LAK-Liberty Street
LAK County · est $1.2M
Bid dateThursday, January 25—
LAK County · est $1.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Cole Burton Contractors, LLC | R2Barbicas Construction Company INC | R3Ronyak Paving INC | R4Phillips Paving LLC | R5Shelly Company | R6Karvo Companies INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (985 CY | $185 | $200 | $165 | $170 | $215 | $300 | 21% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 663 CY | $225 | $255 | $195 | $200 | $275 | $325 | 18% |
| 608E52000 CURB RAMP | 5,340 SF | $14.65 | $14.65 | $26.00 |
| Item | Quantity | R1Cole Burton Contractors, LLC | R2Barbicas Construction Company INC | R3Ronyak Paving INC | R4Phillips Paving LLC | R5Shelly Company | R6Karvo Companies INC |
|---|---|---|---|---|---|---|---|
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 7 EACH | $550 | $550 | $795 | $550 | $550 | $550 |
| 623E39601 MONUMENT ASSEMBLY RECONSTRUCTED TO GRADE, AS PER P | 1 EACH | $1,055 | $1,055 | $1,100 | $1,055 | $1,055 | $1,055 |
| 659E00300 TOPSOIL | 50 CY | $100 | $70.00 | $100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $14.65 |
| $15.00 |
| $14.65 |
| 9% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 2,000 SY | $35.00 | $26.00 | $58.00 | $50.00 | $85.00 | $75.00 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $64,750 | $65,000 | $34,000 | $148,000 | $266,000 | $200,000 | 8% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 19,603 SY | $2.35 | $4.00 | $2.75 | $5.00 | $4.35 | $9.00 | 5% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 20,000 LB | $2.00 | $1.75 | $2.00 | $2.00 | $2.25 | $2.00 | 5% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 47 EACH | $665 | $550 | $975 | $665 | $665 | $665 | 4% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 35 EACH | $850 | $700 | $1,100 | $850 | $850 | $850 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 55 CY | $455 | $400 | $375 | $450 | $425 | $455 | 3% |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 41 EACH | $420 | $200 | $675 | $420 | $420 | $420 | 2% |
| 609E26000 CURB, TYPE 6 | 675 FT | $24.65 | $24.00 | $35.00 | $24.65 | $24.65 | $24.65 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $75,000 | $51,130 | $75,000 | $40,000 | $225,000 | 2% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 9 EACH | $1,500 | $1,600 | $1,500 | $1,350 | $1,350 | $1,350 | 2% |
| 202E30000 WALK REMOVED | 5,772 SF | $2.25 | $2.25 | $3.00 | $2.25 | $2.25 | $2.25 | 2% |
| 646E10510 CROSSWALK LINE, 12" | 2,180 FT | $5.95 | $10.00 | $4.50 | $10.00 | $10.00 | $5.95 | 2% |
| 646E20650 SHARED LANE MARKING | 53 EACH | $220 | $300 | $275 | $300 | $300 | $220 | 1% |
| 202E32000 CURB REMOVED | 715 FT | $15.75 | $15.75 | $8.00 | $15.75 | $15.75 | $15.75 | 1% |
| 611E99661 MANHOLE RECONSTRUCTED TO GRADE, AS PER PLAN | 8 EACH | $1,350 | $1,100 | $1,600 | $1,350 | $1,350 | $1,350 | 1% |
| 614E12420 DETOUR SIGNING | 1 LS | $10,400 | $7,000 | $18,500 | $4,500 | $4,500 | $5,500 | 1% |
| $100 |
| $150 |
| $100 |
| 659E10000 SEEDING AND MULCHING | 450 SY | $3.00 | $3.00 | $2.00 | $10.00 | $8.00 | $3.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 4 EACH | $2,390 | $2,500 | $1,400 | $2,390 | $2,390 | $2,390 |
| 407E20000 NON-TRACKING TACK COAT | 2,758 GAL | $3.00 | $3.75 | $3.00 | $2.00 | $2.50 | $4.00 |
| 609E20001 CURB, TYPE 3-A, AS PER PLAN | 40 FT | $32.90 | $30.00 | $30.00 | $32.90 | $32.90 | $32.90 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 1,171 LB | $2.25 | $3.00 | $3.00 | $3.00 | $5.00 | $1.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 237.5 FT | $12.00 | $12.50 | $12.00 | $12.50 | $12.50 | $19.37 |
| 630E80100 SIGN, FLAT SHEET | 170.5 SF | $16.00 | $30.00 | $16.00 | $30.00 | $30.00 | $23.20 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $30.00 | $10.00 | $30.00 | $10.00 | $10.00 | $16.09 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $95.00 | $75.00 | $95.00 | $75.00 | $75.00 | $59.66 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $35.00 | $10.00 | $35.00 | $10.00 | $10.00 | $21.45 |
| 630E86274 REMOVAL OF GROUND MOUNTED PIPE SUPPORT AND REERECT | 1 EACH | $400 | $250 | $400 | $250 | $250 | $163 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 6 EACH | $25.00 | $10.00 | $25.00 | $10.00 | $10.00 | $16.09 |
| 646E10200 CENTER LINE | 1.11 MILE | $7,300 | $3,750 | $5,800 | $3,750 | $3,750 | $7,300 |
| 646E10300 CHANNELIZING LINE, 8" | 457 FT | $1.75 | $2.75 | $2.50 | $2.75 | $2.75 | $1.66 |
| 646E10400 STOP LINE | 453 FT | $12.50 | $12.50 | $14.00 | $12.50 | $12.50 | $12.50 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 150 FT | $12.00 | $12.50 | $9.00 | $12.50 | $12.50 | $12.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 2 EACH | $700 | $750 | $750 | $750 | $750 | $700 |
| 646E20300 LANE ARROW | 12 EACH | $170 | $200 | $175 | $200 | $200 | $170 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $75.00 | $80.00 | $100 | $100 | $100 | $100 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $475 | $175 | $275 | $325 | $150 | $325 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 6 SNMT | $1,000 | $900 | $1,000 | $900 | $900 | $1,000 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 1.11 MILE | $1,750 | $1,750 | $1,800 | $1,750 | $1,750 | $1,750 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 1,371 FT | $1.00 | $0.75 | $0.95 | $0.75 | $0.75 | $0.75 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 1,329 FT | $3.00 | $5.00 | $4.50 | $5.00 | $5.00 | $3.00 |
| 614E27050 WORK ZONE CROSSWALK LINE, CLASS I, 12", 642 PAINT | 4,110 FT | $1.50 | $3.00 | $2.50 | $3.00 | $3.00 | $1.50 |
| 614E32200 WORK ZONE RAILROAD SYMBOL MARKING, CLASS I, 642 PA | 6 EACH | $200 | $225 | $385 | $225 | $225 | $200 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $8,000 | $8,338 | $15,000 | $5,000 | $15,000 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $5,100 | $300 | $2,000 | $5,000 | $5,000 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,525 | $14,500 | $33,685 | $50.00 | $10,000 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (985 CY | $185 | $182k | 19% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 663 CY | $225 | $149k | 15% |
| 608E52000 CURB RAMP | 5,340 SF | $14.65 | $78k | 8% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 2,000 SY | $35 | $70k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $64,750 | $65k | 7% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 19,603 SY | $2.35 | $46k | 5% |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 20,000 LB | $2 | $40k | 4% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 47 EACH | $665 | $31k | 3% |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 35 EACH | $850 | $30k | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 55 CY | $455 | $25k | 3% |