" DEEP | 774 FT | $11.50 | $13.00 | $13.00 | $13.00 | $13.00 | $5.00 |
| 625E30500 PULL BOX, 725.06, SIZE 1.5 | 3 EACH | $780 | $515 | $515 | $515 | $515 | $700 |
| 625E30700 PULL BOX, 725.08, 18" | 5 EACH | $940 | $970 | $970 | $970 | $970 | $1,200 |
| 625E31510 PULL BOX REMOVED | 2 EACH | $250 | $232 | $232 | $232 | $232 | $300 |
| 625E32000 GROUND ROD | 7 EACH | $350 | $353 | $353 | $353 | $353 | $325 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 1,426 FT | $1.60 | $2.85 | $2.85 | $2.85 | $2.85 | $1.25 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $7,500 | $15,900 | $15,900 | $15,900 | $15,900 | $4,000 |
| 625E75400 LIGHT POLE REMOVED | 1 EACH | $2,000 | $420 | $420 | $420 | $420 | $500 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 1 EACH | $1,000 | $862 | $862 | $862 | $862 | $500 |
| 625E75506 LUMINAIRE REMOVED | 1 EACH | $250 | $52.50 | $52.50 | $52.50 | $52.50 | $100 |
| 625E75800 DISCONNECT CIRCUIT | 1 EACH | $250 | $862 | $862 | $862 | $862 | $300 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 10 EACH | $9.02 | $42.77 | $25.00 | $21.00 | $37.20 | $36.00 |
| 625E32000 GROUND ROD | 1 EACH | $350 | $353 | $353 | $353 | $353 | $325 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 323.1 FT | $16.00 | $14.00 | $16.00 | $14.00 | $14.00 | $15.00 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 35.6 FT | $28.00 | $32.00 | $28.00 | $32.00 | $32.00 | $50.00 |
| 630E08600 SIGN POST REFLECTOR | 10 EACH | $50.00 | $61.00 | $50.00 | $61.00 | $61.00 | $45.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 2 EACH | $410 | $391 | $410 | $391 | $391 | $485 |
| 630E72320 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 6 | 1 EACH | $25,000 | $25,305 | $25,305 | $25,305 | $25,305 | $31,250 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 2 EACH | $140 | $185 | $140 | $185 | $185 | $295 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 8 EACH | $158 | $160 | $160 | $160 | $160 | $180 |
| 630E80100 SIGN, FLAT SHEET | 192 SF | $32.00 | $19.25 | $32.00 | $19.25 | $19.25 | $17.50 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 30 SF | $38.00 | $30.50 | $38.00 | $30.50 | $30.50 | $25.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 112 SF | $38.00 | $35.50 | $38.00 | $35.50 | $35.50 | $24.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 2 EACH | $1,025 | $1,250 | $1,025 | $1,415 | $1,250 | $975 |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 1 EACH | $4,450 | $7,850 | $7,850 | $8,200 | $7,850 | $7,820 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $25.00 | $20.00 | $30.00 | $20.00 | $20.00 | $15.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $30.00 | $25.00 | $1,000 | $25.00 | $25.00 | $20.00 |
| 630E87000 REMOVAL OF OVERHEAD MOUNTED SIGN AND STORAGE | 2 EACH | $200 | $1,000 | $200 | $1,000 | $1,000 | $385 |
| 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 2 EACH | $1,000 | $2,250 | $2,250 | $2,250 | $2,250 | $1,340 |
| 630E97700 SIGNING, MISC.: LEVEE SIGNAGE | 5 EACH | $195 | $500 | $195 | $500 | $500 | $235 |
| 631E94470 REMOVAL OF SIGN SERVICE | 2 EACH | $250 | $840 | $840 | $840 | $840 | $425 |
| 644E00104 EDGE LINE, 6" | 0.06 MILE | $23,575 | $23,575 | $23,575 | $23,575 | $23,575 | $23,575 |
| 644E00500 STOP LINE | 50 FT | $38.35 | $38.35 | $38.35 | $38.35 | $38.35 | $38.35 |
| 644E00720 CHEVRON MARKING | 88 FT | $22.60 | $22.60 | $22.60 | $22.60 | $22.60 | $22.60 |
