HAM-Culverts FY25
HAM County · est $0.3M
Bid dateThursday, November 14—
HAM County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 18 more items below.
| Item | Quantity | R1Rack & Ballauer Excavating CO INC | R2Kt Holden Construction LLC | R3Barrett Paving Materials INC | R4John R Jurgensen Company | R5Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $34,975 | $115,000 | $191,028 | $37,145 | 14% |
| 203E20000 EMBANKMENT | 500 CY | $88.00 | $125 | $80.00 | $131 | $240 | 11% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 54" CMP | 284 FT | $135 | $140 | $150 | $279 | $293 | 9% |
| 602E20000 CONCRETE MASONRY | 11.34 CY | $2,765 | $1,920 | $6,950 | $3,181 | $3,186 | 8% |
| 611E99574 MANHOLE, NO. 3 WITH 84" BASE I.D. | 1 EACH | $30,600 | $35,000 | $25,000 | $25,698 | $27,639 | 7% |
| 624E10000 MOBILIZATION | 1 LS |
| Item | Quantity | R1Rack & Ballauer Excavating CO INC | R2Kt Holden Construction LLC | R3Barrett Paving Materials INC | R4John R Jurgensen Company | R5Sunesis Construction CO |
|---|---|---|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 101 FT | $30.00 | $30.00 | $75.00 | $67.71 | $92.76 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $1,550 | $1,200 | $500 | $1,744 | $761 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $500 | $6,900 | $20,000 | $10,978 | $50,266 |
| 503E11101 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $30,000 |
| $12,500 |
| $20,000 |
| $20,000 |
| $58,725 |
| 7% |
| 659E00300 TOPSOIL | 365 CY | $75.00 | $30.00 | $80.00 | $25.15 | $77.48 | 7% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 600 FT | $40.00 | $40.00 | $39.34 | $43.51 | $52.45 | 6% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $21,000 | $60,000 | $95,000 | $50,431 | $49,500 | 5% |
| 899E10000 CURED-IN-PLACE PIPE LINER, 18" | 65 FT | $305 | $210 | $185 | $493 | $419 | 5% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $21,450 | $30,000 | $8,705 | $4,800 | 4% |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $6,350 | $3,800 | $6,500 | $4,194 | $8,108 | 3% |
| 611E22200 54" CONDUIT, TYPE A, 706.02, 707.33, 707.65 | 25 FT | $465 | $720 | $1,000 | $1,238 | $1,039 | 3% |
| 659E10000 SEEDING AND MULCHING | 3,291 SY | $3.00 | $1.75 | $2.80 | $2.80 | $10.35 | 2% |
| 611E08200 18" CONDUIT, TYPE F, 707.05 TYPE C, 707.21, OR 707 | 106 FT | $88.00 | $145 | $215 | $266 | $103 | 2% |
| 611E98300 CATCH BASIN, NO. 5 | 1 EACH | $7,800 | $9,000 | $13,000 | $7,257 | $8,390 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $9,800 | $9,846 | $7,003 | $5,755 | 1% |
| 611E06700 15" CONDUIT, TYPE F, 707.05 TYPE C, 707.21, OR 707 | 71 FT | $83.00 | $180 | $190 | $294 | $126 | 1% |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 284 FT | $20.00 | $52.00 | $100 | $117 | $44.49 | 1% |
| 202E20010 HEADWALL REMOVED | 4 EACH | $1,250 | $650 | $500 | $2,897 | $532 | 1% |
| 1 LS |
| $500 |
| $15,000 |
| $15,000 |
| $17,013 |
| $48,443 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 19.1 CY | $250 | $240 | $215 | $736 | $7,599 |
| 659E20000 COMMERCIAL FERTILIZER | 0.44 TON | $1,150 | $1,500 | $925 | $925 | $925 |
| 659E31000 LIME | 0.68 ACRE | $250 | $200 | $75.00 | $75.00 | $75.00 |
| 659E35000 WATER | 17.8 MGAL | $1.00 | $1.00 | $10.00 | $10.00 | $10.00 |
| 670E00500 SLOPE EROSION PROTECTION | 247 SY | $4.00 | $20.00 | $3.95 | $3.95 | $3.95 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E04600 12" CONDUIT, TYPE C, 707.33 | 5 FT | $190 | $1,800 | $3,275 | $1,639 | $3,102 |
| 611E05900 15" CONDUIT, TYPE B, 706.02 | 4 FT | $350 | $315 | $340 | $1,189 | $1,126 |
| 611E07400 18" CONDUIT, TYPE B, 706.02 | 4 FT | $353 | $325 | $365 | $964 | $2,050 |
| 611E98644 CATCH BASIN GRATE | 1 EACH | $950 | $980 | $825 | $1,485 | $1,759 |
| 614E12390 WORK ZONE IMPACT ATTENUATOR, OVER 24" AND LESS THA | 2 EACH | $2,250 | $2,250 | $2,230 | $2,230 | $2,230 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 12 EACH | $12.00 | $12.00 | $11.89 | $11.89 | $11.89 |
| 614E13350 OBJECT MARKER, ONE WAY | 12 EACH | $20.00 | $20.00 | $19.94 | $19.94 | $19.94 |
| 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 200 FT | $2.35 | $2.35 | $2.31 | $2.31 | $15.50 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $60k | 14% |
| 203E20000 EMBANKMENT | 500 CY | $88 | $44k | 10% |
| 611E96550 FIELD PAVING OF EXISTING PIPE, 54" CMP | 284 FT | $135 | $38k | 9% |
| 602E20000 CONCRETE MASONRY | 11.34 CY | $2,765 | $31k | 7% |
| 611E99574 MANHOLE, NO. 3 WITH 84" BASE I.D. | 1 EACH | $30,600 | $31k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $30k | 7% |
| 659E00300 TOPSOIL | 365 CY | $75 | $27k | 6% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 600 FT | $40 | $24k | 5% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $21,000 | $21k | 5% |
| 899E10000 CURED-IN-PLACE PIPE LINER, 18" | 65 FT | $305 | $20k | 4% |