DEL-SR 521-10.32 and Various
DEL County · est $3.1M
Bid dateThursday, January 16—
DEL County · est $3.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 96 more items below.
| Item | Quantity | R1Miller Bros Const INC | R2Buds INC | R3Shelly & Sands INC | R4Double Z Construction Company | R5E S Wagner Company | R6Complete General Construction Company | R7Ruhlin Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 72 FT | $3,700 | $4,800 | $4,100 | $4,400 | $4,400 | $4,300 | $8,000 | 14% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 313 CY | $500 | $725 | $550 | $410 | $388 | $600 | $425 | 8% |
| 301E56000 |
| Item | Quantity | R1Miller Bros Const INC | R2Buds INC | R3Shelly & Sands INC | R4Double Z Construction Company | R5E S Wagner Company | R6Complete General Construction Company | R7Ruhlin Company |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $6,500 | $16,000 | $25,000 | $20,000 | $10,000 | $30,000 |
| 202E23000 PAVEMENT REMOVED | 2,032 SY | $9.00 | $30.00 | $17.00 | $35.00 | $30.00 | $25.00 | $50.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 161 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 734 CY |
| $192 |
| $192 |
| $195 |
| $195 |
| $195 |
| $198 |
| $268 |
| 8% |
| 513E10261 STRUCTURAL STEEL MEMBERS, LEVEL 3, AS PER PLAN | 48,000 LB | $2.75 | $2.75 | $2.90 | $3.00 | $2.90 | $2.91 | $3.20 | 7% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 105 CY | $1,245 | $1,250 | $1,350 | $1,300 | $1,400 | $1,500 | $1,000 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $128,000 | $85,000 | $131,562 | $100,000 | $100,000 | $100,000 | $175,000 | 7% |
| 611E94936 9' X 4' CONDUIT, TYPE A, 706.05 | 84 FT | $1,250 | $1,400 | $1,210 | $1,225 | $1,360 | $1,700 | $1,650 | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 356 CY | $278 | $278 | $270 | $270 | $270 | $291 | $365 | 5% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 853 CY | $98.00 | $90.00 | $92.00 | $110 | $135 | $125 | $165 | 4% |
| 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER | 178 SY | $410 | $410 | $325 | $425 | $370 | $400 | $325 | 4% |
| 203E20000 EMBANKMENT | 3,583 CY | $20.00 | $25.00 | $21.00 | $32.00 | $34.00 | $34.00 | $25.00 | 4% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 78 CY | $880 | $880 | $890 | $750 | $847 | $800 | $900 | 4% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 31,405 LB | $2.10 | $2.00 | $1.70 | $1.75 | $1.92 | $2.00 | $2.00 | 4% |
| 304E20000 AGGREGATE BASE | 907 CY | $67.00 | $85.00 | $75.00 | $95.00 | $66.00 | $115 | $90.00 | 3% |
| 503E21100 UNCLASSIFIED EXCAVATION | 605 CY | $100 | $35.00 | $25.00 | $30.00 | $135 | $100 | $125 | 3% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 132 FT | $427 | $450 | $450 | $450 | $442 | $460 | $427 | 3% |
| 203E10000 EXCAVATION | 1,502 CY | $35.00 | $20.00 | $24.00 | $25.00 | $15.00 | $26.00 | $30.00 | 3% |
| 659E00300 TOPSOIL | 1,453 CY | $25.00 | $10.00 | $16.00 | $43.00 | $35.00 | $35.00 | $50.00 | 2% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 19,112 LB | $1.90 | $1.42 | $1.30 | $1.30 | $1.65 | $2.00 | $1.50 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $680 | $115 | $265 | $150 | $440 | $300 | $530 | 2% |
| $37.00 |
| $45.00 |
| $20.00 |
| $12.00 |
| $24.00 |
| $35.00 |
| $20.00 |
| 202E38000 GUARDRAIL REMOVED | 1,157 FT | $6.00 | $2.50 | $2.50 | $6.00 | $6.09 | $2.00 | $6.00 |
| 204E10000 SUBGRADE COMPACTION | 5,320 SY | $2.00 | $2.00 | $5.00 | $5.00 | $3.50 | $3.50 | $4.00 |
| 204E45000 PROOF ROLLING | 3 HOUR | $325 | $50.00 | $220 | $200 | $425 | $130 | $750 |