| 644E01500 DOTTED LINE, 4" | 99 FT | $15.85 | $15.85 | $15.85 | $15.85 | $15.85 | $15.85 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 1,414 FT | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 | $5.15 |
| 645E00217 LANE LINE, 6", TYPE A3, AS PER PLAN | 0.69 MILE | $11,650 | $11,650 | $11,650 | $11,650 | $11,650 | $11,650 |
| 645E00417 CHANNELIZING LINE, 12", TYPE A3, AS PER PLAN | 1,100 FT | $8.30 | $8.30 | $8.30 | $8.30 | $8.30 | $8.30 |
| 646E10400 STOP LINE | 21 FT | $49.10 | $49.10 | $49.10 | $49.10 | $49.10 | $49.10 |
| 646E10520 CROSSWALK LINE, 24" | 138 FT | $35.20 | $35.20 | $35.20 | $35.20 | $35.20 | $35.20 |
| 646E20320 WRONG WAY ARROW | 2 EACH | $965 | $965 | $965 | $965 | $965 | $965 |
| 646E20504 DOTTED LINE, 6" | 319 FT | $4.40 | $4.40 | $4.40 | $4.40 | $4.40 | $4.40 |
| 646E20800 YIELD LINE | 20 FT | $63.75 | $63.75 | $63.75 | $63.75 | $63.75 | $63.75 |
| 807E13110 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN | 20.18 MILE | $1,800 | $1,800 | $1,800 | $1,800 | $1,800 | $1,800 |
| 807E13310 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN | 14,185 FT | $2.40 | $2.40 | $2.40 | $2.40 | $2.40 | $2.40 |
| 807E13410 WET REFLECTIVE SPRAY THERMOPLASTIC PAVEMENT MARKIN | 13,522 FT | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 850E10030 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $4,600 | $4,600 | $4,600 | $4,600 | $4,600 | $4,600 |
| 850E20010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $5,650 | $5,650 | $5,650 | $5,650 | $5,650 | $5,650 |
| 850E20030 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $8,950 | $8,950 | $8,950 | $8,950 | $8,950 | $8,950 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 10,513 FT | $1.00 | $1.10 | $1.10 | $1.10 | $1.10 | $0.40 |
| 625E29000 TRENCH | 862 FT | $11.50 | $13.00 | $13.00 | $13.00 | $13.00 | $9.00 |
| 625E29941 BARRIER JUNCTION BOX, AS PER PLAN | 2 EACH | $1,965 | $2,160 | $2,160 | $2,160 | $2,160 | $2,500 |
| 625E30711 PULL BOX, 725.08, 32", AS PER PLAN | 5 EACH | $2,365 | $2,490 | $2,490 | $2,490 | $2,490 | $4,500 |
| 625E31510 PULL BOX REMOVED | 4 EACH | $250 | $232 | $232 | $232 | $232 | $275 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 862 FT | $1.60 | $1.50 | $1.50 | $1.50 | $1.50 | $1.00 |
| 625E39520 PULL BOX CLEANED | 25 EACH | $150 | $210 | $210 | $210 | $210 | $900 |
| 630E89812 REMOVAL OF WOOD POLE AND DISPOSAL | 5 EACH | $950 | $630 | $630 | $630 | $630 | $1,000 |
| 804E32060 DROP CABLE, 24 FIBER | 500 FT | $20.35 | $23.85 | $23.85 | $23.85 | $23.85 | $8.25 |
| 804E32070 DROP CABLE, 48 FIBER | 170 FT | $22.60 | $25.80 | $25.80 | $25.80 | $25.80 | $11.50 |
| 804E34022 FIBER TERMINATION PANEL, 24 FIBER | 2 EACH | $2,825 | $3,530 | $3,530 | $3,530 | $3,530 | $2,400 |
| 804E34030 FIBER TERMINATION PANEL, 48 FIBER | 1 EACH | $3,165 | $4,300 | $4,300 | $4,300 | $4,300 | $2,600 |
| 804E37000 SPLICE ENCLOSURE, BUTT STYLE | 6 EACH | $1,360 | $2,230 | $2,230 | $2,230 | $2,230 | $1,800 |
| 809E24500 CONDUIT, 4", MULTICELL, HDPE WITH 4 ? 1? INNERDUCT | 988 FT | $19.25 | $19.20 | $19.20 | $19.20 | $19.20 | $41.00 |
| 625E25500 CONDUIT, 3", 725.04 | 295 FT | $24.70 | $38.50 | $38.50 | $38.50 | $38.50 | $30.00 |
| 625E25600 CONDUIT, 4", 725.04 | 10 FT | $33.60 | $1,699 | $170 | $170 | $170 | $85.00 |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 3" | 198 FT | $78.50 | $56.75 | $56.75 | $56.75 | $56.75 | $45.00 |
| 625E29000 TRENCH | 227 FT | $11.50 | $13.00 | $13.00 | $13.00 | $13.00 | $22.00 |
| 625E30706 PULL BOX, 725.08, 24" | 5 EACH | $1,175 | $1,132 | $1,132 | $1,132 | $1,132 | $1,300 |
