LAK-US 6-00.44
LAK County · est $1.2M
Bid dateThursday, March 21—
LAK County · est $1.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 29 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Cole Burton Contractors, LLC | R3Karvo Companies INC | R4Phillips Paving LLC | R5Barbicas Construction Company INC | R6Shelly Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 441E10201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (1701 CY | $160 | $180 | $165 | $165 | $200 | $175 | 25% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 1,166 CY | $210 | $225 | $230 | $210 | $275 | $235 | 23% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 900 SY | $160 | $130 | $115 | $90.00 |
| Item | Quantity | R1Ronyak Paving INC | R2Cole Burton Contractors, LLC | R3Karvo Companies INC | R4Phillips Paving LLC | R5Barbicas Construction Company INC | R6Shelly Company |
|---|---|---|---|---|---|---|---|
| 690E98400 SPECIAL - PRE-CONSTRUCTION VIDEOGRAPHY | 1 LS | $1,250 | $1,232 | $1,100 | $1,650 | $3,200 | $5,000 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 2 EACH | $1,600 | $1,850 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $70.00 |
| $120 |
| 13% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 1,500 SY | $80.00 | $35.00 | $48.00 | $40.00 | $25.00 | $80.00 | 11% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 31,882 SY | $2.00 | $2.50 | $2.70 | $4.00 | $6.00 | $2.50 | 6% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $50,000 | $103,000 | $35,300 | $75,000 | $80,000 | $165,500 | 5% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 100 CY | $455 | $375 | $513 | $550 | $200 | $750 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $41,900 | $40,000 | $44,000 | $61,300 | $99,000 | $40,000 | 4% |
| 617E10100 COMPACTED AGGREGATE | 242 CY | $90.00 | $65.00 | $78.00 | $150 | $100 | $100 | 2% |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $100 | $85.00 | $90.00 | $100 | $100 | $100 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 7 EACH | $1,300 | $1,450 | $1,300 | $1,300 | $1,350 | $1,300 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,003 | $18,000 | $8,000 | $20,000 | $20,000 | $4,500 | 1% |
| 407E13900 TACK COAT, 702.13 | 2,234 GAL | $4.00 | $3.00 | $2.75 | $2.00 | $3.50 | $5.00 | 1% |
| 407E10000 TACK COAT | 1,597 GAL | $4.00 | $3.00 | $2.75 | $2.00 | $3.15 | $2.50 | 1% |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 2,040 LB | $3.00 | $1.70 | $1.10 | $3.00 | $2.00 | $3.50 | 1% |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 7.66 MILE | $795 | $800 | $800 | $800 | $800 | $800 | 1% |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 3.68 MILE | $1,500 | $1,500 | $2,600 | $1,100 | $1,100 | $1,100 | 1% |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 5 EACH | $1,100 | $800 | $800 | $1,250 | $900 | $1,400 | 1% |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 5 EACH | $1,050 | $1,075 | $1,330 | $1,500 | $700 | $1,400 | 0% |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 5 EACH | $1,000 | $1,200 | $1,200 | $1,500 | $1,100 | $1,400 | 0% |
| $1,400 |
| $2,800 |
| $1,500 |
| $1,600 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 1,000 LB | $5.00 | $2.50 | $3.31 | $3.00 | $1.75 | $2.50 |
| 204E10000 SUBGRADE COMPACTION | 120 SY | $1.00 | $1.00 | $0.23 | $1.00 | $0.50 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 20 CY | $45.00 | $30.00 | $55.00 | $50.00 | $50.00 | $30.00 |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 3.62 MILE | $500 | $2,100 | $430 | $750 | $2,000 | $3,000 |
| 304E20000 AGGREGATE BASE | 20 CY | $65.00 | $80.00 | $55.00 | $100 | $60.00 | $65.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 4 EACH | $750 | $800 | $775 | $1,250 | $150 | $1,000 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 3.83 MILE | $1,255 | $1,300 | $1,600 | $700 | $700 | $700 |
| 642E00200 LANE LINE, 4", TYPE 1 | 0.09 MILE | $900 | $900 | $1,630 | $800 | $800 | $800 |
| 642E00300 CENTER LINE, TYPE 1 | 1.84 MILE | $1,575 | $1,575 | $2,020 | $950 | $950 | $950 |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 344 FT | $0.76 | $1.00 | $2.60 | $2.00 | $2.00 | $2.00 |
| 642E00500 STOP LINE, TYPE 1 | 109 FT | $5.00 | $5.00 | $13.00 | $5.00 | $5.00 | $5.00 |
| 642E00620 CROSSWALK LINE, 12", TYPE 1 | 168 FT | $2.50 | $2.50 | $10.50 | $3.50 | $3.50 | $3.50 |
| 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 | 2,101 FT | $1.89 | $2.00 | $11.50 | $3.50 | $3.50 | $3.50 |
| 642E01100 SCHOOL SYMBOL MARKING, 72", TYPE 1 | 2 EACH | $277 | $277 | $300 | $300 | $300 | $300 |
| 642E01300 LANE ARROW, TYPE 1 | 13 EACH | $78.00 | $78.00 | $150 | $55.00 | $55.00 | $55.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $225 | $525 | $275 | $400 | $175 | $120 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $1,000 | $1,200 | $900 | $900 | $900 | $900 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.18 MILE | $1,200 | $1,200 | $1,890 | $900 | $900 | $900 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.09 MILE | $1,200 | $1,200 | $900 | $900 | $900 | $900 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.84 MILE | $1,250 | $1,250 | $26,100 | $1,100 | $1,100 | $1,100 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 3.83 MILE | $699 | $700 | $800 | $800 | $800 | $800 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 688 FT | $0.60 | $0.75 | $2.50 | $2.00 | $2.00 | $2.00 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 344 FT | $0.59 | $0.75 | $2.50 | $2.00 | $2.00 | $2.00 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 218 FT | $3.00 | $3.00 | $9.00 | $5.00 | $5.00 | $5.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 109 FT | $3.00 | $3.00 | $8.00 | $5.00 | $5.00 | $5.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,600 | $5,000 | $6,740 | $100 | $250 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E10201 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (1701 CY | $160 | $272k | 24% |
| 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS | 1,166 CY | $210 | $245k | 21% |
| 252E01001 FULL DEPTH RIGID PAVEMENT REMOVAL AND FLEXIBLE REP | 900 SY | $160 | $144k | 13% |
| 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN | 1,500 SY | $80 | $120k | 11% |
| 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, 3 | 31,882 SY | $2 | $64k | 6% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $50,000 | $50k | 4% |
| 253E02001 PAVEMENT REPAIR, AS PER PLAN | 100 CY | $455 | $46k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $41,900 | $42k | 4% |
| 617E10100 COMPACTED AGGREGATE | 242 CY | $90 | $22k | 2% |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $100 | $15k | 1% |