OTT-SR 51-03.85
OTT County · est $1.7M
Bid dateThursday, May 23—
OTT County · est $1.7M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 54 more items below.
| Item | Quantity | R1Great Lakes Demolition Company | R2R & I Construction INC | R3R G Zachrich Construction INC | R4Vernon Nagel INC | R5Miller Bros Const INC | R6Mosser Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 515E12070 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $19,500 | $25,100 | $20,000 | $24,000 | $23,800 | $27,800 | 21% |
| 526E30000 REINFORCED CONCRETE APPROACH SLABS (T=17") | 267 SY | $350 | $275 | $302 | $395 | $410 | $375 | 10% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 163 FT | $465 | $486 | $463 |
| Item | Quantity | R1Great Lakes Demolition Company | R2R & I Construction INC | R3R G Zachrich Construction INC | R4Vernon Nagel INC | R5Miller Bros Const INC | R6Mosser Construction INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $12,500 | $1,500 | $40,000 | $5,000 | $14,400 | $8,000 |
| 202E23000 PAVEMENT REMOVED | 534 SY | $12.00 | $7.00 | $14.00 | $15.00 | $14.00 | $15.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 156 FT | $20.00 | $2.00 | $15.00 | $16.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $463 |
| $486 |
| $486 |
| 8% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 1,330 FT | $50.00 | $40.00 | $24.91 | $40.00 | $33.00 | $35.00 | 7% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 71 CY | $900 | $1,000 | $1,100 | $1,000 | $1,200 | $1,330 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $53,000 | $60,000 | $30,000 | $40,000 | $40,000 | $40,000 | 6% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 36,615 LB | $1.30 | $1.75 | $1.50 | $1.50 | $1.45 | $1.50 | 5% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 89 CY | $500 | $900 | $825 | $600 | $890 | $1,075 | 5% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 86 CY | $500 | $900 | $600 | $500 | $600 | $565 | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 113 CY | $335 | $330 | $270 | $270 | $270 | $270 | 4% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 259 CY | $105 | $80.00 | $115 | $100 | $115 | $145 | 3% |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 45 CY | $500 | $900 | $800 | $800 | $1,140 | $1,350 | 2% |
| 203E20001 EMBANKMENT, AS PER PLAN | 381 CY | $55.00 | $50.00 | $30.00 | $25.00 | $72.00 | $80.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $10,000 | $17,000 | $15,000 | $12,000 | $16,706 | 2% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $18,500 | $100,000 | $113,000 | $110,000 | $115,000 | $125,000 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 37 CY | $480 | $350 | $435 | $435 | $435 | $435 | 2% |
| 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM | 34 CF | $485 | $600 | $603 | $605 | $605 | $603 | 2% |
| 203E10000 EXCAVATION | 805 CY | $20.00 | $10.00 | $17.00 | $14.00 | $37.00 | $20.00 | 2% |
| 526E90010 TYPE A INSTALLATION | 82 FT | $185 | $185 | $105 | $140 | $190 | $200 | 2% |
| 503E21100 UNCLASSIFIED EXCAVATION | 872 CY | $15.00 | $10.00 | $30.00 | $52.00 | $45.00 | $25.00 | 1% |
| $115 |
| $20.00 |
| 202E38000 GUARDRAIL REMOVED | 458 FT | $2.00 | $2.00 | $2.00 | $4.00 | $16.00 | $6.00 |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 30" | 144 FT | $60.00 | $50.00 | $28.00 | $30.00 | $55.00 | $35.00 |
| 202E75000 FENCE REMOVED | 27 FT | $10.00 | $5.00 | $3.00 | $15.00 | $34.00 | $7.00 |
| 203E20000 EMBANKMENT | 512 CY | $15.00 | $25.00 | $13.00 | $14.00 | $37.00 | $10.00 |
| 204E10000 SUBGRADE COMPACTION | 410 SY | $2.00 | $2.00 | $2.25 | $1.00 | $5.00 | $7.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 116 CY | $30.00 | $10.00 | $25.00 | $20.00 | $40.00 | $11.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 116 CY | $55.00 | $44.00 | $60.00 | $50.00 | $70.00 | $115 |
| 204E45000 PROOF ROLLING | 1 HOUR | $300 | $25.00 | $310 | $250 | $225 | $225 |
| 204E50000 GEOTEXTILE FABRIC | 347 SY | $5.00 | $5.00 | $1.50 | $2.25 | $2.50 | $3.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 275 FT | $23.00 | $23.00 | $22.40 | $22.40 | $23.00 | $23.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 2 EACH | $2,600 | $2,750 | $2,550 | $2,550 | $2,750 | $2,750 |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 4 EACH | $2,700 | $2,550 | $2,625 | $2,625 | $2,550 | $2,550 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $100 | $10.00 | $10.50 | $5.00 | $25.00 | $150 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 4 SY | $60.00 | $100 | $134 | $80.00 | $180 | $150 |