| 625E32000 GROUND ROD | 5 EACH | $350 | $353 | $353 | $353 | $353 | $400 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 1 EACH | $425 | $370 | $370 | $370 | $370 | $450 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 1 EACH | $140 | $177 | $177 | $177 | $177 | $275 |
| 630E80100 SIGN, FLAT SHEET | 15.8 SF | $32.00 | $19.25 | $19.25 | $19.25 | $19.25 | $22.50 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 6 EACH | $1,125 | $1,053 | $1,053 | $1,053 | $1,053 | $1,200 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 2 EACH | $580 | $651 | $651 | $651 | $651 | $600 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 6 EACH | $40.00 | $42.75 | $42.75 | $42.75 | $42.75 | $65.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 2 EACH | $250 | $237 | $237 | $237 | $237 | $400 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 976 FT | $2.35 | $3.30 | $3.30 | $3.30 | $3.30 | $4.00 |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 2 EACH | $7,825 | $7,760 | $7,760 | $8,000 | $7,760 | $12,000 |
| 632E64020 PEDESTAL FOUNDATION | 6 EACH | $1,950 | $1,115 | $1,115 | $1,200 | $1,115 | $1,500 |
| 632E66000 POWER CABLE, 3 CONDUCTOR, NO. 14 AWG | 1,503 FT | $4.75 | $2.10 | $2.10 | $2.10 | $2.10 | $5.00 |
| 632E67300 POWER CABLE, 3 CONDUCTOR, NO. 8 AWG | 909 FT | $5.85 | $3.85 | $3.85 | $3.85 | $3.85 | $6.00 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 251 FT | $6.40 | $5.15 | $5.15 | $5.15 | $5.15 | $7.50 |
| 632E69500 SERVICE CABLE, 2 CONDUCTOR, NO. 6 AWG | 50 FT | $4.30 | $4.15 | $4.15 | $4.15 | $4.15 | $5.75 |
| 632E70000 POWER SERVICE | 1 EACH | $4,750 | $3,880 | $3,880 | $3,880 | $3,880 | $2,400 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $3,395 | $1,940 | $1,940 | $1,940 | $1,940 | $1,250 |
| 632E71368 SIGNAL SUPPORT, TYPE TC-12.31 DESIGN 10 POLE, WITH | 1 EACH | $33,310 | $34,360 | $34,360 | $34,360 | $34,360 | $35,000 |
| 632E72140 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 13 | 1 EACH | $20,790 | $20,615 | $20,615 | $20,615 | $20,615 | $25,000 |
| 632E89600 PEDESTAL, 8' | 2 EACH | $2,400 | $2,240 | $2,240 | $2,240 | $2,240 | $1,500 |
| 632E90010 PEDESTAL, MISC.: PEDESTAL, 15', TRANSFORMER BASE | 4 EACH | $2,050 | $1,988 | $1,988 | $1,988 | $1,988 | $2,000 |
| 633E65521 CABINET, TYPE 332, AS PER PLAN | 1 EACH | $17,185 | $16,640 | $16,640 | $16,640 | $16,640 | $20,000 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $1,570 | $1,755 | $1,755 | $2,000 | $1,755 | $4,500 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $905 | $850 | $850 | $1,015 | $850 | $3,000 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $9,860 | $9,558 | $9,558 | $9,558 | $9,558 | $9,200 |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 1 EACH | $9,155 | $9,290 | $9,290 | $9,290 | $9,290 | $9,000 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $7,300 | $7,770 | $7,770 | $7,770 | $7,770 | $9,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $70.00 | $75.00 | $100 | $125 | $97.10 | $95.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 25 FT | $3.50 | $3.50 | $3.50 | $3.50 | $5.19 | $5.50 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,600 | $2,600 | $2,600 | $2,600 | $3,509 | $5,800 |
| 614E12400 WORK ZONE IMPACT ATTENUATOR, MISC.:REMOVE AND RELO | 1 EACH | $1,800 | $1,800 | $1,800 | $1,800 | $2,075 | $2,600 |
| 614E12400 WORK ZONE IMPACT ATTENUATOR, MISC.:REMOVE AND STOR | 1 EACH | $1,900 | $1,900 | $1,900 | $1,900 | $1,119 | $850 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 25 EACH | $14.00 | $14.00 | $14.00 | $14.00 | $29.83 | $12.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 18 EACH | $21.00 | $21.00 | $21.00 | $21.00 | $29.83 | $24.00 |
