ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 151 more items below.
| Item | Quantity | R1Shelly Company | R2Shelly & Sands INC | R3Trucco Construction CO INC | R4Strawser Paving CO INC | R5Complete General Construction Company | R6Danbert Incorporated | % of bid |
|---|---|---|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 9,779.5 CY | $137 | $169 | $137 | $165 | $137 | $147 | 21% |
| 203E10000 EXCAVATION | 16,829 CY | $42.25 | $28.50 | $31.00 | $24.00 | $20.00 | $33.45 | 11% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 12,286.9 SY | $51.00 | $65.00 | $83.97 |
| Item | Quantity | R1Shelly Company | R2Shelly & Sands INC | R3Trucco Construction CO INC | R4Strawser Paving CO INC | R5Complete General Construction Company | R6Danbert Incorporated |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $40,000 | $31,230 | $35,800 | $26,500 | $48,000 | $3,500 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 99 FT | $28.00 | $13.00 | $22.00 | $13.00 | $40.00 | $30.05 |
| 202E38000 GUARDRAIL REMOVED | 737 FT | $2.00 | $2.00 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $55.00 |
| $45.00 |
| $46.75 |
| 10% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,314.8 CY | $210 | $236 | $210 | $260 | $210 | $220 | 8% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (2439.6 CY | $165 | $190 | $165 | $195 | $165 | $175 | 6% |
| 304E20000 AGGREGATE BASE | 7,708.9 CY | $45.75 | $70.00 | $75.00 | $59.00 | $60.00 | $75.17 | 5% |
| 202E23000 PAVEMENT REMOVED | 42,055.3 SY | $7.05 | $5.00 | $8.50 | $9.25 | $16.00 | $9.31 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $292,000 | $175,000 | $203,000 | $300,000 | $250,000 | $306,254 | 5% |
| 206E10500 CEMENT | 1,339 TON | $205 | $205 | $205 | $205 | $205 | $214 | 4% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $230,000 | $140,000 | $215,000 | $280,000 | $275,000 | $526,510 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $200,000 | $275,000 | $200,000 | $200,000 | $424,000 | $232,660 | 3% |
| 611E94801 8' X 4' CONDUIT, TYPE A, 706.05, AS PER PLAN | 90 FT | $2,010 | $1,622 | $1,600 | $1,800 | $1,250 | $1,672 | 3% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 13,139 FT | $13.50 | $13.00 | $7.90 | $9.00 | $13.00 | $16.30 | 3% |
| 605E05100 4" SHALLOW PIPE UNDERDRAINS | 11,950 FT | $13.50 | $14.00 | $9.40 | $9.00 | $14.00 | $19.26 | 3% |
| 659E00300 TOPSOIL | 2,336 CY | $64.50 | $37.00 | $16.00 | $60.00 | $24.00 | $29.33 | 2% |
| 832E30000 EROSION CONTROL | 147,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 203E20000 EMBANKMENT | 4,474 CY | $30.00 | $11.50 | $6.70 | $8.50 | $9.00 | $22.62 | 2% |
| 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP | 45,098.2 SY | $2.63 | $2.63 | $3.80 | $2.63 | $4.72 | $2.75 | 2% |
| 611E04400 12" CONDUIT, TYPE B | 1,496 FT | $57.50 | $98.00 | $102 | $120 | $105 | $107 | 1% |
| 609E24510 CURB, TYPE 4-C | 3,447 FT | $19.50 | $21.00 | $27.00 | $22.00 | $22.00 | $34.41 | 1% |
| $2.00 |
| $2.00 |
| $3.00 |
| 202E52990 SPECIAL - PARKING BLOCK REMOVED | 8 EACH | $52.50 | $32.00 | $61.00 | $100 | $78.80 | $144 |
| 202E75000 FENCE REMOVED | 1,094 FT | $0.75 | $4.80 | $5.00 | $4.25 | $4.25 | $10.91 |
| 202E98100 REMOVAL MISC.: BIRD BATH | 1 EACH | $105 | $98.00 | $114 | $400 | $400 | $626 |
| 202E98100 REMOVAL MISC.: FLAG | 3 EACH | $35.00 | $32.00 | $38.00 | $150 | $62.00 | $438 |
| 202E98400 REMOVAL MISC.: LANDSCAPING REMOVAL | 4,041 SF | $0.45 | $0.50 | $2.80 | $0.25 | $2.50 | $1.34 |
| 204E10000 SUBGRADE COMPACTION | 1,141.9 SY | $3.65 | $2.75 | $4.20 | $1.00 | $4.00 | $5.36 |
