NOB-SR 821-08.31
NOB County · est $1.5M
Bid dateThursday, January 30—
NOB County · est $1.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 43 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Alan Stone CO INC | R3Nls Paving, INC | R4Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 642 CY | $220 | $260 | $235 | $225 | 13% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 263 CY | $315 | $280 | $300 | $350 | 8% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 1,023 CY | $80.00 | $95.00 | $95.00 | $110 | 8% |
| 304E20000 AGGREGATE BASE | 858 CY | $92.00 | $90.00 | $110 | $110 | 7% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (243 CY | $300 | $320 | $265 | $250 | 7% |
| 204E60000 SPECIAL - GEOCELL, SUBGRADE (6 INCH CELL DEPTH) | 4,590 SY | $14.50 | $15.00 | $18.50 | $20.00 |
| Item | Quantity | R1Shelly & Sands INC | R2Alan Stone CO INC | R3Nls Paving, INC | R4Eclipse CO LLC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $4,500 | $5,000 | $1,500 | $6,500 |
| 202E30000 WALK REMOVED | 3,749 SF | $1.25 | $1.50 | $5.00 | $7.00 |
| 202E30200 STEPS REMOVED | 6 FT | $25.00 | $240 | $70.00 | $85.00 |
| 202E32000 CURB REMOVED | 140 FT | $2.50 | $5.50 | $10.00 | $11.00 |
| 202E32500 CURB AND GUTTER REMOVED | 2,343 FT | $3.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 2,275 FT | $28.50 | $65.00 | $36.50 | $72.00 | 6% |
| 611E04400 12" CONDUIT, TYPE B | 821 FT | $77.00 | $120 | $95.00 | $144 | 6% |
| 202E23000 PAVEMENT REMOVED | 4,237 SY | $12.00 | $22.00 | $25.00 | $22.50 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $50,000 | $27,000 | $150,000 | $63,000 | 5% |
| 611E98180 CATCH BASIN, NO. 3A | 17 EACH | $2,900 | $3,200 | $4,750 | $5,900 | 5% |
| 608E52001 CURB RAMP, AS PER PLAN | 1,795 SF | $22.00 | $12.00 | $25.00 | $43.00 | 4% |
| 609E26000 CURB, TYPE 6 | 518 FT | $65.00 | $50.00 | $30.00 | $34.00 | 3% |
| 253E02000 PAVEMENT REPAIR | 20 CY | $1,450 | $450 | $450 | $1,200 | 3% |
| 611E07400 18" CONDUIT, TYPE B | 275 FT | $99.00 | $140 | $115 | $151 | 3% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,500 CY | $17.50 | $40.00 | $50.00 | $57.00 | 2% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 2,176 SF | $11.50 | $10.00 | $8.50 | $14.00 | 2% |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $24,600 | $29,000 | $58,000 | $40,000 | 2% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 207 SY | $105 | $95.00 | $102 | $87.00 | 2% |
| $3.00 |
| $10.00 |
| $9.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 237 FT | $32.00 | $15.00 | $35.00 | $27.00 |
| 202E58000 MANHOLE REMOVED | 1 EACH | $425 | $360 | $1,000 | $535 |
| 202E58100 CATCH BASIN REMOVED | 4 EACH | $550 | $60.00 | $550 | $535 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 126 FT | $20.00 | $25.00 | $60.00 | $41.00 |
| 203E10000 EXCAVATION | 50 CY | $80.00 | $30.00 | $180 | $165 |
| 204E10000 SUBGRADE COMPACTION | 5,121 SY | $2.00 | $5.00 | $2.50 | $1.00 |
| 608E40000 CONCRETE STEPS, TYPE A | 30 FT | $650 | $500 | $200 | $237 |
| 616E10000 WATER | 67 MGAL | $30.00 | $1.00 | $50.00 | $49.00 |
| 659E00300 TOPSOIL | 6 CY | $200 | $120 | $650 | $209 |
| 659E10000 SEEDING AND MULCHING | 1,322 SY | $2.80 | $1.50 | $3.00 | $3.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 325 SY | $2.80 | $2.00 | $3.00 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $1,250 | $640 | $1,350 | $1,316 |
| 659E31000 LIME | 0.27 ACRE | $150 | $910 | $160 | $158 |
| 659E35000 WATER | 7 MGAL | $1.00 | $1,100 | $1.00 | $1.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 1,888 FT | $9.00 | $25.00 | $20.00 | $42.00 |
| 611E01500 6" CONDUIT, TYPE F | 130 FT | $25.00 | $40.00 | $30.00 | $33.00 |
| 611E05900 15" CONDUIT, TYPE B | 129 FT | $89.00 | $120 | $100 | $157 |
| 611E08900 21" CONDUIT, TYPE B | 133 FT | $124 | $180 | $140 | $168 |
| 611E10400 24" CONDUIT, TYPE B | 127 FT | $129 | $150 | $150 | $174 |
| 611E98150 CATCH BASIN, NO. 3 | 3 EACH | $3,900 | $5,200 | $6,000 | $6,000 |
| 611E98504 CATCH BASIN, NO. 2-2C WITH BICYCLE SAFE GRATE | 1 EACH | $2,500 | $3,200 | $4,000 | $5,300 |
| 611E98520 CATCH BASIN, NO. 2-3 WITH BICYCLE SAFE GRATE | 1 EACH | $2,700 | $4,000 | $4,000 | $5,400 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $4,500 | $4,800 | $7,500 | $7,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 2 EACH | $700 | $750 | $1,500 | $808 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.50") | 2,481 SY | $6.00 | $7.50 | $7.00 | $12.00 |
| 407E20000 NON-TRACKING TACK COAT | 624 GAL | $3.50 | $5.00 | $3.50 | $4.00 |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 26 SY | $230 | $75.00 | $100 | $68.00 |
| 452E12050 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS | 79 SY | $179 | $95.00 | $125 | $87.00 |
| 638E10800 VALVE BOX ADJUSTED TO GRADE | 2 EACH | $195 | $170 | $550 | $808 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 7 EACH | $75.00 | $550 | $150 | $132 |
| 644E00300 CENTER LINE | 0.31 MILE | $12,630 | $11,000 | $12,630 | $10,211 |
| 644E00500 STOP LINE | 120 FT | $10.00 | $9.00 | $9.95 | $8.00 |
| 644E00620 CROSSWALK LINE, 12" | 280 FT | $4.50 | $9.00 | $4.50 | $8.00 |
| 644E00630 CROSSWALK LINE, 24" (HIGH VISIBILITY) | 216 FT | $9.00 | $20.00 | $8.85 | $17.00 |
| 646E20200 PARKING LOT STALL MARKING | 64 FT | $12.50 | $3.50 | $12.50 | $3.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $900 | $1,650 | $1,600 | $1,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,700 | $12,000 | $9,993 | $27,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $17,000 | $26,000 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 642 CY | $220 | $141k | 11% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 263 CY | $315 | $83k | 6% |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 1,023 CY | $80 | $82k | 6% |
| 304E20000 AGGREGATE BASE | 858 CY | $92 | $79k | 6% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (243 CY | $300 | $73k | 6% |
| 204E60000 SPECIAL - GEOCELL, SUBGRADE (6 INCH CELL DEPTH) | 4,590 SY | $14.5 | $67k | 5% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 2,275 FT | $28.5 | $65k | 5% |
| 611E04400 12" CONDUIT, TYPE B | 821 FT | $77 | $63k | 5% |
| 202E23000 PAVEMENT REMOVED | 4,237 SY | $12 | $51k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $50,000 | $50k | 4% |