| Item | Quantity | R1Allard Excavation LLC | R2Shelly & Sands INC | R3Shelly Company | R4Alan Stone CO INC | R5D G M INC | R6Complete General Construction Company | R7Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449), 8" | 1,106 CY | $192 | $200 | $192 | $200 | $220 | $192 | $211 | 19% |
| 839E30000 TRENCH DRAIN, TYPE B WITH STANDARD GRATE | 747 FT | $187 | $165 | $143 | $230 | $175 | $225 | $303 | 12% |
| Item | Quantity | R1Allard Excavation LLC | R2Shelly & Sands INC | R3Shelly Company | R4Alan Stone CO INC | R5D G M INC | R6Complete General Construction Company | R7Sunesis Construction CO |
|---|---|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" AND UNDER | 3,793 FT | $3.00 | $14.00 | $20.00 | $10.00 | $8.00 | $25.00 | $7.13 |
| 202E58100 CATCH BASIN REMOVED | 5 EACH | $175 | $400 | $665 | $530 | $400 | $450 | $315 |
| 202E98200 REMOVAL MISC.:, TRENCH DRAIN | 105 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4,050 FT |
| $31.86 |
| $15.00 |
| $34.25 |
| $22.00 |
| $25.00 |
| $18.00 |
| $33.53 |
| 11% |
| 624E10000 MOBILIZATION | 1 LS | $73,000 | $40,000 | $40,000 | $45,000 | $40,000 | $40,000 | $86,204 | 6% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 311 CY | $220 | $275 | $220 | $280 | $250 | $220 | $245 | 6% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 208 CY | $315 | $325 | $252 | $330 | $285 | $252 | $282 | 6% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 5,393 FT | $10.00 | $11.00 | $15.25 | $15.00 | $12.50 | $20.00 | $20.36 | 5% |
| 304E20000 AGGREGATE BASE, 6" | 830 CY | $61.00 | $75.00 | $64.50 | $65.00 | $85.00 | $70.00 | $116 | 4% |
| 611E05900 15" CONDUIT, TYPE B | 685 FT | $73.50 | $95.00 | $79.00 | $75.00 | $100 | $175 | $98.83 | 4% |
| 620E70010 DELINEATOR, MISC.: CONTINUOUS CURBING SYSTEM WITH | 610 FT | $82.00 | $72.00 | $72.00 | $70.00 | $85.00 | $72.00 | $130 | 4% |
| 203E10000 EXCAVATION | 2,153 CY | $21.50 | $40.00 | $40.25 | $25.00 | $35.00 | $35.00 | $59.28 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $44,400 | $40,240 | $80,000 | $57,000 | $129,000 | $120,000 | $38,461 | 4% |
| 202E23000 PAVEMENT REMOVED | 3,494 SY | $9.00 | $15.00 | $12.75 | $14.00 | $25.00 | $20.00 | $19.84 | 3% |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 18 SNMT | $1,200 | $1,000 | $1,000 | $930 | $1,200 | $1,100 | $928 | 2% |
| 611E98370 CATCH BASIN, NO. 6 | 6 EACH | $3,400 | $3,200 | $2,800 | $4,900 | $3,500 | $4,000 | $3,421 | 2% |
| 832E30000 EROSION CONTROL | 19,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $16,875 | $11,000 | $25,000 | $52,000 | $10,000 | $25,000 | $15,500 | 1% |
| 846E00111 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, A | 27 CF | $624 | $800 | $605 | $900 | $775 | $624 | $1,182 | 1% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 275 CY | $61.25 | $70.00 | $58.50 | $55.00 | $90.00 | $60.00 | $133 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $13,500 | $9,200 | $7,500 | $20,000 | $45,000 | $13,000 | $10,642 | 1% |
| $17.00 |
| $15.00 |
| $25.25 |
| $15.00 |
| $30.00 |
| $40.00 |
| $12.36 |
| 203E20000 EMBANKMENT | 123 CY | $21.00 | $12.00 | $57.75 | $25.00 | $25.00 | $20.00 | $37.27 |