| 204E13000 EXCAVATION OF SUBGRADE | 380.6 CY | $43.00 | $34.00 | $24.00 | $50.00 | $40.00 | $37.52 |
| 204E45000 PROOF ROLLING | 23 HOUR | $250 | $555 | $336 | $100 | $350 | $200 |
| 206E11000 CURING COAT | 45,098.2 SY | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 | $1.25 |
| 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS | 1 LS | $16,449 | $16,449 | $16,400 | $16,449 | $16,500 | $17,194 |
| 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING | 3.23 MILE | $1,725 | $3,000 | $1,660 | $300 | $6,200 | $3,054 |
| 606E15050 GUARDRAIL, TYPE MGS | 287.5 FT | $21.20 | $21.20 | $21.00 | $24.80 | $21.20 | $30.00 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 100 FT | $24.80 | $24.80 | $25.00 | $24.80 | $24.80 | $30.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(MASH 2016) | 4 EACH | $2,520 | $2,520 | $2,520 | $2,520 | $2,520 | $2,700 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,360 | $1,360 | $1,360 | $1,360 | $1,360 | $1,250 |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 4 EACH | $219 | $219 | $219 | $500 | $216 | $444 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $65,000 | $36,000 | $58,000 | $12,500 | $22,500 | $65,860 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 39.6 SY | $435 | $167 | $165 | $175 | $75.00 | $152 |
| 659E10000 SEEDING AND MULCHING | 21,040 SY | $0.77 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,052 SY | $0.73 | $0.80 | $1.20 | $0.80 | $0.80 | $0.80 |
| 659E15000 INTER-SEEDING | 1,052 SY | $0.73 | $0.80 | $1.20 | $0.80 | $0.80 | $0.80 |
| 659E20000 COMMERCIAL FERTILIZER | 2.84 TON | $898 | $1,250 | $1,430 | $1,250 | $1,250 | $1,250 |
| 659E31000 LIME | 4.35 ACRE | $155 | $150 | $820 | $150 | $150 | $150 |
| 659E35000 WATER | 57 MGAL | $1.00 | $1.00 | $140 | $1.00 | $1.00 | $1.00 |
| 659E40000 MOWING | 47 MSF | $25.00 | $50.00 | $72.00 | $50.00 | $50.00 | $50.00 |
| 660E25000 SODDING STAKED | 199 SY | $18.00 | $15.00 | $32.00 | $15.00 | $15.00 | $15.00 |
| 670E00500 SLOPE EROSION PROTECTION | 3,233 SY | $1.12 | $2.00 | $2.40 | $2.00 | $2.00 | $2.00 |
| 670E00700 DITCH EROSION PROTECTION | 1,172 SY | $1.15 | $2.00 | $2.40 | $2.00 | $2.00 | $2.00 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 598 SY | $1.15 | $2.00 | $2.40 | $2.00 | $2.00 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $4,135 | $4,500 | $4,140 | $6,000 | $6,000 | $6,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $7,080 | $19,000 | $17,300 | $31,500 | $31,500 | $31,500 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $15,045 | $15,000 | $21,000 | $15,044 | $15,043 | $5,000 |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 24 CY | $170 | $131 | $178 | $275 | $260 | $205 |
| 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA | 45 CY | $102 | $135 | $194 | $102 | $175 | $194 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 34 CY | $139 | $147 | $193 | $360 | $190 | $195 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 185 CY | $119 | $126 | $193 | $230 | $177 | $202 |
| 602E98300 MASONRY, MISC.:MASONRY COLLAR PER DM-1.1 | 2 EACH | $1,385 | $1,600 | $3,520 | $1,800 | $740 | $2,150 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 4,424 FT | $13.50 | $18.00 | $11.00 | $10.00 | $15.00 | $21.28 |
| 611E00400 4" CONDUIT, TYPE E | 50 FT | $25.00 | $18.00 | $13.00 | $40.00 | $35.00 | $66.48 |
| 611E00406 4" CONDUIT, TYPE F | 50 FT | $25.00 | $19.00 | $14.00 | $40.00 | $35.00 | $66.48 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 163 FT | $75.50 | $34.00 | $15.00 | $25.00 | $31.00 | $38.08 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 50 FT | $74.50 | $29.00 | $18.00 | $75.00 | $46.00 | $40.51 |