| 614E18000 MAINTAINING TRAFFIC, MISC.:REMOVE AND STORE ODOT O | 10 EACH | $60.00 | $60.00 | $60.00 | $60.00 | $350 | $185 |
| 616E10000 WATER | 85 MGAL | $16.00 | $2.12 | $13.25 | $20.00 | $58.00 | $105 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 300 FT | $28.00 | $28.00 | $28.00 | $28.00 | $59.11 | $50.00 |
| 622E90000 BARRIER, MISC.:ADJUST BARRIER TO CLOSE OUTSIDE SHO | 410 FT | $12.00 | $12.00 | $12.00 | $12.00 | $7.56 | $15.00 |
| 622E90000 BARRIER, MISC.:REMOVE AND RELOCATE FROM RAMP P TO | 590 FT | $12.00 | $12.00 | $12.00 | $12.00 | $21.11 | $15.00 |
| 622E90000 BARRIER, MISC.:REMOVE AND STORE ODOT OWNED PORTABL | 1,910 FT | $14.00 | $14.00 | $14.00 | $14.00 | $11.42 | $9.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $9,800 | $9,800 | $9,800 | $12,500 | $3,970 | $14,500 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $43,530 | $1,022 | $14,000 | $50,000 | $8,995 | $75,000 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 11,485 LB | $2.10 | $1.99 | $1.90 | $1.75 | $1.50 | $2.25 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 288 SY | $24.00 | $29.00 | $24.00 | $27.00 | $29.00 | $30.00 |
| 516E13601 1" PREFORMED EXPANSION JOINT FILLER, AS PER PLAN | 533 SF | $15.00 | $5.92 | $6.50 | $12.00 | $7.76 | $19.00 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $44,200 | $18,756 | $38,150 | $25,000 | $30,923 | $31,000 |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $20,000 | $36,991 | $9,250 | $60,000 | $21,423 | $10,000 |
| 509E10000 EPOXY COATED REINFORCING STEEL | 10,121 LB | $1.20 | $1.95 | $1.85 | $1.75 | $1.56 | $2.27 |
| 511E46611 CLASS QC1 CONCRETE, HEADWALL, AS PER PLAN | 2 CY | $650 | $1,281 | $1,900 | $3,750 | $901 | $1,495 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 68 SY | $24.00 | $40.00 | $24.00 | $27.00 | $40.00 | $35.00 |
| 512E33000 TYPE 2 WATERPROOFING | 150 SY | $28.00 | $25.75 | $55.00 | $35.00 | $25.75 | $30.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 38 SF | $5.50 | $6.69 | $9.00 | $10.00 | $8.08 | $16.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 12 CY | $160 | $198 | $450 | $200 | $197 | $216 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $8,000 | $10,700 | $10,000 | $15,000 | $6,974 | $12,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $40,000 | $25,304 | $150,000 | $60,000 | $70,361 | $49,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $30,000 | $23,750 | $40,000 | $37,500 | $20,219 | $100,000 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $35,190 | $28,600 | $40,000 | $25,000 | $17,016 | $44,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 452E16060 13.5" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1 | 4,912 SY | $138 | $678k | 14% |
| 203E10000 EXCAVATION | 20,257 CY | $30 | $608k | 13% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 139 CY | $1,520 | $211k | 4% |
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN | 5,014 SF | $40 | $201k | 4% |
| 850E10010 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $2,700 | $135k | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $130,000 | $130k | 3% |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 943 FT | $118 | $111k | 2% |
| 203E98000 ROADWAY, MISC.:FLOOD CONTROL EMBANKMENT | 2,155 CY | $48 | $103k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 2% |
| 304E20000 AGGREGATE BASE | 905 CY | $90 | $81k | 2% |