MRG-SR 376-14.59
MRG County · est $0.3M
Bid dateThursday, July 25—
MRG County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 25 more items below.
| Item | Quantity | R1Parker Corporation | R2R C Construction Company And Son INC | R3Buds INC | R4Alan Stone CO INC | R5Axis Civil Construction LLC | R6Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E94901 8' X 5' CONDUIT, TYPE A, 706.05, AS PER PLAN | 52 FT | $1,255 | $800 | $1,983 | $1,400 | $1,450 | $1,135 | 21% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 26 CY | $1,050 | $750 | $1,200 | $820 | $850 | $1,050 | 9% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 67 CY | $381 | $450 | $385 | $380 |
| Item | Quantity | R1Parker Corporation | R2R C Construction Company And Son INC | R3Buds INC | R4Alan Stone CO INC | R5Axis Civil Construction LLC | R6Eclipse CO LLC |
|---|---|---|---|---|---|---|---|
| 202E75000 FENCE REMOVED | 308 FT | $2.00 | $15.00 | $5.00 | $3.50 | $5.75 | $5.00 |
| 202E98100 REMOVAL MISC.: HALF HEIGHT CONCRETE HEADWALL | 2 EACH | $1,000 | $1,500 | $1,525 | $1,400 | $1,400 | $617 |
| 203E20000 EMBANKMENT | 94 CY | $20.00 | $25.00 | $45.00 | $40.00 | $35.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $425 |
| $384 |
| 8% |
| 624E10000 MOBILIZATION | 1 LS | $25,500 | $20,000 | $16,000 | $16,000 | $30,000 | $41,522 | 8% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 9 CY | $1,950 | $750 | $2,500 | $2,800 | $2,200 | $3,029 | 6% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $17,500 | $15,000 | $6,500 | $5,000 | $4,000 | $9,500 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $17,500 | $25,000 | $4,500 | $7,100 | $7,500 | $15,000 | 6% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $17,500 | $12,000 | $8,000 | $7,700 | $7,500 | $9,000 | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $16,500 | $3,500 | $5,000 | $15,000 | $7,500 | $8,000 | 5% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $15,500 | $12,500 | $10,000 | $5,800 | $15,000 | $5,000 | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 35 CY | $409 | $400 | $409 | $430 | $390 | $413 | 5% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 63 CY | $150 | $195 | $170 | $220 | $195 | $218 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 312.5 FT | $24.00 | $28.00 | $24.00 | $30.00 | $24.00 | $25.05 | 2% |
| 203E10000 EXCAVATION | 325 CY | $20.00 | $25.00 | $25.00 | $35.00 | $35.00 | $46.00 | 2% |
| 202E35200 PIPE REMOVED, OVER 24" | 55 FT | $110 | $200 | $200 | $85.00 | $185 | $96.00 | 2% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 4,123 LB | $1.25 | $3.00 | $1.75 | $4.00 | $4.00 | $7.00 | 2% |
| 623E40500 REFERENCE MONUMENT, TYPE A | 7 EACH | $700 | $750 | $950 | $320 | $375 | $826 | 2% |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 3 EACH | $1,600 | $1,700 | $1,600 | $2,100 | $1,600 | $1,743 | 2% |
| 304E20000 AGGREGATE BASE | 72 CY | $65.00 | $125 | $107 | $130 | $165 | $105 | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 43 CY | $65.00 | $150 | $115 | $150 | $125 | $125 | 1% |
| $45.00 |
| 204E10000 SUBGRADE COMPACTION | 225 SY | $0.50 | $2.00 | $5.00 | $15.00 | $3.00 | $1.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,200 | $1,800 | $1,200 | $1,500 | $1,200 | $1,500 |
| 601E32300 ROCK CHANNEL PROTECTION, TYPE D WITH FILTER | 41 CY | $65.00 | $150 | $115 | $120 | $125 | $131 |
| 659E10000 SEEDING AND MULCHING | 1,359 SY | $1.00 | $5.00 | $2.00 | $3.50 | $2.30 | $2.33 |
| 659E20000 COMMERCIAL FERTILIZER | 0.13 TON | $1,924 | $1,900 | $600 | $1,100 | $1,250 | $1,263 |
| 659E31000 LIME | 0.29 ACRE | $863 | $1,500 | $300 | $1,100 | $200 | $202 |
| 659E35000 WATER | 4 MGAL | $0.05 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $100 | $12,500 | $4,500 | $12,000 | $8,500 | $12,000 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $1,950 | $750 | $3,000 | $5,400 | $2,000 | $3,760 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 42 SY | $12.00 | $50.00 | $25.00 | $55.00 | $65.00 | $30.00 |
| 512E33000 TYPE 2 WATERPROOFING | 136 SY | $14.00 | $35.00 | $19.00 | $35.00 | $35.00 | $29.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 26 SF | $5.00 | $50.00 | $12.00 | $2.00 | $10.00 | $5.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 11 CY | $110 | $150 | $150 | $330 | $275 | $140 |
| 605E31100 AGGREGATE DRAINS | 32 FT | $10.00 | $25.00 | $35.00 | $50.00 | $65.00 | $32.00 |
| 407E20000 NON-TRACKING TACK COAT | 116 GAL | $4.50 | $25.00 | $4.00 | $20.00 | $5.00 | $4.05 |
| 408E10000 PRIME COAT | 48 GAL | $51.50 | $25.00 | $1.60 | $35.00 | $15.00 | $52.00 |
| 617E10100 COMPACTED AGGREGATE | 5 CY | $65.00 | $150 | $150 | $550 | $365 | $176 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 8 EACH | $20.00 | $50.00 | $5.00 | $30.00 | $40.00 | $11.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 9 EACH | $10.00 | $25.00 | $8.00 | $15.00 | $10.00 | $16.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.12 MILE | $7,550 | $8,500 | $7,600 | $9,700 | $7,550 | $7,700 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $14,250 | $15,000 | $14,500 | $18,000 | $14,250 | $14,400 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E94901 8' X 5' CONDUIT, TYPE A, 706.05, AS PER PLAN | 52 FT | $1,255 | $65k | 19% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 26 CY | $1,050 | $27k | 8% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 67 CY | $381 | $26k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $25,500 | $26k | 8% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 9 CY | $1,950 | $18k | 5% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $17,500 | $18k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $17,500 | $18k | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $17,500 | $18k | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $16,500 | $17k | 5% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $15,500 | $16k | 5% |