LIC-SR 37-09.63
LIC County · est $0.6M
Bid dateThursday, June 13—
LIC County · est $0.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 28 more items below.
| Item | Quantity | R1Crawford Construction Company INC | R2Axis Civil Construction LLC | R3Buds INC | R4Rietschlin Construction INC | R5Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|---|---|
| 611E96499 20' X 8' CONDUIT, TYPE A, 706.05, AS PER PLAN | 67 FT | $2,650 | $3,150 | $3,875 | $3,950 | $5,100 | 33% |
| 511E46211 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 89 CY | $725 | $845 | $1,250 | $640 | $1,200 | 12% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 3,000 DLR | $13.00 | $21.00 | $21.00 | $21.00 | $9.00 | 7% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $32,000 | $12,000 | $18,000 | $30,000 | $46,000 | 6% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 107 CY | $286 | $310 | $255 | $270 | $320 | 6% |
| 624E10000 MOBILIZATION |
| Item | Quantity | R1Crawford Construction Company INC | R2Axis Civil Construction LLC | R3Buds INC | R4Rietschlin Construction INC | R5Alan Stone CO INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,900 | $5,500 | $6,500 | $6,000 | $7,000 |
| 202E23000 PAVEMENT REMOVED | 284 SY | $12.00 | $15.00 | $30.00 | $22.00 | $75.00 |
| 203E10001 EXCAVATION, AS PER PLAN | 165 CY | $26.00 | $35.00 | $48.00 | $42.00 | $80.00 |
| 209E15000 RESHAPING UNDER GUARDRAIL | 4 STA | $50.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $30,000 |
| $20,000 |
| $25,000 |
| $40,000 |
| $26,500 |
| 6% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $21,800 | $18,000 | $22,500 | $18,000 | $17,000 | 4% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 48 CY | $435 | $380 | $365 | $400 | $470 | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (56 CY | $364 | $360 | $305 | $333 | $390 | 4% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 6,896 LB | $2.80 | $3.00 | $2.25 | $2.00 | $5.00 | 4% |
| 304E20000 AGGREGATE BASE | 112 CY | $121 | $120 | $120 | $134 | $150 | 2% |
| 512E33000 TYPE 2 WATERPROOFING | 340 SY | $39.00 | $21.00 | $22.00 | $29.00 | $45.00 | 2% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 99 CY | $131 | $150 | $125 | $120 | $210 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,000 | $5,000 | $10,000 | $10,000 | $8,500 | 1% |
| 606E16051 GUARDRAIL REBUILT, TYPE MGS, AS PER PLAN | 393.75 FT | $18.00 | $20.00 | $25.00 | $22.00 | $25.00 | 1% |
| 832E30000 EROSION CONTROL | 7,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $6,900 | $7,000 | $8,000 | $5,500 | $9,700 | 1% |
| 203E20000 EMBANKMENT | 87 CY | $74.00 | $35.00 | $63.00 | $40.00 | $35.00 | 1% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $6,420 | $18,000 | $4,000 | $30,000 | $27,000 | 1% |
| 209E70000 BORROW | 40 CY | $150 | $70.00 | $1.00 | $52.00 | $55.00 | 1% |
| $55.00 |
| $8.00 |
| $60.50 |
| $370 |
| 606E15050 GUARDRAIL, TYPE MGS | 12.5 FT | $31.00 | $35.00 | $35.00 | $40.00 | $45.00 |
| 606E17350 GUARDRAIL, TYPE MGS, 25' LONG-SPAN | 100 FT | $27.00 | $28.00 | $28.00 | $31.00 | $35.00 |
| 606E27861 ANCHOR ASSEMBLY REBUILT, MGS TYPE E, AS PER PLAN | 2 EACH | $2,003 | $1,100 | $1,100 | $1,210 | $1,400 |
| 606E27911 ANCHOR ASSEMBLY REBUILT, MGS TYPE T, AS PER PLAN | 2 EACH | $1,300 | $850 | $850 | $935 | $1,100 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 750 SY | $4.30 | $2.40 | $4.00 | $11.00 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $1,100 | $600 | $700 | $1,000 | $1,000 |
| 659E31000 LIME | 0.16 ACRE | $28.00 | $250 | $400 | $200 | $15.00 |
| 659E35000 WATER | 4 MGAL | $1.15 | $1.00 | $1.00 | $1.00 | $1.00 |
| 204E10000 SUBGRADE COMPACTION | 304 SY | $4.70 | $5.25 | $5.00 | $4.00 | $7.50 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 464 FT | $7.00 | $1.40 | $4.00 | $6.00 | $15.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VARIABLE DEPTH | 533 SY | $7.75 | $16.50 | $15.00 | $8.00 | $20.00 |
| 407E20000 NON-TRACKING TACK COAT | 177 GAL | $7.70 | $7.50 | $7.00 | $8.00 | $9.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 7 EACH | $51.00 | $25.00 | $5.00 | $50.00 | $35.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.11 MILE | $17,080 | $7,095 | $8,500 | $16,900 | $9,200 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $22,900 | $12,575 | $12,800 | $22,500 | $16,000 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 10 CY | $128 | $100 | $100 | $125 | $440 |
| 614E12421 DETOUR SIGNING, AS PER PLAN | 1 LS | $3,000 | $4,000 | $4,500 | $3,000 | $5,200 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $400 | $250 | $100 | $300 | $880 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $1,045 | $1,850 | $2,500 | $1,045 | $2,400 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 23 EACH | $71.60 | $28.00 | $75.00 | $36.00 | $50.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 63 SY | $71.50 | $65.00 | $25.00 | $72.00 | $55.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 53 SF | $10.00 | $9.00 | $30.00 | $31.00 | $15.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 23 CY | $146 | $140 | $175 | $135 | $270 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,575 | $8,000 | $6,000 | $13,200 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96499 20' X 8' CONDUIT, TYPE A, 706.05, AS PER PLAN | 67 FT | $2,650 | $178k | 29% |
| 511E46211 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 89 CY | $725 | $65k | 11% |
| 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI | 3,000 DLR | $13 | $39k | 6% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $32,000 | $32k | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 107 CY | $286 | $31k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $30k | 5% |
| 202E11001 STRUCTURE REMOVED, AS PER PLAN | 1 LS | $21,800 | $22k | 4% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 48 CY | $435 | $21k | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (56 CY | $364 | $20k | 3% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 6,896 LB | $2.8 | $19k | 3% |