| 606E15050 GUARDRAIL, TYPE MGS | 525 FT | $20.00 | $28.50 | $20.00 | $20.00 | $20.30 | $19.60 | $20.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 200 FT | $24.00 | $21.50 | $21.50 | $24.00 | $24.37 | $21.40 | $24.00 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 100 FT | $22.00 | $24.00 | $24.00 | $22.00 | $22.34 | $23.60 | $22.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 12 EACH | $2,350 | $2,450 | $2,500 | $2,350 | $2,386 | $2,585 | $2,350 |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 4 EACH | $2,450 | $2,450 | $2,500 | $2,450 | $2,487 | $2,420 | $2,450 |
| 623E40500 REFERENCE MONUMENT, TYPE A | 1 EACH | $312 | $1,200 | $1,200 | $800 | $189 | $1,500 | $1,000 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 16 EACH | $312 | $850 | $175 | $500 | $377 | $500 | $500 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 1 EACH | $275 | $250 | $275 | $300 | $275 | $275 | $185 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $11,920 | $7,500 | $20,000 | $26,000 | $32,000 | $15,300 | $20,000 |
| 659E10000 SEEDING AND MULCHING | 11,131 SY | $0.92 | $1.50 | $0.87 | $4.50 | $1.40 | $1.85 | $1.10 |
| 659E20000 COMMERCIAL FERTILIZER | 1.51 TON | $1,500 | $800 | $912 | $1,720 | $1,250 | $535 | $600 |
| 659E31000 LIME | 2.29 ACRE | $200 | $150 | $159 | $850 | $150 | $20.00 | $40.00 |
| 659E35000 WATER | 59 MGAL | $1.00 | $0.01 | $1.00 | $25.00 | $1.00 | $1.00 | $5.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,958 SY | $1.95 | $3.00 | $1.46 | $2.80 | $2.50 | $2.50 | $2.80 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,875 | $4,500 | $2,875 | $4,000 | $2,500 | $6,000 | $2,875 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,420 | $5,000 | $6,800 | $9,000 | $14,000 | $8,000 | $6,500 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,164 | $5,000 | $10,164 | $12,000 | $9,300 | $10,200 | $11,000 |
| 832E30000 EROSION CONTROL | 29,853 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 926 FT | $19.00 | $20.00 | $16.00 | $15.00 | $20.00 | $19.00 | $60.00 |
| 611E01400 6" CONDUIT, TYPE E | 120 FT | $28.00 | $18.00 | $15.00 | $8.00 | $23.00 | $36.00 | $45.00 |
| 611E01500 6" CONDUIT, TYPE F | 120 FT | $28.00 | $15.00 | $15.00 | $8.00 | $24.00 | $38.00 | $45.00 |
| 611E04900 12" CONDUIT, TYPE D | 50 FT | $48.00 | $75.00 | $45.00 | $65.00 | $60.00 | $94.00 | $90.00 |
| 611E06400 15" CONDUIT, TYPE D | 128 FT | $55.00 | $85.00 | $61.00 | $65.00 | $65.00 | $85.00 | $85.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 1,479 SY | $16.50 | $15.50 | $18.00 | $18.00 | $18.00 | $16.50 | $10.75 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 77 CY | $65.00 | $105 | $90.00 | $95.00 | $128 | $165 | $135 |
| 407E20000 NON-TRACKING TACK COAT | 751 GAL | $3.90 | $3.90 | $3.50 | $3.50 | $3.50 | $3.90 | $4.25 |
| 617E10100 COMPACTED AGGREGATE | 25 CY | $97.00 | $98.00 | $190 | $110 | $91.00 | $134 | $275 |
| 621E00100 RPM | 22 EACH | $130 | $220 | $199 | $172 | $266 | $284 | $200 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 12 EACH | $60.00 | $5.00 | $9.00 | $20.00 | $21.00 | $45.00 | $8.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 4 EACH | $13.00 | $10.00 | $10.00 | $13.00 | $13.20 | $10.50 | $13.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 22 EACH | $13.00 | $15.00 | $15.00 | $13.00 | $13.20 | $12.00 | $13.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 81.1 FT | $25.00 | $17.50 | $17.50 | $28.00 | $27.30 | $18.00 | $14.50 |
| 630E08600 SIGN POST REFLECTOR | 4 EACH | $80.00 | $50.00 | $50.00 | $78.00 | $77.53 | $45.00 | $87.25 |