| 204E10000 SUBGRADE COMPACTION | 824 SY | $3.15 | $3.00 | $2.00 | $20.00 | $15.00 | $3.00 | $3.42 |
| 204E45000 PROOF ROLLING | 1 HOUR | $150 | $250 | $975 | $1,500 | $75.00 | $400 | $340 |
| 204E50000 GEOTEXTILE FABRIC | 824 SY | $1.25 | $0.60 | $1.00 | $2.00 | $2.50 | $3.00 | $1.57 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 3,897 FT | $2.00 | $6.00 | $6.00 | $6.50 | $6.25 | $2.00 | $3.36 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.25" MAX. | 106 SY | $65.00 | $6.00 | $12.00 | $50.00 | $40.00 | $65.00 | $21.25 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $50.00 | $125 | $200 | $120 | $70.00 | $100 | $150 |
| 659E00300 TOPSOIL | 179 CY | $24.00 | $40.00 | $90.20 | $65.00 | $25.00 | $56.00 | $99.67 |
| 659E10000 SEEDING AND MULCHING | 555 SY | $1.65 | $6.50 | $5.00 | $7.00 | $5.00 | $5.25 | $6.10 |
| 659E14000 REPAIR SEEDING AND MULCHING | 28 SY | $0.05 | $0.80 | $1.00 | $6.50 | $0.05 | $5.25 | $2.25 |
| 659E15000 INTER-SEEDING | 28 SY | $0.05 | $0.80 | $0.01 | $0.30 | $0.05 | $5.25 | $2.25 |
| 659E20000 COMMERCIAL FERTILIZER | 0.08 TON | $500 | $855 | $1,500 | $1,000 | $1,400 | $1,400 | $1,400 |
| 659E31000 LIME | 1 ACRE | $500 | $156 | $200 | $710 | $100 | $100 | $450 |
| 659E35000 WATER | 4 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 659E40000 MOWING | 1.25 MSF | $1,200 | $10.00 | $1.00 | $3,100 | $40.00 | $1,500 | $100 |
| 670E00500 SLOPE EROSION PROTECTION | 1,048 SY | $1.95 | $1.65 | $2.75 | $2.50 | $2.50 | $2.50 | $2.50 |
| 670E00700 DITCH EROSION PROTECTION | 125 SY | $2.00 | $1.65 | $2.75 | $7.50 | $2.50 | $2.50 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,625 | $2,500 | $1,625 | $1,600 | $2,000 | $2,000 | $1,625 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,000 | $7,000 | $1,200 | $6,800 | $5,000 | $8,500 | $3,360 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $11,500 | $11,500 | $7,300 | $12,000 | $12,000 | $11,500 | $11,474 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 49 FT | $15.50 | $35.00 | $80.50 | $50.00 | $50.00 | $24.00 | $45.95 |
| 611E00900 6" CONDUIT, TYPE B | 58 FT | $21.00 | $25.00 | $73.00 | $50.00 | $50.00 | $50.00 | $51.64 |
| 611E05900 15" CONDUIT, TYPE B, 706.02 | 11 FT | $124 | $200 | $292 | $460 | $400 | $205 | $470 |
| 611E05900 15" CONDUIT, TYPE B, 707.01 | 10 FT | $88.40 | $200 | $195 | $520 | $200 | $190 | $344 |
| 611E07400 18" CONDUIT, TYPE B, 706.02 | 5 FT | $220 | $230 | $465 | $860 | $350 | $260 | $543 |
| 611E98410 CATCH BASIN, NO. 8 | 1 EACH | $5,400 | $7,500 | $5,850 | $6,800 | $10,500 | $3,500 | $7,088 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $4,000 | $3,600 | $3,025 | $7,500 | $3,500 | $4,500 | $4,083 |
| 407E10000 TACK COAT, 0.055 GAL./SY | 821 GAL | $2.50 | $3.00 | $2.50 | $3.00 | $3.50 | $2.50 | $3.50 |
| 625E00450 CONNECTION, FUSED PULL APART | 2 EACH | $100 | $100 | $300 | $110 | $110 | $300 | $204 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 2 EACH | $100 | $100 | $300 | $110 | $110 | $300 | $192 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 12 EACH | $100 | $100 | $125 | $110 | $110 | $125 | $185 |
| 625E10490 LIGHT POLE, CONVENTIONAL, NO. AT12B40 | 1 EACH | $4,300 | $4,300 | $5,000 | $4,600 | $4,500 | $5,000 | $3,756 |
