SUM-SR 18-01.01
SUM County · est $1.9M
Bid dateThursday, January 11—
SUM County · est $1.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 47 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Ronyak Paving INC | R3Karvo Companies INC | R4Kokosing Construction Company INC | R5Kenmore Construction CO INC | R6Barbicas Construction Company INC | R7Shelly Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3,662 CY | $250 | $230 | $245 | $290 | $276 | $275 | $290 | 53% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 1 1/2") | 87,871 SY | $2.10 | $2.00 | $2.75 | $1.50 | $3.90 | $3.50 | $2.25 | 11% |
| Item | Quantity | R1Shelly & Sands INC | R2Ronyak Paving INC | R3Karvo Companies INC | R4Kokosing Construction Company INC | R5Kenmore Construction CO INC | R6Barbicas Construction Company INC | R7Shelly Company |
|---|---|---|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 15 SY | $80.00 | $15.00 | $12.00 | $25.00 | $50.00 | $50.00 | $90.00 |
| 202E30000 WALK REMOVED | 514 SF | $6.10 | $8.00 | $8.00 | $4.00 | $5.00 | $2.00 | $8.50 |
| 202E32500 CURB AND GUTTER REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $114,252 |
| $225,000 |
| $211,000 |
| $81,432 |
| $175,000 |
| $250,000 |
| $305,000 |
| 7% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,750 SY | $50.00 | $88.00 | $58.00 | $125 | $55.00 | $25.00 | $120 | 5% |
| 252E01000 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 600 SY | $136 | $250 | $115 | $250 | $155 | $150 | $215 | 5% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 7 EACH | $9,400 | $9,400 | $9,400 | $9,400 | $8,496 | $12,500 | $9,400 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $103,700 | $199,130 | $100,000 | $40,000 | $250,000 | $100,000 | 2% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 18 EACH | $1,700 | $1,700 | $1,700 | $1,700 | $1,470 | $1,800 | $1,700 | 2% |
| 441E00100 ANTI-SEGREGATION EQUIPMENT | 3,044 CY | $8.40 | $5.00 | $8.00 | $0.50 | $12.00 | $15.00 | $15.00 | 1% |
| 407E20000 NON-TRACKING TACK COAT AT 0.09 GAL/SY | 7,922 GAL | $3.05 | $3.00 | $3.00 | $2.00 | $5.00 | $3.00 | $3.00 | 1% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 7 EACH | $3,000 | $1,925 | $2,200 | $3,000 | $1,700 | $1,800 | $2,500 | 1% |
| 831E00100 LONGITUDINAL CHANNELIZING DEVICE | 205 FT | $98.00 | $98.00 | $99.50 | $98.00 | $98.00 | $105 | $98.00 | 1% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 2 EACH | $9,700 | $9,700 | $9,700 | $9,700 | $8,755 | $15,000 | $9,700 | 1% |
| 621E00100 RPM (WHITE/RED) | 506 EACH | $38.00 | $38.00 | $33.00 | $36.80 | $36.80 | $37.00 | $36.80 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,000 | $1,750 | $2,000 | $1,500 | $3,500 | $750 | $2,200 | 1% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 142 CY | $115 | $125 | $143 | $50.00 | $35.00 | $75.00 | $140 | 1% |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 3,600 FT | $4.00 | $2.00 | $5.00 | $6.00 | $3.50 | $5.00 | $5.00 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $85.00 | $125 | $80.00 | $135 | $120 | $85.00 | $100 | 1% |
| 646E10310 CHANNELIZING LINE, 12" | 5,825 FT | $1.95 | $1.95 | $1.95 | $2.00 | $1.95 | $2.00 | $2.00 | 1% |
| 646E10110 LANE LINE, 6" | 5.46 MILE | $2,060 | $2,060 | $2,060 | $2,250 | $2,060 | $2,250 | $2,250 | 1% |
| 50 FT |
| $16.00 |
| $16.00 |
| $75.00 |
| $25.00 |
| $12.00 |
| $20.00 |
| $50.00 |
| 202E98100 REMOVAL MISC.: BARRIER REFLECTOR | 19 EACH | $6.00 | $6.00 | $5.00 | $6.00 | $10.00 | $6.00 | $6.00 |
| 203E10000 EXCAVATION (FOR PAVEMENT REPAIR) | 100 CY | $48.00 | $65.00 | $25.00 | $40.00 | $15.00 | $25.00 | $25.00 |
| 209E60200 LINEAR GRADING | 115 STA | $85.00 | $18.00 | $50.00 | $50.00 | $150 | $25.00 | $92.00 |
| 608E10000 4" CONCRETE WALK | 122 SF | $14.50 | $45.00 | $20.00 | $30.00 | $20.00 | $15.00 | $55.00 |
| 608E52000 CURB RAMP | 380 SF | $26.50 | $45.00 | $25.00 | $40.00 | $35.00 | $25.00 | $40.00 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 2 EACH | $3,000 | $1,275 | $2,100 | $1,900 | $950 | $1,800 | $2,000 |
| 690E21000 SPECIAL - AS-BUILT CONSTRUCTION RECORD DRAWINGS | 1 LS | $2,200 | $2,500 | $625 | $500 | $5,000 | $2,000 | $5,000 |
| 831E00500 REMOVAL OF LONGITUDINAL CHANNELIZING DEVICE | 205 FT | $5.00 | $5.00 | $5.50 | $5.00 | $5.00 | $10.00 | $5.00 |
| 659E10000 SEEDING AND MULCHING | 3,097 SY | $1.35 | $1.00 | $0.70 | $2.70 | $1.00 | $1.50 | $1.35 |
| 659E20000 COMMERCIAL FERTILIZER | 0.42 TON | $912 | $150 | $500 | $580 | $900 | $150 | $915 |