| 630E80100 SIGN, FLAT SHEET | 53.4 SF | $26.50 | $25.00 | $25.00 | $30.00 | $29.76 | $28.00 | $27.70 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 11 EACH | $60.00 | $12.00 | $25.00 | $16.50 | $16.10 | $10.00 | $49.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 7 EACH | $65.00 | $12.00 | $25.00 | $21.50 | $21.46 | $20.00 | $76.95 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.6 MILE | $4,500 | $2,100 | $1,800 | $1,800 | $1,800 | $1,800 | $3,615 |
| 642E00300 CENTER LINE, TYPE 1 | 0.4 MILE | $11,250 | $2,500 | $2,500 | $2,000 | $2,000 | $2,000 | $4,820 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 15 CY | $156 | $100 | $92.00 | $70.00 | $100 | $88.00 | $200 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $98.00 | $65.00 | $110 | $55.00 | $78.00 | $85.00 | $85.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $9,330 | $13,500 | $9,452 | $13,500 | $12,598 | $20,000 | $9,070 |
| 616E10000 WATER | 16 MGAL | $61.00 | $1.00 | $44.00 | $25.00 | $300 | $90.00 | $100 |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $30,000 | $45,000 | $36,500 | $30,000 | $156,000 | $55,000 | $77,300 |
| 202E22900 APPROACH SLAB REMOVED | 111 SY | $45.00 | $55.00 | $26.00 | $50.00 | $69.00 | $50.00 | $45.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $14,000 | $14,000 | $23,000 | $20,000 | $30,000 | $22,000 | $20,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $16,000 | $20,000 | $9,000 | $20,000 | $3,000 | $80,000 | $44,175 |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $14,000 | $14,000 | $18,000 | $25,000 | $7,000 | $20,000 | $20,000 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 560 FT | $26.00 | $52.00 | $24.55 | $40.00 | $30.00 | $75.00 | $38.00 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 480 FT | $29.00 | $2.00 | $32.00 | $8.00 | $23.00 | $10.00 | $20.00 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 89 SY | $19.00 | $19.00 | $20.00 | $20.00 | $22.00 | $20.00 | $27.00 |
| 512E33000 TYPE 2 WATERPROOFING | 11 SY | $42.00 | $42.00 | $75.00 | $40.00 | $71.00 | $45.00 | $50.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 1,026 EACH | $5.45 | $4.50 | $6.00 | $5.25 | $5.50 | $8.00 | $5.25 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 86 SF | $9.00 | $9.00 | $3.50 | $12.00 | $9.00 | $11.00 | $9.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 86 SF | $6.00 | $6.00 | $4.00 | $12.00 | $10.00 | $12.00 | $9.50 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 38 SF | $8.00 | $8.00 | $7.00 | $17.00 | $14.00 | $13.00 | $12.50 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 107 FT | $30.00 | $30.00 | $30.00 | $35.00 | $40.00 | $50.00 | $40.00 |
| 516E44000 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 12 EACH | $1,550 | $1,550 | $1,200 | $1,500 | $1,509 | $1,200 | $1,500 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 4 CY | $375 | $500 | $140 | $295 | $300 | $300 | $250 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 127 FT | $15.00 | $15.00 | $15.50 | $20.00 | $30.00 | $27.00 | $30.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 121 FT | $14.00 | $14.00 | $4.50 | $11.00 | $9.00 | $11.00 | $25.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 52 FT | $23.00 | $23.00 | $15.00 | $11.00 | $50.00 | $19.00 | $45.00 |
| 526E90031 TYPE C INSTALLATION, AS PER PLAN | 80 FT | $295 | $295 | $250 | $275 | $220 | $320 | $200 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $14,780 | $14,780 | $16,250 | $17,645 | $14,250 | $15,000 | $3,500 |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $28,000 | $35,000 | $39,000 | $20,000 | $110,000 | $65,000 | $50,000 |
