TRU-SR 46-11.20
TRU County · est $0.9M
Bid dateThursday, October 31—
TRU County · est $0.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 74 more items below.
| Item | Quantity | R1Bog Construction INC | R2Bcc Ohio INC | R3Shook Company LLC | R4Barbicas Construction Company INC | % of bid |
|---|---|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $8,000 | $7,964 | $15,000 | $9,500 | 13% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $75,000 | $34,293 | $50,000 | $15,000 | 12% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 222 SY | $265 | $404 | $250 | $375 | 10% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 253 CY | $195 | $210 | $165 | $400 | 8% |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 664 SF | $70.00 | $173 | $200 | $195 | 8% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 82 CY | $455 | $347 | $420 |
| Item | Quantity | R1Bog Construction INC | R2Bcc Ohio INC | R3Shook Company LLC | R4Barbicas Construction Company INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,500 | $2,106 | $2,000 | $10,000 |
| 202E38000 GUARDRAIL REMOVED | 570 FT | $3.00 | $2.10 | $3.00 | $2.00 |
| 202E98200 REMOVAL MISC.: CONDUIT | 10 FT | $100 | $29.25 | $10.00 | $50.00 |
| 203E10000 EXCAVATION | 147 CY | $30.00 | $11.70 | $25.00 | $45.00 |
| 203E20000 EMBANKMENT | 101 CY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $650 |
| 6% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 68 FT | $470 | $460 | $600 | $500 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $24,899 | $39,966 | $20,000 | 5% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 29 CY | $975 | $1,405 | $2,000 | $1,200 | 5% |
| 304E20000 AGGREGATE BASE 6" | 213 CY | $120 | $121 | $70.00 | $200 | 4% |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 40 EACH | $545 | $539 | $550 | $660 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $10,120 | $20,000 | $30,000 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $3,480 | $12,000 | $3,200 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,500 | $2,574 | $5,000 | $89,000 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $14,000 | $9,444 | $10,000 | $15,000 | 2% |
| 202E23000 PAVEMENT REMOVED | 746 SY | $15.00 | $12.86 | $25.00 | $25.00 | 2% |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 328 SY | $32.00 | $34.41 | $40.00 | $35.00 | 2% |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 4 EACH | $2,600 | $2,284 | $3,000 | $2,400 | 2% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 19 CY | $455 | $735 | $420 | $1,000 | 1% |
| 526E90020 TYPE B INSTALLATION | 45 SY | $175 | $148 | $250 | $105 | 1% |
| $35.00 |
| $11.70 |
| $25.00 |
| $75.00 |
| 204E10000 SUBGRADE COMPACTION | 1,297 SY | $4.00 | $2.34 | $2.00 | $8.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 25 CY | $40.00 | $29.25 | $25.00 | $45.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 25 CY | $50.00 | $152 | $50.00 | $100 |
| 204E50000 GEOTEXTILE FABRIC | 75 SY | $10.00 | $4.65 | $10.00 | $8.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 200 FT | $24.00 | $19.95 | $25.00 | $22.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 87.5 FT | $28.80 | $25.20 | $35.00 | $24.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $2,500 | $2,468 | $2,500 | $2,300 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH (2016) | 3 EACH | $2,600 | $2,599 | $3,000 | $2,500 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $4,000 | $3,480 | $5,000 | $5,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $6,000 | $3,480 | $5,000 | $1,600 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 1 SY | $850 | $377 | $500 | $400 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 1 CY | $500 | $377 | $500 | $500 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $134 | $50.00 | $200 |
| 659E00300 TOPSOIL | 62 CY | $45.00 | $81.90 | $40.00 | $75.00 |
| 659E10000 SEEDING AND MULCHING | 555 SY | $10.00 | $6.72 | $2.00 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.07 TON | $2,000 | $1,071 | $1,000 | $1,020 |
| 659E31000 LIME | 0.12 ACRE | $100 | $31.50 | $1,000 | $30.00 |
| 659E35000 WATER | 3 MGAL | $1.00 | $1.05 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 20 FT | $50.00 | $33.23 | $7.00 | $30.00 |
| 605E31100 AGGREGATE DRAINS | 220 FT | $10.00 | $27.22 | $20.00 | $40.00 |
| 611E00900 6" CONDUIT, TYPE B | 20 FT | $20.00 | $33.72 | $7.00 | $6.00 |
| 611E01400 6" CONDUIT, TYPE E | 20 FT | $20.00 | $33.72 | $7.00 | $6.00 |
| 611E01500 6" CONDUIT, TYPE F | 40 FT | $15.00 | $28.56 | $7.00 | $6.00 |
| 611E97400 CONDUIT, MISC.: TYPE C FOR DRAINAGE DISCHARGE CONT | 10 FT | $10.00 | $187 | $10.00 | $28.00 |
