MOE-TR 183-(00.13)(00.50)
MOE County · est $1.2M
Bid dateThursday, February 27—
MOE County · est $1.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 59 more items below.
| Item | Quantity | R1R C Construction Company And Son | R2INC Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 17 FT | $4,775 | $5,000 | $5,700 | $4,500 | 11% |
| 515E12070 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 4 EACH | $19,500 | $25,000 | $32,000 | $23,000 | 11% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 27 CY | $2,300 | $2,000 | $2,800 | $2,650 | 9% |
| 304E20000 AGGREGATE BASE | 407 CY | $150 | $130 | $130 | $178 | 8% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 79 CY | $550 | $750 | $450 | $775 | 6% |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE | 74 CY | $550 | $790 | $1,250 |
| Item | Quantity | R1R C Construction Company And Son | R2INC Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Shelly & Sands INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $14,000 | $15,000 | $33,900 |
| 202E75000 FENCE REMOVED | 289 FT | $10.00 | $5.00 | $12.00 | $6.00 |
| 203E10000 EXCAVATION | 637 CY | $25.00 | $40.00 | $33.00 | $31.00 |
| 203E20000 EMBANKMENT | 256 CY | $25.00 | $25.00 | $42.00 | $37.00 |
| 204E10000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,150 |
| 6% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 178 CY | $195 | $150 | $215 | $210 | 5% |
| 615E10001 ROADS FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $30,000 | $110,000 | $18,500 | $70,000 | 4% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $30,000 | $20,000 | $3,500 | $25,000 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $10,000 | $6,000 | $17,000 | 4% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 139 FT | $215 | $320 | $300 | $225 | 4% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 9,268 LB | $3.00 | $2.50 | $2.75 | $2.34 | 4% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 9,180 LB | $3.00 | $2.50 | $2.75 | $2.34 | 4% |
| 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 151 CY | $150 | $110 | $130 | $160 | 3% |
| 517E70000 RAILING (TWIN STEEL TUBE) | 85 FT | $250 | $320 | $300 | $225 | 3% |
| 601E28101 DUMPED ROCK FILL, AS PER PLAN | 136 CY | $150 | $220 | $120 | $165 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,000 | $7,100 | $15,000 | $7,500 | 3% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 36 CY | $550 | $1,200 | $1,400 | $1,850 | 3% |
| 503E31100 ROCK EXCAVATION | 96 CY | $200 | $150 | $70.00 | $145 | 3% |
| 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL | 126 CY | $150 | $130 | $145 | $170 | 3% |
| 893 SY |
| $2.00 |
| $2.50 |
| $5.00 |
| $5.50 |
| 204E45000 PROOF ROLLING | 1 HOUR | $100 | $560 | $200 | $220 |
| 606E15050 GUARDRAIL, TYPE MGS | 50 FT | $75.00 | $25.00 | $28.00 | $30.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350) | 7 EACH | $2,300 | $3,300 | $2,900 | $2,750 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 8 EACH | $2,100 | $2,800 | $2,600 | $2,750 |
| 607E98000 FENCE, MISC.: 5-STRAND HIGH TENSILE | 117 FT | $35.00 | $40.00 | $45.00 | $30.00 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 10 CY | $150 | $1,500 | $150 | $220 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $25.00 | $500 | $150 | $100 |
| 659E00300 TOPSOIL | 116 CY | $50.00 | $20.00 | $50.00 | $70.00 |
| 659E10000 SEEDING AND MULCHING | 1,042 SY | $10.00 | $2.50 | $4.50 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 52 SY | $0.20 | $5.00 | $3.50 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.14 TON | $2,000 | $650 | $1,300 | $1,200 |
| 659E31000 LIME | 0.22 ACRE | $1,600 | $950 | $165 | $150 |
| 659E35000 WATER | 6 MGAL | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $10.00 | $35.00 | $25.00 | $22.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $10.00 | $35.00 | $25.00 | $22.00 |
| 611E01800 8" CONDUIT, TYPE B | 50 FT | $10.00 | $35.00 | $30.00 | $27.00 |