| 202E22900 APPROACH SLAB REMOVED | 111 SY | $55.00 | $65.00 | $26.00 | $50.00 | $70.00 | $50.00 | $45.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $16,000 | $12,000 | $26,000 | $25,000 | $1.00 | $22,000 | $65,000 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 13 CY | $1,575 | $1,200 | $3,100 | $1,500 | $2,200 | $2,700 | $1,800 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 2 CY | $1,950 | $1,800 | $4,100 | $3,000 | $2,500 | $2,300 | $5,000 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 82 SY | $13.00 | $25.00 | $20.00 | $20.00 | $22.00 | $20.00 | $27.00 |
| 512E33000 TYPE 2 WATERPROOFING | 161 SY | $30.00 | $22.00 | $26.50 | $27.00 | $42.00 | $26.50 | $50.00 |
| 512E33010 TYPE 3 WATERPROOFING | 289 SY | $35.00 | $38.00 | $35.00 | $45.00 | $52.00 | $35.00 | $75.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 31 SF | $7.50 | $15.00 | $1.90 | $12.00 | $11.00 | $13.00 | $9.50 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 13 CY | $160 | $165 | $210 | $200 | $160 | $140 | $200 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $3,000 | $6,000 | $10,000 | $10,000 | $10,000 | $20,000 | $70,000 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $2,000 | $3,000 | $25,000 | $10,000 | $1.00 | $5,000 | $25,000 |
| 503E21100 UNCLASSIFIED EXCAVATION | 63 CY | $66.00 | $45.00 | $125 | $60.00 | $80.00 | $250 | $105 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 3,696 LB | $1.90 | $2.00 | $1.35 | $1.30 | $1.65 | $2.00 | $1.50 |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 12 CY | $1,525 | $250 | $800 | $1,300 | $2,500 | $1,100 | $1,700 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 27 CY | $505 | $250 | $1,125 | $1,000 | $750 | $700 | $975 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $2,400 | $2,000 | $6,200 | $2,500 | $3,500 | $4,000 | $7,500 |
| 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY) | 41 SY | $21.00 | $10.00 | $20.00 | $20.00 | $40.00 | $20.00 | $27.00 |
| 512E33000 TYPE 2 WATERPROOFING | 189 SY | $31.00 | $40.00 | $26.50 | $27.00 | $46.00 | $26.50 | $54.90 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 26 SF | $9.00 | $20.00 | $2.20 | $12.00 | $10.00 | $14.00 | $8.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 6 CY | $270 | $250 | $180 | $200 | $180 | $140 | $200 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $20,000 | $16,000 | $15,000 | $17,000 | $20,000 | $20,000 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,800 | $7,500 | $27,000 | $10,000 | $10,000 | $25,000 | $28,000 |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $3,300 | $1,800 | $3,900 | $1,400 | $2,500 | $2,500 | $3,700 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $21,900 | $10,000 | $25,000 | $12,000 | $8,000 | $28,000 | $35,500 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $5,050 | $1,200 | $2,000 | $2,000 | $2,000 | $2,000 | $750 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $5,050 | $1,200 | $2,000 | $2,000 | $2,000 | $2,000 | $750 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 72 FT | $3,700 | $266k | 10% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 313 CY | $500 | $157k | 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 734 CY | $192 | $141k | 5% |
| 513E10261 STRUCTURAL STEEL MEMBERS, LEVEL 3, AS PER PLAN | 48,000 LB | $2.75 | $132k | 5% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 105 CY | $1,245 | $131k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $128,000 | $128k | 5% |
| 611E94936 9' X 4' CONDUIT, TYPE A, 706.05 | 84 FT | $1,250 | $105k | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 356 CY | $278 | $99k | 4% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 853 CY | $98 | $84k | 3% |
| 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER | 178 SY | $410 | $73k | 3% |