HAM-US 52-36.85
HAM County · est $1.8M
Bid dateThursday, January 16—
HAM County · est $1.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 38 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2Kt Holden Construction LLC | R3George J Igel & CO INC | R4Ford Development CORP | R5Great Lakes Construction CO | R6Kokosing Construction Company INC | R7Prus Construction Company | R8John R Jurgensen Company | R9Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24x162 | 2,400 FT | $136 | $155 | $150 | $154 | $148 | $165 | $150 | $143 | $183 | 19% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 2,253 FT | $140 |
| Item | Quantity | R1Alan Stone CO INC | R2Kt Holden Construction LLC | R3George J Igel & CO INC | R4Ford Development CORP | R5Great Lakes Construction CO | R6Kokosing Construction Company INC | R7Prus Construction Company | R8John R Jurgensen Company | R9Sunesis Construction CO |
|---|---|---|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 775 FT | $5.50 | $2.00 | $7.00 | $3.00 | $7.00 | $7.00 | $7.70 | $7.00 | $7.00 |
| 203E10000 EXCAVATION | 121 CY | $95.00 | $47.55 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $90.00 |
| $133 |
| $172 |
| $195 |
| $160 |
| $164 |
| $172 |
| $280 |
| 18% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 36" DIAMETER, UN | 1,626 FT | $96.50 | $100 | $110 | $117 | $130 | $120 | $141 | $145 | $203 | 9% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W27x129 | 1,424 FT | $110 | $120 | $120 | $120 | $115 | $135 | $123 | $110 | $144 | 9% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 1,060 FT | $130 | $305 | $145 | $207 | $200 | $165 | $225 | $200 | $312 | 8% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 354 CY | $340 | $340 | $340 | $380 | $345 | $345 | $230 | $340 | $355 | 7% |
| 511E81300 CONCRETE, MISC.: PRECAST CONCRETE PANEL | 249 EACH | $440 | $346 | $400 | $700 | $460 | $480 | $730 | $517 | $715 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $77,000 | $71,115 | $50,000 | $100,000 | $108,350 | $111,000 | $100,000 | $100,000 | $124,493 | 4% |
| 511E81200 CONCRETE, MISC.: CONSULTANT FOR CONCRETE QUALITY C | 1 LS | $60,000 | $28,600 | $62,500 | $25,000 | $23,000 | $32,000 | $30,000 | $32,088 | $40,637 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449), 8" | 150 CY | $390 | $375 | $375 | $385 | $350 | $350 | $315 | $375 | $392 | 3% |
| 606E15250 GUARDRAIL, TYPE MGS QUARTER POST SPACING | 725 FT | $60.00 | $41.40 | $48.00 | $58.00 | $48.00 | $48.00 | $52.80 | $48.00 | $48.00 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,490 FT | $21.00 | $22.97 | $23.50 | $26.00 | $27.50 | $40.00 | $25.25 | $22.97 | $16.33 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 7,316 SY | $4.00 | $5.00 | $4.00 | $3.30 | $3.00 | $3.00 | $3.55 | $5.00 | $5.22 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $19,300 | $50,000 | $20,500 | $18,000 | $31,858 | $35,000 | $92,410 | $19,872 | 1% |
| 644E60000 GREEN COLORED PAVEMENT FOR BIKE LANES | 1,456 SF | $15.00 | $10.70 | $12.29 | $14.00 | $12.29 | $12.29 | $11.80 | $10.70 | $12.29 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $18,350 | $15,000 | $15,000 | $5,000 | $10,000 | $20,000 | $34,834 | $6,347 | 1% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 250 FT | $70.00 | $78.70 | $55.00 | $70.00 | $63.00 | $60.00 | $65.00 | $76.42 | $30.77 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $17,000 | $29,350 | $10,000 | $25,000 | $15,000 | $20,000 | $30,000 | $14,152 | $15,000 | 1% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,800 | $2,043 | $3,000 | $2,100 | $2,740 | $4,500 | $2,250 | $1,362 | $2,657 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $6,400 | $10,000 | $10,000 | $11,000 | $20,000 | $13,000 | $4,779 | $3,800 | 1% |
| $55.75 |
| $20.00 |
| $75.00 |
| $95.00 |
| $68.00 |
| $95.04 |
| $58.10 |
| 203E20000 EMBANKMENT | 87 CY | $7.00 | $46.25 | $41.50 | $20.00 | $55.00 | $70.00 | $72.80 | $90.16 | $37.66 |
| 204E10000 SUBGRADE COMPACTION | 708 SY | $7.00 | $2.80 | $7.00 | $1.00 | $1.75 | $6.00 | $2.50 | $4.65 | $3.90 |
| 204E45000 PROOF ROLLING | 1 HOUR | $270 | $167 | $190 | $100 | $325 | $300 | $150 | $217 | $703 |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 50 FT | $35.00 | $33.20 | $35.00 | $40.00 | $35.00 | $35.00 | $38.50 | $35.00 | $35.00 |
| 202E23000 PAVEMENT REMOVED | 504 SY | $24.00 | $39.00 | $25.00 | $10.00 | $40.00 | $35.00 | $36.55 | $45.98 | $29.53 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $10,000 | $6,580 | $8,000 | $5,000 | $11,500 | $5,119 | $9,350 | $6,732 | $1,200 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 25 SY | $140 | $120 | $140 | $100 | $185 | $225 | $191 | $133 | $156 |
