WAS-SR 339-08.64
WAS County · est $0.9M
Bid dateThursday, October 17—
WAS County · est $0.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Buds INC | R2R C Construction Company And Son INC | R3Parker Corporation | R4Eclipse CO LLC | R5Axis Civil Construction LLC | R6Ohio-west Virginia Excavating CO | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E96485 18' X 10' CONDUIT, TYPE A, 706.05, AS PER PLAN, DE | 96 FT | $3,100 | $2,100 | $2,800 | $2,300 | $3,290 | $3,200 | 40% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 66.3 CY | $865 | $750 | $750 | $646 | $690 | $965 | 8% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $52,000 | $12,500 | $1,000 | $36,836 |
| Item | Quantity | R1Buds INC | R2R C Construction Company And Son INC | R3Parker Corporation | R4Eclipse CO LLC | R5Axis Civil Construction LLC | R6Ohio-west Virginia Excavating CO |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,500 | $2,500 | $10,000 | $4,500 | $22,000 | $7,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 15 FT | $55.00 | $50.00 | $20.00 | $17.00 | $45.00 | $100 |
| 202E35200 PIPE REMOVED, OVER 24" | 101 FT | $75.00 | $50.00 | $50.00 | $20.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $10,000 |
| $2,900 |
| 7% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL | 320 CY | $116 | $205 | $200 | $152 | $180 | $185 | 5% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 286 SY | $108 | $175 | $100 | $147 | $110 | $108 | 4% |
| 601E32001 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER, AS PE | 243 CY | $105 | $150 | $150 | $117 | $180 | $138 | 3% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $25,000 | $15,000 | $30,000 | $5,791 | $35,000 | $11,000 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $15,000 | $15,000 | $45,879 | $50,000 | $92,587 | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 24.4 CY | $1,000 | $750 | $1,000 | $2,230 | $1,600 | $2,205 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,032 FT | $22.00 | $25.00 | $25.00 | $48.00 | $35.00 | $29.00 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, | 38 CY | $580 | $450 | $600 | $898 | $500 | $490 | 3% |
| 611E19600 42" CONDUIT, TYPE C, 707.33 | 110 FT | $168 | $200 | $125 | $201 | $250 | $245 | 3% |
| 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER | 131 SY | $128 | $175 | $100 | $164 | $155 | $136 | 2% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $15,000 | $35,000 | $30,000 | $145,000 | $70,000 | $148,000 | 2% |
| 203E20000 EMBANKMENT | 414 CY | $35.00 | $25.00 | $20.00 | $38.00 | $30.00 | $51.00 | 2% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS, | 6 EACH | $2,100 | $2,500 | $3,000 | $2,235 | $2,500 | $2,800 | 2% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 7,917 LB | $1.49 | $3.00 | $3.00 | $6.00 | $2.50 | $4.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,000 | $35,000 | $20,000 | $16,000 | $8,500 | $15,000 | 1% |
| 512E33000 TYPE 2 WATERPROOFING | 484 SY | $18.75 | $35.00 | $25.00 | $27.00 | $22.00 | $85.00 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 312.5 FT | $28.00 | $30.00 | $30.00 | $30.00 | $28.00 | $28.00 | 1% |
| $65.00 |
| $48.00 |
| 202E38000 GUARDRAIL REMOVED | 497 FT | $2.50 | $5.00 | $5.00 | $5.00 | $5.00 | $2.00 |
| 203E10000 EXCAVATION | 203 CY | $30.00 | $25.00 | $20.00 | $38.00 | $44.00 | $43.00 |
| 204E10000 SUBGRADE COMPACTION | 331 SY | $5.00 | $2.00 | $1.00 | $1.00 | $3.00 | $5.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,250 | $1,200 | $2,000 | $1,100 | $1,250 | $2,000 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $200 | $175 | $300 | $158 | $200 | $230 |
| 659E10000 SEEDING AND MULCHING | 1,227 SY | $1.50 | $10.00 | $2.00 | $3.00 | $2.80 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $800 | $1,850 | $4,546 | $1,316 | $1,250 | $1,500 |