| 625E10490 LIGHT POLE, CONVENTIONAL, NO. AT18B40 | 1 EACH | $4,600 | $4,600 | $6,000 | $4,900 | $500 | $6,000 | $4,032 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 2 EACH | $3,300 | $3,300 | $4,000 | $3,500 | $3,500 | $5,000 | $2,457 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 660 FT | $4.50 | $4.50 | $5.75 | $5.00 | $5.00 | $5.75 | $5.01 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 360 FT | $2.50 | $2.50 | $3.00 | $2.50 | $2.75 | $3.00 | $1.80 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 26 FT | $26.00 | $26.00 | $8.00 | $30.00 | $28.00 | $8.00 | $22.98 |
| 625E25500 CONDUIT, 3", 725.04 | 40 FT | $42.00 | $42.00 | $50.00 | $45.00 | $44.00 | $50.00 | $36.21 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 190 FT | $55.00 | $55.00 | $70.00 | $60.00 | $60.00 | $70.00 | $58.69 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 2 EACH | $800 | $800 | $750 | $850 | $1,000 | $750 | $648 |
| 625E29002 TRENCH, 24" DEEP | 66 FT | $32.00 | $32.00 | $35.00 | $35.00 | $34.00 | $35.00 | $11.82 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $1,250 | $1,250 | $2,500 | $1,300 | $1,300 | $2,500 | $1,332 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,500 | $1,500 | $3,000 | $1,600 | $1,600 | $3,000 | $1,512 |
| 625E32000 GROUND ROD | 2 EACH | $345 | $345 | $500 | $370 | $350 | $500 | $450 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $2,600 | $2,600 | $12,000 | $2,800 | $2,700 | $12,000 | $2,160 |
| 625E34450 CONTROL CENTER CABINET, COMPLETE | 1 EACH | $10,472 | $10,472 | $5,500 | $11,000 | $14,000 | $5,500 | $14,340 |
| 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 3 MILE | $2,200 | $2,100 | $2,100 | $6,300 | $3,000 | $2,500 | $4,889 |
| 621E00100 RPM | 181 EACH | $69.62 | $45.00 | $45.00 | $45.00 | $45.00 | $49.00 | $44.24 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 165 FT | $21.00 | $15.00 | $15.00 | $15.00 | $23.00 | $15.00 | $21.43 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 65 FT | $40.00 | $17.00 | $17.00 | $15.00 | $25.00 | $17.00 | $25.53 |
| 630E08600 SIGN POST REFLECTOR , RED | 4 EACH | $55.00 | $45.00 | $45.00 | $45.00 | $70.00 | $45.00 | $66.84 |
| 630E08600 SIGN POST REFLECTOR , YELLOW | 5 EACH | $55.00 | $45.00 | $45.00 | $45.00 | $70.00 | $45.00 | $66.84 |
| 630E80100 SIGN, FLAT SHEET | 136 SF | $16.00 | $18.75 | $18.75 | $20.00 | $26.00 | $18.75 | $25.76 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 8 EACH | $20.00 | $10.00 | $10.00 | $10.00 | $16.00 | $10.00 | $15.62 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 10 EACH | $25.00 | $15.00 | $15.00 | $15.00 | $21.00 | $15.00 | $20.33 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 74 FT | $40.55 | $5.00 | $5.00 | $40.00 | $45.00 | $5.00 | $41.00 |
| 644E00104 EDGE LINE, 6", WHITE | 1.53 MILE | $6,000 | $5,151 | $5,151 | $4,200 | $6,000 | $5,151 | $6,067 |
| 644E00104 EDGE LINE, 6", YELLOW | 1.05 MILE | $6,000 | $5,151 | $5,151 | $4,200 | $6,000 | $5,151 | $6,067 |
| 644E00204 LANE LINE, 6" | 1.52 MILE | $3,000 | $2,230 | $2,230 | $3,400 | $3,300 | $2,230 | $3,033 |