| 304E20000 AGGREGATE BASE | 125 CY | $150 | $130 | $145 | $150 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 15 EACH | $10.00 | $15.00 | $13.00 | $12.30 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 90 FT | $25.00 | $30.00 | $25.00 | $25.00 |
| 630E80100 SIGN, FLAT SHEET | 24 SF | $150 | $35.00 | $40.00 | $25.00 |
| 630E85200 REMOVAL OF GROUND MOUNTED SIGN AND DELIVERY | 5 EACH | $100 | $65.00 | $100 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 6 EACH | $50.00 | $25.00 | $40.00 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 341 SY | $2.00 | $3.00 | $6.50 | $5.65 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $12,500 | $19,000 | $13,500 | $30,000 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $10,000 | $13,000 | $30,000 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $10,000 | $18,000 | $36,500 | $40,000 |
| 507E00100 STEEL PILES HP10X42, FURNISHED | 250 FT | $60.00 | $30.00 | $45.00 | $26.00 |
| 507E00150 STEEL PILES HP10X42, DRIVEN | 200 FT | $30.00 | $30.00 | $23.00 | $55.00 |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 100 FT | $75.00 | $40.00 | $58.00 | $33.00 |
| 507E00250 STEEL PILES HP12X53, DRIVEN | 80 FT | $30.00 | $35.00 | $50.00 | $110 |
| 507E00410 STEEL PILES, MISC.: PILE SPLICING | 14 EACH | $100 | $150 | $450 | $125 |
| 512E10000 SEALING OF CONCRETE SURFACES | 112 SY | $50.00 | $25.00 | $30.00 | $20.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 73 SF | $25.00 | $2.50 | $8.00 | $8.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 43 FT | $25.00 | $20.00 | $45.00 | $55.00 |
| 516E41100 1/8" PREFORMED BEARING PAD, TYPE CDP | 8 EACH | $450 | $65.00 | $75.00 | $64.00 |
| 516E43200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY ( | 16 EACH | $450 | $170 | $225 | $215 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 21 CY | $150 | $250 | $200 | $220 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 152 FT | $40.00 | $15.00 | $32.00 | $16.25 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 85 FT | $25.00 | $10.00 | $10.00 | $12.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 30 FT | $25.00 | $20.00 | $10.00 | $11.00 |
| 601E34400 ROCK CHANNEL PROTECTION, WITH GROUT, TYPE A | 15 CY | $325 | $350 | $200 | $325 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $12,500 | $10,000 | $7,500 | $18,500 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,000 | $10,000 | $10,000 | $16,500 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $10,000 | $25,000 | $50,000 | $11,000 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 2 CY | $550 | $4,000 | $2,100 | $3,100 |
| 512E10000 SEALING OF CONCRETE SURFACES | 100 SY | $50.00 | $25.00 | $32.00 | $20.00 |
| 512E33000 TYPE 2 WATERPROOFING | 101 SY | $35.00 | $55.00 | $40.00 | $30.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 56 SF | $25.00 | $2.00 | $7.00 | $12.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 10 CY | $150 | $300 | $200 | $220 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 90 FT | $40.00 | $25.00 | $25.00 | $16.25 |
| 518E39800 4" PERFORATED CORRUGATED PLASTIC PIPE | 50 FT | $25.00 | $15.00 | $10.00 | $12.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $21,000 | $15,000 | $25,000 |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $26,000 | $40,000 | $65,740 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 17 FT | $4,775 | $81k | 8% |
| 515E12070 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM | 4 EACH | $19,500 | $78k | 8% |
| 511E34444 CLASS QC2 CONCRETE, BRIDGE DECK | 27 CY | $2,300 | $62k | 6% |
| 304E20000 AGGREGATE BASE | 407 CY | $150 | $61k | 6% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 79 CY | $550 | $43k | 4% |
| 511E50210 CLASS QC1 CONCRETE, SUBSTRUCTURE | 74 CY | $550 | $41k | 4% |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 178 CY | $195 | $35k | 3% |
| 615E10001 ROADS FOR MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $30,000 | $30k | 3% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $30,000 | $30k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $30k | 3% |