| 659E31000 LIME | 0.25 ACRE | $500 | $950 | $2,000 | $158 | $150 | $160 |
| 659E35000 WATER | 4 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 3,500 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E10600 24" CONDUIT, TYPE C, 707.33 | 15 FT | $200 | $125 | $60.00 | $143 | $200 | $245 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" AVG DEPTH | 302 SY | $25.00 | $30.00 | $20.00 | $44.00 | $30.00 | $19.00 |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, | 44 CY | $95.00 | $295 | $500 | $794 | $440 | $485 |
| 304E20000 AGGREGATE BASE | 54 CY | $110 | $125 | $150 | $119 | $170 | $170 |
| 407E20000 NON-TRACKING TACK COAT | 55 GAL | $4.00 | $10.00 | $10.00 | $4.00 | $5.00 | $20.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 21 EACH | $5.00 | $50.00 | $25.00 | $11.00 | $20.00 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 7 EACH | $75.00 | $200 | $100 | $53.00 | $75.00 | $84.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 5 EACH | $250 | $200 | $100 | $53.00 | $250 | $200 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.26 MILE | $4,500 | $5,500 | $9,616 | $9,604 | $3,000 | $3,050 |
| 642E00300 CENTER LINE, TYPE 1 | 0.13 MILE | $9,500 | $6,500 | $19,231 | $13,224 | $5,400 | $5,450 |
| 642E00500 STOP LINE, TYPE 1 | 15 FT | $30.00 | $50.00 | $50.00 | $91.00 | $10.00 | $13.00 |
| 614E12440 WORK ZONE SIGN SUPPORT | 1 EACH | $3,500 | $250 | $500 | $105 | $240 | $105 |
| 614E13310 BARRIER REFLECTOR, TYPE | 33 EACH | $12.00 | $25.00 | $20.00 | $13.00 | $20.00 | $26.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 33 EACH | $17.00 | $30.00 | $20.00 | $19.00 | $28.00 | $30.00 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.42 MILE | $5,000 | $8,500 | $3,575 | $13,287 | $7,800 | $10,075 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 12 FT | $35.00 | $50.00 | $25.00 | $91.00 | $14.00 | $15.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $8,000 | $9,500 | $10,000 | $7,196 | $15,000 | $3,500 |
| 622E41110 PORTABLE BARRIER, ANCHORED | 192 FT | $35.00 | $30.00 | $50.00 | $55.00 | $55.00 | $42.00 |
| 630E80100 SIGN, FLAT SHEET | 4 SF | $25.00 | $175 | $50.00 | $18.00 | $30.00 | $31.00 |
| 503E21320 UNCLASSIFIED EXCAVATION, INCLUDING ROCK | 1 LS | $7,500 | $10,000 | $20,000 | $6,497 | $50,000 | $160,600 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1.9 CY | $2,000 | $750 | $1,000 | $2,438 | $1,450 | $5,860 |
| 512E10050 SEALING OF CONCRETE SURFACES | 119 SY | $15.00 | $65.00 | $20.00 | $17.00 | $32.00 | $27.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 65 SF | $15.00 | $50.00 | $10.00 | $6.00 | $8.00 | $10.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 26 CY | $165 | $150 | $77.00 | $96.00 | $230 | $411 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,500 | $45,000 | $50,000 | $35,355 | $70,000 | $73,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $15,000 | $20,000 | $11,029 | $12,500 | $6,600 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96485 18' X 10' CONDUIT, TYPE A, 706.05, AS PER PLAN, DE | 96 FT | $3,100 | $298k | 35% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 66.3 CY | $865 | $57k | 7% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $52,000 | $52k | 6% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL | 320 CY | $116 | $37k | 4% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 286 SY | $108 | $31k | 4% |
| 601E32001 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER, AS PE | 243 CY | $105 | $26k | 3% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $25,000 | $25k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $25k | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 24.4 CY | $1,000 | $24k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,032 FT | $22 | $23k | 3% |