| 659E31000 LIME | 0.64 ACRE | $156 | $150 | $25.00 | $20.00 | $150 | $20.00 | $156 |
| 659E35000 WATER | 16.7 MGAL | $1.00 | $5.00 | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $3,200 | $1,950 | $2,000 | $3,000 | $2,900 | $1,500 | $2,500 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 1 EACH | $3,200 | $2,750 | $2,400 | $3,500 | $1,500 | $2,200 | $3,000 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 50 LB | $3.50 | $5.00 | $1.00 | $4.00 | $4.00 | $75.00 | $8.00 |
| 304E20000 AGGREGATE BASE (FOR PAVEMENT REPAIR) | 100 CY | $65.00 | $85.00 | $45.00 | $60.00 | $70.00 | $50.00 | $75.00 |
| 408E10001 PRIME COAT, AS PER PLAN AT 0.4 GAL/SY | 1,033 GAL | $3.50 | $3.00 | $6.00 | $4.50 | $5.00 | $6.00 | $6.00 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 12 FT | $72.00 | $125 | $100 | $125 | $90.00 | $100 | $245 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $3,000 | $1,300 | $2,200 | $2,900 | $1,300 | $1,000 | $2,000 |
| 621E00100 RPM (YELLOW/YELLOW) | 109 EACH | $38.00 | $38.00 | $33.00 | $36.80 | $36.80 | $37.00 | $36.80 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 497 EACH | $5.00 | $3.00 | $1.00 | $3.00 | $5.00 | $6.00 | $8.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, ONE WAY | 51 EACH | $11.00 | $11.00 | $10.00 | $11.00 | $11.00 | $11.00 | $11.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE WAY | 24 EACH | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 |
| 646E10010 EDGE LINE, 6" | 3.04 MILE | $3,300 | $3,300 | $3,300 | $3,250 | $3,300 | $3,250 | $3,250 |
| 646E10200 CENTER LINE | 1.66 MILE | $4,000 | $4,000 | $4,000 | $4,500 | $4,000 | $4,500 | $4,500 |
| 646E10400 STOP LINE | 548 FT | $11.50 | $11.50 | $11.50 | $12.50 | $11.50 | $12.50 | $12.50 |
| 646E10520 CROSSWALK LINE, 24" | 839 FT | $10.00 | $10.00 | $10.00 | $12.50 | $10.00 | $12.50 | $12.50 |
| 646E20300 LANE ARROW | 64 EACH | $150 | $150 | $150 | $175 | $150 | $175 | $175 |
| 646E20370 TWO WAY LEFT TURN ARROW | 4 EACH | $160 | $160 | $160 | $175 | $160 | $175 | $175 |
| 646E20504 DOTTED LINE, 6" | 1,675 FT | $1.75 | $4.00 | $4.00 | $1.75 | $4.00 | $1.75 | $1.75 |
| 614E12460 WORK ZONE MARKING SIGN | 7 EACH | $185 | $75.00 | $105 | $75.00 | $250 | $100 | $75.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $550 | $475 | $200 | $550 | $300 | $150 | $120 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $900 | $750 | $600 | $300 | $900 | $750 | $750 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 5.46 MILE | $590 | $590 | $590 | $750 | $590 | $750 | $750 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 5.46 MILE | $490 | $490 | $490 | $750 | $490 | $750 | $750 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 1.66 MILE | $1,300 | $1,300 | $1,300 | $1,250 | $1,300 | $1,250 | $1,250 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.66 MILE | $1,200 | $1,200 | $1,200 | $1,250 | $1,200 | $1,250 | $1,250 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 2.3 MILE | $750 | $750 | $750 | $850 | $750 | $850 | $850 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 5,825 FT | $0.80 | $0.80 | $0.80 | $0.75 | $0.80 | $0.75 | $0.75 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 5,825 FT | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 548 FT | $3.30 | $3.30 | $3.30 | $3.50 | $3.30 | $3.50 | $3.50 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 548 FT | $3.00 | $3.00 | $3.00 | $3.50 | $3.00 | $3.50 | $3.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $14,912 | $25,000 | $8,750 | $18,000 | $18,000 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $3,500 | $2,000 | $1,500 | $3,000 | $250 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 3,662 CY | $250.2 | $916k | 48% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 1 1/2") | 87,871 SY | $2.1 | $185k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $114,252 | $114k | 6% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,750 SY | $50 | $88k | 5% |
| 252E01000 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 600 SY | $136.25 | $82k | 4% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 7 EACH | $9,400 | $66k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 2% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 18 EACH | $1,700 | $31k | 2% |
| 441E00100 ANTI-SEGREGATION EQUIPMENT | 3,044 CY | $8.4 | $26k | 1% |
| 407E20000 NON-TRACKING TACK COAT AT 0.09 GAL/SY | 7,922 GAL | $3.05 | $24k | 1% |