HAR-CR 75-18.00
HAR County · est $1.3M
Bid dateThursday, April 13—
HAR County · est $1.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 52 more items below.
| Item | Quantity | R1Miller Bros Const INC | R2Crawford Construction Company INC | R3R & I Construction INC | % of bid |
|---|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 21 EACH | $10,500 | $12,400 | $12,000 | 19% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $145,000 | $57,000 | $132,212 | 13% |
| 507E92201 PREBORED HOLES, AS PER PLAN | 900 FT | $150 | $213 | $110 | 12% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 113 CY | $875 | $606 | $1,000 | 9% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 140 CY | $600 | $448 | $800 | 7% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 269 FT | $224 | $248 | $220 | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 34,048 LB |
| Item | Quantity | R1Miller Bros Const INC | R2Crawford Construction Company INC | R3R & I Construction INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $2,700 | $1,000 |
| 202E23000 PAVEMENT REMOVED | 1,052 SY | $6.00 | $17.00 | $6.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 20 FT | $20.00 | $9.00 | $2.00 |
| 203E10000 EXCAVATION | 344 CY | $25.00 | $24.00 | $10.00 |
| 203E20000 EMBANKMENT | 450 CY | $25.00 | $12.00 | $20.00 |
| 204E10000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1.60 |
| $1.60 |
| $2.00 |
| 5% |
| 511E42512 CLASS QC1 CONCRETE WITH QC/QA, PIER CAP | 43 CY | $1,125 | $1,000 | $1,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $52,000 | $70,000 | 3% |
| 507E00101 STEEL PILES HP10X42, FURNISHED, AS PER PLAN | 980 FT | $40.00 | $70.00 | $60.00 | 3% |
| 507E00301 STEEL PILES HP14X73, FURNISHED, AS PER PLAN | 480 FT | $66.00 | $75.00 | $80.00 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 119 CY | $250 | $285 | $245 | 3% |
| 516E44000 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 84 EACH | $335 | $380 | $325 | 2% |
| 507E71200 SPECIAL - PILE ENCASEMENT | 156 FT | $175 | $190 | $100 | 2% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 254 CY | $100 | $80.00 | $80.00 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 87 CY | $270 | $326 | $295 | 2% |
| 304E20000 AGGREGATE BASE | 309 CY | $70.00 | $70.00 | $60.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,000 | $12,300 | $17,000 | 1% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $15,000 | $19,700 | $10,000 | 1% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 185 SY | $65.00 | $30.00 | $26.00 | 1% |
| 1,194 SY |
| $1.25 |
| $1.70 |
| $2.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $200 | $345 | $25.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 289 FT | $24.00 | $27.00 | $26.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 4 EACH | $2,200 | $2,430 | $2,125 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,150 | $1,300 | $1,175 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 3 EACH | $1,900 | $2,100 | $1,950 |
| 606E35003 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, AS PER PLAN | 1 EACH | $1,900 | $2,120 | $1,950 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $500 | $550 | $1,510 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,000 | $550 | $1,510 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $245 | $615 | $245 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $225 | $300 | $200 |
| 659E00300 TOPSOIL | 187 CY | $20.00 | $36.00 | $20.00 |
| 659E10000 SEEDING AND MULCHING | 1,687 SY | $2.10 | $3.60 | $3.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 84 SY | $2.10 | $1.10 | $1.00 |
| 659E15000 INTER-SEEDING | 84 SY | $1.00 | $0.11 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.24 TON | $800 | $528 | $500 |
| 659E31000 LIME | 0.35 ACRE | $35.00 | $50.00 | $10.00 |
| 659E35000 WATER | 10 MGAL | $1.00 | $1.10 | $1.00 |
| 832E30000 EROSION CONTROL | 12,000 EACH | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 162 FT | $14.00 | $19.00 | $10.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $8.00 | $15.00 | $6.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $8.00 | $15.00 | $6.00 |
| 611E02600 8" CONDUIT, TYPE F | 50 FT | $10.00 | $20.00 | $10.00 |
| 611E04400 12" CONDUIT, TYPE B | 50 FT | $12.00 | $25.00 | $12.00 |
| 611E06100 15" CONDUIT, TYPE C | 20 FT | $135 | $90.00 | $15.00 |
| 613E41201 LOW STRENGTH MORTAR BACKFILL, AS PER PLAN | 37 CY | $225 | $338 | $120 |
| 407E20000 NON-TRACKING TACK COAT | 114 GAL | $1.00 | $5.00 | $4.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, (BIDIRECTIONAL) | 3 EACH | $10.00 | $21.00 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BIDIRECTIONAL) | 9 EACH | $10.00 | $15.00 | $10.00 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 14 FT | $12.00 | $30.00 | $12.00 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 4 EACH | $25.00 | $112 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $150 | $61.00 | $150 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $25.00 | $63.00 | $25.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.11 MILE | $16,500 | $19,200 | $16,500 |
| 616E10000 WATER | 2 MGAL | $75.00 | $11.20 | $1.00 |
| 202E23500 WEARING COURSE REMOVED | 285 SY | $6.00 | $20.00 | $10.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 217 SY | $31.00 | $31.00 | $30.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 33 SF | $9.00 | $27.00 | $5.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 86 FT | $30.00 | $32.00 | $29.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 80 FT | $12.00 | $19.00 | $10.00 |
| 516E41100 1/8" PREFORMED BEARING PAD | 84 EACH | $5.00 | $6.00 | $5.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 45 CY | $90.00 | $70.00 | $100 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 315 FT | $16.00 | $16.00 | $10.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 123 FT | $10.00 | $14.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 48 FT | $20.00 | $14.00 | $10.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $4,800 | $4,250 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $3,000 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 21 EACH | $10,500 | $221k | 17% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $145,000 | $145k | 11% |
| 507E92201 PREBORED HOLES, AS PER PLAN | 900 FT | $150 | $135k | 11% |
| 511E31611 CLASS QC2 CONCRETE, SUPERSTRUCTURE, AS PER PLAN | 113 CY | $875 | $99k | 8% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 140 CY | $600 | $84k | 7% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 269 FT | $223.75 | $60k | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 34,048 LB | $1.6 | $54k | 4% |
| 511E42512 CLASS QC1 CONCRETE WITH QC/QA, PIER CAP | 43 CY | $1,125 | $48k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 507E00101 STEEL PILES HP10X42, FURNISHED, AS PER PLAN | 980 FT | $40 | $39k | 3% |