SUM-SR 82-00.14/08.04
SUM County · est $3.0M
Bid dateThursday, November 14—
SUM County · est $3.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 58 more items below.
| Item | Quantity | R1Ronyak Paving INC | R2Shelly Company | R3Barbicas Construction Company INC | R4Karvo Companies INC | R5Kokosing Construction Company INC | % of bid |
|---|---|---|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 5,550 CY | $205 | $215 | $230 | $225 | $238 | 45% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1732 CY | $175 | $165 | $226 | $195 | $203 | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $200,000 | $340,000 | $100,000 | $225,882 | $231,000 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $132,600 | $100,000 | $100,000 | $109,366 | $153,000 | 5% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,700 SY | $70.00 | $39.60 | $38.00 | $65.00 | $60.00 | 5% |
| 254E01000 |
| Item | Quantity | R1Ronyak Paving INC | R2Shelly Company | R3Barbicas Construction Company INC | R4Karvo Companies INC | R5Kokosing Construction Company INC |
|---|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 1,177 SF | $5.00 | $7.00 | $5.00 | $8.00 | $5.50 |
| 202E32000 CURB REMOVED | 129 FT | $25.00 | $19.00 | $10.00 | $50.00 | $16.00 |
| 203E10000 EXCAVATION | 59 CY | $35.00 | $50.00 | $25.00 | $10.00 | $35.00 |
| 209E60200 LINEAR GRADING | 510 STA | $18.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 91,619 SY |
| $1.00 |
| $1.80 |
| $3.00 |
| $2.35 |
| $1.50 |
| 4% |
| 253E01000 PAVEMENT REPAIR | 350 SY | $235 | $165 | $110 | $125 | $245 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 2.5") | 49,456 SY | $1.50 | $1.70 | $3.20 | $3.14 | $1.95 | 3% |
| 407E20000 NON-TRACKING TACK COAT | 20,520 GAL | $3.00 | $2.75 | $3.20 | $2.75 | $2.50 | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 698 CY | $80.00 | $90.00 | $60.00 | $75.00 | $40.00 | 2% |
| 646E10010 EDGE LINE, 6" | 11.05 MILE | $3,260 | $3,260 | $3,260 | $3,260 | $3,260 | 1% |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 20 EACH | $1,690 | $1,950 | $1,600 | $1,750 | $1,725 | 1% |
| 608E52000 CURB RAMP | 1,142 SF | $28.00 | $36.00 | $35.00 | $18.00 | $23.00 | 1% |
| 632E26501 DETECTOR LOOP, AS PER PLAN | 18 EACH | $1,400 | $1,400 | $1,500 | $1,400 | $1,400 | 1% |
| 408E10001 PRIME COAT, AS PER PLAN | 2,485 GAL | $10.00 | $6.00 | $5.00 | $5.50 | $6.00 | 1% |
| 621E00100 RPM | 591 EACH | $41.00 | $41.00 | $41.00 | $43.50 | $41.00 | 1% |
| 646E10200 CENTER LINE | 5.85 MILE | $3,845 | $3,845 | $3,845 | $3,845 | $3,845 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $17,825 | $15,000 | $30,000 | $15,000 | $14,000 | 1% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 16 SNMT | $900 | $900 | $1,200 | $900 | $900 | 1% |
| 659E10000 SEEDING AND MULCHING | 14,170 SY | $0.90 | $0.95 | $0.25 | $0.50 | $1.15 | 1% |
| $63.00 |
| $15.00 |
| $50.00 |
| $60.00 |
| 209E72000 PREPARING SUBGRADE FOR SHOULDER PAVING (SAFETY EDG | 566 STA | $18.00 | $30.00 | $13.00 | $30.00 | $45.00 |
| 608E10000 4" CONCRETE WALK | 103 SF | $28.00 | $21.00 | $20.00 | $15.00 | $23.00 |
| 609E26000 CURB, TYPE 6 | 125 FT | $45.00 | $55.00 | $45.00 | $45.00 | $35.00 |
| 623E39501 MONUMENT ASSEMBLY ADJUSTED TO GRADE, AS PER PLAN | 8 EACH | $850 | $1,500 | $1,500 | $1,750 | $1,595 |
| 654E11000 COMMERCIAL FERTILIZER | 1.9 TON | $950 | $950 | $100 | $949 | $250 |
| 659E31000 LIME | 2.93 ACRE | $150 | $155 | $75.00 | $25.00 | $25.00 |
| 659E35000 WATER | 76.5 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $0.25 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 6 EACH | $1,400 | $1,400 | $1,300 | $2,500 | $1,200 |
| 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE | 3 EACH | $2,000 | $1,800 | $1,800 | $3,500 | $1,700 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 350 LB | $4.00 | $5.00 | $3.00 | $5.00 | $4.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 2,100 FT | $2.00 | $4.00 | $5.00 | $0.25 | $3.00 |
| 304E20000 AGGREGATE BASE | 59 CY | $53.00 | $55.00 | $60.00 | $25.00 | $160 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 5 EACH | $850 | $1,200 | $1,200 | $1,250 | $1,065 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 473 EACH | $1.00 | $8.00 | $6.00 | $1.00 | $2.50 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 37 FT | $25.00 | $25.00 | $40.00 | $38.00 | $25.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $30.00 | $30.00 | $40.00 | $42.00 | $30.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 4 SF | $30.00 | $30.00 | $45.00 | $45.00 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $25.00 | $25.00 | $10.00 | $10.00 | $25.00 |