| 644E00300 CENTER LINE | 0.42 MILE | $10,545 | $7,750 | $7,750 | $5,400 | $6,500 | $7,750 | $10,662 |
| 644E00404 CHANNELIZING LINE, 12" | 2,529 FT | $2.50 | $2.35 | $2.35 | $2.00 | $2.50 | $2.35 | $2.53 |
| 644E00500 STOP LINE | 45 FT | $10.25 | $10.50 | $10.50 | $10.00 | $11.00 | $10.50 | $10.36 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 613 FT | $8.00 | $8.00 | $8.00 | $6.50 | $8.00 | $8.00 | $8.09 |
| 644E00900 ISLAND MARKING | 389 SF | $4.13 | $3.00 | $3.00 | $5.00 | $6.00 | $3.00 | $6.57 |
| 644E01300 LANE ARROW | 4 EACH | $200 | $110 | $110 | $95.00 | $100 | $110 | $202 |
| 644E01350 LANE REDUCTION ARROW | 2 EACH | $400 | $225 | $225 | $210 | $250 | $225 | $404 |
| 644E01510 DOTTED LINE, 6" | 767 FT | $2.20 | $1.80 | $1.80 | $0.80 | $1.00 | $1.80 | $2.22 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 1,386 SY | $7.35 | $8.00 | $7.35 | $25.00 | $7.50 | $7.35 | $14.62 |
| 407E10000 TACK COAT | 77 GAL | $2.50 | $3.00 | $2.50 | $3.00 | $3.50 | $2.50 | $3.50 |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 58 CY | $155 | $400 | $155 | $400 | $345 | $155 | $408 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $85.00 | $90.00 | $80.00 | $80.00 | $100 | $91.00 | $75.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,200 | $2,720 | $2,800 | $2,700 | $2,500 | $3,000 | $2,036 |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $1,620 | $4,000 | $3,250 | $5,300 | $5,500 | $25,000 | $6,432 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 414 EACH | $11.00 | $11.00 | $11.00 | $7.00 | $8.00 | $15.00 | $29.64 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 81 EACH | $28.00 | $10.00 | $15.00 | $10.00 | $13.00 | $20.00 | $11.49 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 2 MILE | $1,325 | $1,325 | $750 | $300 | $500 | $750 | $302 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" (WHITE) | 2 MILE | $2,050 | $2,050 | $1,120 | $1,000 | $1,200 | $1,120 | $1,010 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" (YELLOW) | 2 MILE | $1,665 | $1,665 | $1,120 | $1,000 | $1,300 | $1,120 | $1,010 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 2,731 FT | $0.65 | $0.65 | $0.75 | $0.50 | $6.00 | $0.75 | $0.53 |
| 616E10000 WATER | 5 MGAL | $1.00 | $80.00 | $1.00 | $0.20 | $1.00 | $1,566 | $20.22 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $1,500 | $5,100 | $2,500 | $700 | $750 | $2,500 | $1,452 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 302E56000 ASPHALT CONCRETE BASE, PG64-22, (449), 8" | 1,106 CY | $192 | $212k | 15% |
| 839E30000 TRENCH DRAIN, TYPE B WITH STANDARD GRATE | 747 FT | $186.5 | $139k | 10% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 4,050 FT | $31.86 | $129k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $73,000 | $73k | 5% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 311 CY | $220 | $68k | 5% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 208 CY | $315 | $66k | 5% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 5,393 FT | $10 | $54k | 4% |
| 304E20000 AGGREGATE BASE, 6" | 830 CY | $61 | $51k | 4% |
| 611E05900 15" CONDUIT, TYPE B | 685 FT | $73.5 | $50k | 4% |
| 620E70010 DELINEATOR, MISC.: CONTINUOUS CURBING SYSTEM WITH | 610 FT | $82 | $50k | 4% |