| 659E00300 TOPSOIL | 102 CY | $50.00 | $25.00 | $40.00 | $25.00 | $65.00 | $40.00 |
| 659E10000 SEEDING AND MULCHING | 918 SY | $2.00 | $4.00 | $3.60 | $3.60 | $3.60 | $3.60 |
| 659E14000 REPAIR SEEDING AND MULCHING | 46 SY | $1.00 | $1.00 | $3.60 | $3.60 | $3.60 | $3.60 |
| 659E15000 INTER-SEEDING | 46 SY | $1.00 | $0.50 | $3.00 | $3.00 | $3.00 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $800 | $1,000 | $850 | $850 | $850 | $850 |
| 659E31000 LIME | 0.19 ACRE | $1,000 | $10.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1 CY | $1,500 | $1,500 | $1,907 | $3,000 | $2,500 | $2,300 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 198 FT | $10.00 | $15.00 | $20.00 | $16.00 | $34.00 | $13.00 |
| 611E01500 6" CONDUIT, TYPE F | 103 FT | $15.00 | $15.00 | $6.00 | $30.00 | $35.00 | $19.00 |
| 611E04600 12" CONDUIT, TYPE C | 146 FT | $50.00 | $35.00 | $80.00 | $62.00 | $78.00 | $95.00 |
| 611E13600 30" CONDUIT, TYPE C | 148 FT | $80.00 | $65.00 | $140 | $110 | $152 | $170 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $4,350 | $3,000 | $5,000 | $6,500 | $4,300 | $7,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $200 | $225 | $400 | $250 | $390 | $300 |
| 304E20000 AGGREGATE BASE | 152 CY | $55.00 | $50.00 | $69.00 | $65.00 | $98.00 | $120 |
| 407E10000 TACK COAT | 69 GAL | $4.00 | $5.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 9 SNMT | $950 | $950 | $950 | $950 | $950 | $950 |
| 616E10000 WATER | 4 MGAL | $1.00 | $1.00 | $10.00 | $1.00 | $200 | $10.00 |
| 202E22900 APPROACH SLAB REMOVED | 157 SY | $50.00 | $20.00 | $50.00 | $45.00 | $45.00 | $70.00 |
| 202E23500 WEARING COURSE REMOVED | 570 SY | $15.00 | $10.00 | $7.00 | $12.00 | $9.00 | $6.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $6,500 | $500 | $4,000 | $20,000 | $10,000 | $100 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $10,000 | $15,000 | $17,000 | $25,000 | $22,000 | $28,000 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 1,140 FT | $10.00 | $5.00 | $38.50 | $8.00 | $21.00 | $14.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 217 SY | $40.00 | $35.00 | $25.00 | $28.00 | $50.00 | $35.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 3 SF | $20.00 | $4.00 | $9.03 | $10.00 | $40.00 | $50.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 30 SF | $20.00 | $5.00 | $10.94 | $12.00 | $10.00 | $14.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 88 FT | $25.00 | $25.00 | $42.84 | $38.00 | $32.00 | $60.00 |
| 516E41100 1/8" PREFORMED BEARING PAD, TYPE CDP | 20 EACH | $40.00 | $5.00 | $32.41 | $32.00 | $30.00 | $35.00 |
| 516E43100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 40 EACH | $100 | $100 | $145 | $120 | $125 | $170 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 104 CY | $60.00 | $70.00 | $115 | $80.00 | $140 | $110 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 186 FT | $12.00 | $12.00 | $18.95 | $15.00 | $13.00 | $30.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 112 FT | $12.00 | $10.00 | $10.00 | $12.00 | $12.00 | $13.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 48 FT | $12.00 | $10.00 | $8.00 | $12.00 | $28.00 | $13.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,000 | $16,000 | $19,700 | $20,000 | $7,650 | $10,500 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,500 | $4,500 | $16,000 | $4,000 | $5,000 | $4,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,200 | $600 | $1,000 | $1,200 | $2,000 | $2,908 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12070 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $19,500 | $195k | 17% |
| 526E30000 REINFORCED CONCRETE APPROACH SLABS (T=17") | 267 SY | $350 | $93k | 8% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 163 FT | $465 | $76k | 7% |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 1,330 FT | $50 | $67k | 6% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 71 CY | $900 | $64k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $53,000 | $53k | 5% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 36,615 LB | $1.3 | $48k | 4% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 89 CY | $500 | $45k | 4% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 86 CY | $500 | $43k | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 113 CY | $335 | $38k | 3% |