STA-Sippo Valley Trail Bridge 11
STA County · est $0.4M
Bid dateThursday, April 10—
STA County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 22 more items below.
| Item | Quantity | R1Stanley Miller Construction Company | R2Crawford Construction Company INC | R3Black Horse Bridge Construction INC | R4Eclipse CO LLC | R5Craig Edward Susany INC | % of bid |
|---|---|---|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $79,340 | $19,500 | $20,000 | $50,501 | $20,000 | 27% |
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 16 FT | $2,093 | $2,800 | $3,600 | $6,336 | $3,750 | 11% |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 33 CY | $780 | $1,200 | $950 | $2,399 | $1,000 | 9% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $23,944 | $17,900 | $32,000 | $40,800 | $100,000 | 8% |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 500 FT | $46.30 | $61.00 | $44.00 | $140 | $96.00 | 8% |
| 623E10000 |
| Item | Quantity | R1Stanley Miller Construction Company | R2Crawford Construction Company INC | R3Black Horse Bridge Construction INC | R4Eclipse CO LLC | R5Craig Edward Susany INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,670 | $5,600 | $5,200 | $5,500 | $5,000 |
| 202E23000 PAVEMENT REMOVED | 50 SY | $6.00 | $27.00 | $10.00 | $16.50 | $100 |
| 203E10000 EXCAVATION | 12 CY | $232 | $207 | $40.00 | $184 | $200 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 10 CY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $17,156 |
| $2,700 |
| $8,000 |
| $8,289 |
| $10,000 |
| 6% |
| 517E76300 RAILING, MISC.:TIMBER RAILING ON STEEL POSTS | 64.25 FT | $203 | $265 | $284 | $428 | $250 | 4% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $11,889 | $14,700 | $20,650 | $9,992 | $50,000 | 4% |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 450 FT | $26.00 | $7.00 | $40.00 | $136 | $55.00 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $7,556 | $7,900 | $51,500 | $55,622 | $50,000 | 3% |
| 203E20001 EMBANKMENT, AS PER PLAN | 72 CY | $101 | $80.00 | $125 | $118 | $200 | 2% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 3,670 LB | $1.90 | $3.50 | $4.00 | $7.50 | $4.00 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 5 CY | $1,250 | $5,230 | $710 | $710 | $2,500 | 2% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $4,889 | $34,600 | $20,520 | $18,980 | $178,000 | 2% |
| 523E20000 DYNAMIC LOAD TESTING | 1 EACH | $4,756 | $4,400 | $4,500 | $6,000 | $6,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,670 | $4,400 | $4,000 | $8,581 | $20,000 | 2% |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 16 CY | $285 | $450 | $180 | $323 | $250 | 2% |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 4 CY | $1,040 | $1,400 | $1,450 | $3,877 | $1,000 | 1% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 12 CY | $316 | $260 | $180 | $270 | $250 | 1% |
| 203E20000 EMBANKMENT | 25 CY | $147 | $175 | $22.00 | $223 | $200 | 1% |
| $267 |
| $306 |
| $120 |
| $333 |
| $200 |
| 204E10000 SUBGRADE COMPACTION | 62 SY | $5.00 | $5.70 | $10.00 | $10.00 | $25.00 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $1,755 | $970 | $2,000 | $3,500 | $500 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $1,200 | $1,700 | $2,500 | $3,500 | $10,000 |
| 659E00300 TOPSOIL | 6 CY | $63.00 | $355 | $140 | $258 | $200 |
| 659E10000 SEEDING AND MULCHING | 51 SY | $62.00 | $48.00 | $12.00 | $29.50 | $10.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.01 TON | $800 | $4,480 | $500 | $1,750 | $1,000 |
| 659E31000 LIME | 0.02 ACRE | $900 | $1,700 | $200 | $100 | $500 |
| 659E35000 WATER | 1 MGAL | $1.00 | $11.20 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 304E20000 AGGREGATE BASE | 10 CY | $261 | $306 | $150 | $278 | $200 |
| 407E10000 TACK COAT | 3 GAL | $2.25 | $5.50 | $10.00 | $10.00 | $10.00 |
| 408E10000 PRIME COAT | 20 GAL | $3.35 | $50.00 | $20.00 | $20.00 | $60.00 |
| 507E92200 PREBORED HOLES | 50 FT | $40.00 | $185 | $110 | $125 | $500 |
| 512E10000 SEALING OF CONCRETE SURFACES | 40 SY | $85.00 | $77.00 | $40.00 | $58.50 | $20.00 |
| 512E33000 TYPE 2 WATERPROOFING | 64 SY | $31.00 | $50.00 | $24.00 | $35.00 | $35.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 45 SF | $2.60 | $12.00 | $6.00 | $8.00 | $15.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,445 | $3,900 | $4,000 | $5,387 | $2,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $500 | $2,750 | $1,000 | $1,282 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $79,340 | $79k | 24% |
| 611E70000 CONDUIT, TYPE A, PRECAST REINFORCED CONCRETE THREE | 16 FT | $2,093 | $33k | 10% |
| 511E46210 CLASS QC1 CONCRETE, RETAINING/WINGWALL INCLUDING F | 33 CY | $780 | $26k | 8% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $23,944 | $24k | 7% |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 500 FT | $46.3 | $23k | 7% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $17,156 | $17k | 5% |
| 517E76300 RAILING, MISC.:TIMBER RAILING ON STEEL POSTS | 64.25 FT | $203 | $13k | 4% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $11,889 | $12k | 4% |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 450 FT | $26 | $12k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $7,556 | $8k | 2% |