| 646E10110 LANE LINE, 6" | 0.44 MILE | $1,900 | $1,900 | $1,900 | $1,900 | $1,900 |
| 646E10310 CHANNELIZING LINE, 12" | 5,344 FT | $1.65 | $1.65 | $1.65 | $1.65 | $1.65 |
| 646E10400 STOP LINE | 524 FT | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| 646E10520 CROSSWALK LINE, 24" | 834 FT | $13.00 | $13.00 | $13.00 | $13.00 | $13.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 125 FT | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| 646E10800 ISLAND MARKING | 340 SF | $8.00 | $8.00 | $8.00 | $8.00 | $8.00 |
| 646E20000 RAILROAD SYMBOL MARKING | 2 EACH | $600 | $600 | $600 | $600 | $600 |
| 646E20110 SCHOOL SYMBOL MARKING, 96" | 2 EACH | $600 | $600 | $600 | $600 | $600 |
| 646E20300 LANE ARROW | 79 EACH | $155 | $155 | $155 | $155 | $155 |
| 646E20370 TWO WAY LEFT TURN ARROW | 4 EACH | $155 | $155 | $155 | $155 | $155 |
| 646E20504 DOTTED LINE, 6" | 75 FT | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 646E98000 PAVEMENT MARKING, MISC.: WHITE TRIANGLE MARKING | 1 EACH | $600 | $600 | $600 | $600 | $600 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $100 | $100 | $80.00 | $100 | $108 |
| 614E12460 WORK ZONE MARKING SIGN | 10 EACH | $65.00 | $65.00 | $75.00 | $100 | $65.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $250 | $120 | $200 | $290 | $1,600 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 0.44 MILE | $1,100 | $1,100 | $1,100 | $1,100 | $1,100 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.44 MILE | $1,100 | $1,100 | $1,100 | $1,100 | $1,100 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 8.37 MILE | $1,100 | $1,100 | $1,100 | $1,100 | $1,100 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 5.85 MILE | $900 | $900 | $900 | $900 | $900 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 11.05 MILE | $675 | $675 | $675 | $675 | $600 |
| 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI | 6,217 FT | $0.62 | $0.65 | $0.62 | $0.62 | $0.62 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 5,344 FT | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 746 FT | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 524 FT | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $2,500 | $3,000 | $1,500 | $3,000 | $500 |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN (T=3") | 25 SY | $330 | $400 | $100 | $8.00 | $100 |
| 407E13900 TACK COAT, 702.13 @ 0.09 GAL/SY | 8 GAL | $25.00 | $5.00 | $3.50 | $2.75 | $2.50 |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 2 CY | $4,500 | $3,200 | $2,500 | $350 | $1,500 |
| 512E74500 REMOVAL OF EXISTING PAVEMENT MARKING | 48 FT | $11.00 | $30.00 | $11.00 | $11.00 | $50.00 |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN, AROUND BRIDGES | 1 LS | $2,500 | $3,000 | $1,500 | $3,000 | $500 |
| 202E23501 WEARING COURSE REMOVED, AS PER PLAN (T=3") | 11 SY | $650 | $450 | $100 | $8.00 | $100 |
| 407E13900 TACK COAT, 702.13 @ 0.09 GAL/SY | 4 GAL | $25.00 | $5.00 | $3.50 | $2.75 | $2.50 |
| 441E70101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), AS | 1 CY | $8,000 | $3,200 | $2,500 | $350 | $2,500 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,500 | $2,500 | $750 | $2,500 | $2,750 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,501 | $5,000 | $350 | $4,000 | $3,880 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 5,550 CY | $205 | $1.14M | 42% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (1732 CY | $175 | $303k | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $200,000 | $200k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $132,600 | $133k | 5% |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 1,700 SY | $70 | $119k | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 1.5") | 91,619 SY | $1 | $92k | 3% |
| 253E01000 PAVEMENT REPAIR | 350 SY | $235 | $82k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T = 2.5") | 49,456 SY | $1.5 | $74k | 3% |
| 407E20000 NON-TRACKING TACK COAT | 20,520 GAL | $3 | $62k | 2% |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 698 CY | $80 | $56k | 2% |