KNO-SR 3-32.25
KNO County · est $0.2M
Bid dateThursday, January 25—
KNO County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 18 more items below.
| Item | Quantity | R1Mc Connell Contracting INC | R2Crawford Construction Company INC | R3Fechko Excavating LLC | R4Bcc Ohio INC | R5Adena Corporation | R6Axis Civil Construction LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 515E10030 PRESTRESSED CONCRETE NON-COMPOSITE BOX BEAM BRIDGE | 1 EACH | $51,000 | $33,100 | $48,200 | $43,746 | $35,961 | $32,000 | 27% |
| 624E10000 MOBILIZATION | 1 LS | $16,500 | $11,200 | $20,500 | $8,501 | $11,688 | $20,000 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $10,300 | $8,775 | $2,079 |
| Item | Quantity | R1Mc Connell Contracting INC | R2Crawford Construction Company INC | R3Fechko Excavating LLC | R4Bcc Ohio INC | R5Adena Corporation | R6Axis Civil Construction LLC |
|---|---|---|---|---|---|---|---|
| 202E23500 WEARING COURSE REMOVED | 54 SY | $10.00 | $59.00 | $32.00 | $17.11 | $38.35 | $200 |
| 203E20001 EMBANKMENT, AS PER PLAN | 10 CY | $25.00 | $140 | $26.00 | $78.75 | $192 | $35.00 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 750 SY | $1.50 | $4.50 | $4.40 | $4.62 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $21,005 |
| $25,000 |
| 8% |
| 832E30000 EROSION CONTROL | 12,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 6% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 4,000 DLR | $3.00 | $7.00 | $7.00 | $7.00 | $3.00 | $7.00 | 6% |
| 517E72300 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 50 FT | $225 | $170 | $152 | $160 | $194 | $152 | 6% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (9 CY | $1,200 | $770 | $750 | $1,470 | $1,546 | $600 | 6% |
| 202E11501 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (BOX BE | 1 EACH | $10,000 | $21,800 | $12,030 | $16,398 | $17,389 | $15,000 | 5% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $7,500 | $2,900 | $2,000 | $3,150 | $3,134 | $2,000 | 4% |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 2 EACH | $3,300 | $2,840 | $2,580 | $2,709 | $3,327 | $2,580 | 4% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $3,000 | $1,050 | $950 | $998 | $1,191 | $950 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $2,865 | $5,000 | $2,632 | $3,009 | $3,500 | 3% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 3 CY | $1,550 | $820 | $750 | $3,360 | $2,067 | $1,600 | 2% |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $4,500 | $3,070 | $2,790 | $2,930 | $4,982 | $2,800 | 2% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 2 EACH | $2,200 | $1,100 | $985 | $1,034 | $1,328 | $985 | 2% |
| 512E33011 TYPE 3 WATERPROOFING, AS PER PLAN | 54 SY | $50.00 | $83.00 | $49.00 | $76.45 | $55.43 | $85.00 | 1% |
| 606E13000 GUARDRAIL, TYPE 5 | 50 FT | $40.00 | $59.00 | $29.60 | $31.08 | $40.81 | $29.60 | 1% |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 5 CY | $350 | $1,200 | $1,210 | $2,290 | $2,220 | $2,500 | 1% |
| 202E38000 GUARDRAIL REMOVED | 200 FT | $8.00 | $7.00 | $1.00 | $2.10 | $8.04 | $2.00 | 1% |
| 646E10010 EDGE LINE, 6" | 0.05 MILE | $30,000 | $83,000 | $88,875 | $93,319 | $111,415 | $88,875 | 1% |
| $2.74 |
| $2.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $500 | $762 | $1,500 | $714 | $1,504 | $420 |
| 659E31000 LIME | 0.16 ACRE | $500 | $700 | $2,900 | $52.50 | $313 | $190 |
| 659E35000 WATER | 4 MGAL | $1.00 | $5.60 | $1.00 | $1.05 | $1.00 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 63 FT | $13.00 | $15.00 | $2.00 | $15.83 | $11.77 | $16.00 |
| 407E20000 NON-TRACKING TACK COAT | 5 GAL | $5.00 | $7.00 | $8.00 | $2.89 | $25.07 | $7.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 BIDIRECTIONAL | 5 EACH | $12.00 | $12.00 | $15.00 | $25.88 | $18.80 | $15.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 10 CY | $50.00 | $175 | $250 | $150 | $42.00 | $50.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $50.00 | $400 | $250 | $506 | $200 | $200 |
| 616E10000 WATER | 3 MGAL | $1.00 | $15.00 | $1.00 | $12.00 | $1.00 | $1.00 |
| 202E11301 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (SUBSTR | 5 CY | $100 | $255 | $1,147 | $2,079 | $2,922 | $2,500 |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 272 LB | $5.50 | $9.00 | $6.50 | $9.65 | $5.12 | $10.00 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 20 EACH | $3.00 | $78.00 | $26.00 | $25.05 | $52.77 | $80.00 |
| 516E13601 1" PREFORMED EXPANSION JOINT FILLER, AS PER PLAN | 11 SF | $65.00 | $93.00 | $12.00 | $71.05 | $4.55 | $30.00 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 86 FT | $10.00 | $18.00 | $10.00 | $22.08 | $10.45 | $20.00 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 53 FT | $18.00 | $24.00 | $34.00 | $31.09 | $22.42 | $25.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E10030 PRESTRESSED CONCRETE NON-COMPOSITE BOX BEAM BRIDGE | 1 EACH | $51,000 | $51k | 26% |
| 624E10000 MOBILIZATION | 1 LS | $16,500 | $17k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $15k | 8% |
| 832E30000 EROSION CONTROL | 12,000 EACH | $1 | $12k | 6% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 4,000 DLR | $3 | $12k | 6% |
| 517E72300 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 50 FT | $225 | $11k | 6% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (9 CY | $1,200 | $11k | 6% |
| 202E11501 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN (BOX BE | 1 EACH | $10,000 | $10k | 5% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $7,500 | $8k | 4% |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 2 EACH | $3,300 | $7k | 3% |