| 611E97400 CONDUIT, MISC.: TYPE E FOR DRAINAGE DISCHARGE CONT | 10 FT | $10.00 | $187 | $10.00 | $30.00 |
| 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT | 10 FT | $10.00 | $187 | $10.00 | $34.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $500 | $410 | $300 | $450 |
| 407E20000 NON-TRACKING TACK COAT (0.06 GAL/SY) | 178 GAL | $4.00 | $3.15 | $3.05 | $3.25 |
| 408E10001 PRIME COAT, AS PER PLAN | 39 GAL | $40.00 | $5.25 | $20.00 | $100 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 3 CY | $150 | $315 | $70.00 | $200 |
| 621E00100 RPM | 5 EACH | $350 | $57.96 | $700 | $675 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $100 | $18.72 | $10.00 | $100 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 10 EACH | $15.00 | $12.60 | $12.47 | $12.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 28 FT | $25.00 | $24.15 | $35.00 | $14.75 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 14.5 FT | $30.00 | $27.30 | $40.00 | $25.00 |
| 630E80100 SIGN, FLAT SHEET | 11.3 SF | $40.00 | $31.50 | $41.00 | $29.00 |
| 630E80100 SIGN, FLAT SHEET, 730.20 | 2 SF | $40.00 | $31.50 | $41.00 | $81.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $100 | $10.50 | $25.00 | $64.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $100 | $15.75 | $25.00 | $64.00 |
| 646E10010 EDGE LINE, 6" | 0.12 MILE | $45,000 | $21,000 | $21,000 | $50,000 |
| 646E10200 CENTER LINE | 0.06 MILE | $50,000 | $47,250 | $21,000 | $75,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $30.00 | $82.00 | $75.00 | $100 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $150 | $840 | $150 | $350 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 6 SNMT | $1,200 | $998 | $1,100 | $950 |
| 616E10000 WATER | 2 MGAL | $1.00 | $11.03 | $1.00 | $100 |
| 202E22900 APPROACH SLAB REMOVED | 222 SY | $35.00 | $71.67 | $50.00 | $39.00 |
| 202E23500 WEARING COURSE REMOVED | 349 SY | $15.00 | $11.96 | $20.00 | $30.00 |
| 202E98000 REMOVAL MISC.: CHANNEL CLEANOUT | 1 LS | $5,500 | $1,872 | $5,000 | $10,000 |
| 407E13900 TACK COAT, 702.13 | 18 GAL | $10.00 | $11.67 | $5.25 | $3.50 |
| 407E20000 NON-TRACKING TACK COAT | 16 GAL | $10.00 | $19.69 | $3.05 | $3.25 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $5,000 | $7,296 | $1,500 | $3,500 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $5,000 | $2,916 | $2,500 | $5,000 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 3,775 LB | $2.00 | $1.66 | $3.00 | $2.25 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 50 LB | $2.00 | $1.66 | $20.00 | $3.25 |
| 511E44110 CLASS QC1 CONCRETE, ABUTMENT NOT INCLUDING FOOTING | 1 CY | $3,000 | $3,472 | $5,000 | $3,000 |
| 512E10601 CONCRETE REPAIR BY EPOXY INJECTION, AS PER PLAN | 33 FT | $145 | $72.52 | $200 | $190 |
| 512E33000 TYPE 2 WATERPROOFING | 4 SY | $150 | $47.55 | $50.00 | $175 |
| 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE | 313 SY | $25.00 | $19.70 | $30.00 | $30.00 |
| 515E30000 HIGH EARLY STRENGTH KEYWAY GROUT | 256 FT | $12.00 | $17.03 | $15.00 | $15.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 18 SF | $20.00 | $37.95 | $10.00 | $28.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 88 FT | $35.00 | $55.09 | $100 | $35.00 |
| 516E41100 1/8" PREFORMED BEARING PAD, TYPE CDP | 20 EACH | $50.00 | $58.35 | $40.00 | $46.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 10 CY | $140 | $266 | $75.00 | $240 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 69 FT | $20.00 | $28.60 | $30.00 | $30.00 |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 6 SF | $200 | $153 | $550 | $550 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 49 CY | $150 | $184 | $75.00 | $195 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $5,500 | $9,975 | $5,000 | $1,310 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $500 | $3,100 | $1,500 | $1,550 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 515E12030 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 10 EACH | $8,000 | $80k | 10% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $75,000 | $75k | 10% |
| 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15") | 222 SY | $265 | $59k | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 253 CY | $195 | $49k | 6% |
| 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, | 664 SF | $70 | $46k | 6% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 82 CY | $455 | $37k | 5% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 68 FT | $470 | $32k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $30,000 | $30k | 4% |
| 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE | 29 CY | $975 | $28k | 4% |
| 304E20000 AGGREGATE BASE 6" | 213 CY | $120 | $26k | 3% |