| 659E10000 SEEDING AND MULCHING | 1,080 SY | $5.50 | $3.75 | $3.75 | $1.00 | $3.75 | $3.75 | $4.15 | $3.75 | $3.52 |
| 659E20000 COMMERCIAL FERTILIZER | 0.14 TON | $630 | $1,500 | $1,500 | $300 | $1,500 | $1,500 | $1,650 | $1,500 | $1,400 |
| 659E31000 LIME | 0.21 ACRE | $900 | $200 | $200 | $100 | $200 | $200 | $220 | $200 | $200 |
| 659E35000 WATER | 6 MGAL | $1.00 | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 | $1.10 | $1.00 | $1.39 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 668 FT | $15.00 | $14.85 | $22.50 | $12.00 | $16.00 | $50.00 | $21.00 | $33.56 | $13.60 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 668 FT | $15.00 | $10.95 | $18.50 | $10.00 | $23.00 | $28.00 | $18.50 | $32.18 | $18.32 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 62 FT | $3.00 | $29.00 | $80.00 | $25.00 | $50.00 | $30.00 | $68.00 | $46.36 | $50.12 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $620 | $297 | $425 | $300 | $425 | $600 | $795 | $508 | $342 |
| 304E20000 AGGREGATE BASE, 7" | 139 CY | $105 | $86.90 | $150 | $80.00 | $115 | $125 | $125 | $139 | $93.67 |
| 407E20000 NON-TRACKING TACK COAT | 719 GAL | $5.00 | $5.00 | $5.00 | $3.30 | $3.00 | $3.00 | $3.85 | $5.00 | $5.22 |
| 621E00100 RPM | 45 EACH | $110 | $45.00 | $97.75 | $110 | $97.75 | $97.75 | $90.00 | $81.20 | $125 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 45 EACH | $9.00 | $10.50 | $20.18 | $4.00 | $40.00 | $40.00 | $24.00 | $12.23 | $13.04 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (UNIDIRECTIONAL) | 8 EACH | $15.00 | $12.50 | $13.00 | $15.00 | $13.00 | $13.00 | $14.30 | $13.00 | $13.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 28.5 FT | $15.00 | $20.00 | $15.50 | $17.00 | $15.50 | $15.50 | $40.50 | $15.50 | $15.00 |
| 630E80100 SIGN, FLAT SHEET | 12 SF | $20.00 | $30.00 | $18.00 | $20.00 | $18.00 | $18.00 | $58.00 | $18.00 | $24.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $20.00 | $15.00 | $20.00 | $22.00 | $20.00 | $20.00 | $18.25 | $20.00 | $30.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $30.00 | $30.00 | $25.00 | $28.00 | $25.00 | $25.00 | $24.25 | $25.00 | $35.00 |
| 644E00104 EDGE LINE, 6" | 0.7 MILE | $19,000 | $6,725 | $16,734 | $19,000 | $16,734 | $16,734 | $7,400 | $6,725 | $16,734 |
| 644E00204 LANE LINE, 6" | 0.67 MILE | $9,400 | $3,160 | $8,376 | $10,000 | $8,376 | $8,376 | $3,500 | $3,160 | $8,376 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 1,290 FT | $5.50 | $5.25 | $5.00 | $6.00 | $5.00 | $5.00 | $5.80 | $5.25 | $5.00 |
| 644E01630 BIKE LANE SYMBOL MARKING | 3 EACH | $620 | $495 | $550 | $600 | $550 | $550 | $545 | $495 | $550 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $110 | $120 | $125 | $60.00 | $100 | $125 | $125 | $91.65 | $70.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 15 EACH | $30.00 | $13.39 | $35.00 | $15.00 | $13.39 | $33.00 | $14.75 | $13.39 | $10.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 15 EACH | $15.00 | $20.89 | $35.00 | $23.00 | $20.89 | $48.00 | $23.00 | $20.89 | $12.00 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.67 MILE | $19,000 | $9,262 | $16,812 | $10,000 | $16,812 | $16,812 | $10,200 | $9,262 | $16,812 |
| 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I | 1,221 FT | $3.00 | $2.37 | $2.50 | $3.00 | $2.50 | $2.50 | $2.60 | $2.37 | $2.50 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 60 CY | $190 | $178 | $200 | $150 | $275 | $115 | $155 | $213 | $165 |
| 524E95000 DRILLED SHAFTS, MISC.: EXTENSION | 3 FT | $170 | $900 | $200 | $200 | $191 | $690 | $425 | $456 | $465 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24x162 | 2,400 FT | $136 | $326k | 17% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 2,253 FT | $140 | $315k | 16% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 36" DIAMETER, UN | 1,626 FT | $96.5 | $157k | 8% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W27x129 | 1,424 FT | $110 | $157k | 8% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 1,060 FT | $130 | $138k | 7% |
| 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG | 354 CY | $340 | $120k | 6% |
| 511E81300 CONCRETE, MISC.: PRECAST CONCRETE PANEL | 249 EACH | $440 | $110k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $77,000 | $77k | 4% |
| 511E81200 CONCRETE, MISC.: CONSULTANT FOR CONCRETE QUALITY C | 1 LS | $60,000 | $60k | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449), 8" | 150 CY | $390 | $59k | 3% |