| 611E04900 12" CONDUIT, TYPE D | 20 FT | $47.50 | $74.00 | $207 | $130 | $93.01 | $122 |
| 611E05900 15" CONDUIT, TYPE B | 599 FT | $62.00 | $111 | $120 | $125 | $130 | $126 |
| 611E06100 15" CONDUIT, TYPE C | 108 FT | $67.50 | $104 | $83.00 | $130 | $109 | $96.22 |
| 611E08700 21" CONDUIT, TYPE A | 66 FT | $123 | $195 | $305 | $230 | $185 | $244 |
| 611E09400 21" CONDUIT, TYPE D | 23 FT | $84.00 | $192 | $205 | $200 | $145 | $175 |
| 611E10200 24" CONDUIT, TYPE A | 67 FT | $165 | $185 | $336 | $240 | $200 | $255 |
| 611E10400 24" CONDUIT, TYPE B | 59 FT | $93.00 | $170 | $308 | $150 | $185 | $221 |
| 611E10600 24" CONDUIT, TYPE C | 18 FT | $108 | $173 | $131 | $250 | $135 | $207 |
| 611E22200 54" CONDUIT, TYPE A | 70 FT | $465 | $740 | $600 | $500 | $477 | $819 |
| 611E96500 CONDUIT RECONSTRUCTED, 12" CMP | 5 FT | $315 | $319 | $870 | $315 | $145 | $1,534 |
| 611E98180 CATCH BASIN, NO. 3A | 18 EACH | $2,900 | $3,900 | $4,300 | $3,600 | $4,400 | $4,610 |
| 611E98370 CATCH BASIN, NO. 6 | 1 EACH | $2,750 | $3,600 | $3,820 | $3,500 | $4,500 | $7,153 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,675 | $3,580 | $8,100 | $3,400 | $3,800 | $3,588 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $2,975 | $3,900 | $4,770 | $3,500 | $5,000 | $6,403 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 10 EACH | $1,300 | $1,790 | $3,610 | $2,500 | $2,400 | $2,546 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 22 EACH | $330 | $575 | $411 | $700 | $511 | $478 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(1.5" MAX) | 11,038.9 SY | $2.90 | $4.50 | $3.10 | $3.00 | $3.05 | $3.05 |
| 407E20000 NON-TRACKING TACK COAT | 11,302 GAL | $4.05 | $3.25 | $4.10 | $3.00 | $4.05 | $4.05 |
| 625E75400 LIGHT POLE REMOVED | 4 EACH | $300 | $300 | $210 | $210 | $300 | $210 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $15,000 | $5,723 | $5,400 | $5,350 | $18,000 | $5,350 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 527.5 FT | $14.00 | $14.00 | $14.00 | $13.55 | $14.00 | $14.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 438 FT | $15.00 | $15.00 | $15.00 | $15.46 | $15.00 | $15.50 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 54 FT | $17.60 | $17.60 | $18.00 | $23.10 | $17.60 | $20.00 |
| 630E80100 SIGN, FLAT SHEET | 478.1 SF | $16.00 | $16.00 | $16.00 | $19.09 | $16.00 | $24.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 38 EACH | $10.00 | $10.00 | $10.00 | $16.56 | $10.00 | $25.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $65.00 | $65.00 | $65.00 | $61.15 | $65.00 | $150 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 40 EACH | $15.00 | $15.00 | $15.00 | $22.08 | $15.00 | $25.00 |
| 644E00104 EDGE LINE, 6" | 2.94 MILE | $4,725 | $4,725 | $4,730 | $4,170 | $4,725 | $4,170 |
| 644E00204 LANE LINE, 6" | 1.12 MILE | $2,250 | $2,250 | $2,250 | $1,970 | $2,250 | $1,970 |
| 644E00300 CENTER LINE | 2.19 MILE | $5,519 | $5,519 | $5,500 | $4,795 | $5,519 | $4,795 |
| 644E00400 CHANNELIZING LINE, 8" | 4,642 FT | $1.70 | $1.70 | $1.70 | $1.35 | $1.70 | $1.35 |
| 644E00500 STOP LINE | 396 FT | $8.80 | $8.80 | $8.80 | $5.05 | $8.80 | $5.05 |
| 644E01300 LANE ARROW | 72 EACH | $105 | $105 | $105 | $125 | $105 | $125 |
| 644E01510 DOTTED LINE, 6" | 1,256 FT | $0.90 | $0.90 | $0.90 | $1.20 | $0.90 | $1.20 |
| 625E18510 BRACKET ARM, 30' | 2 EACH | $2,750 | $2,674 | $2,670 | $2,676 | $2,750 | $2,675 |
| 625E25400 CONDUIT, 2", 725.04 | 13 FT | $32.00 | $46.50 | $46.00 | $46.35 | $32.00 | $46.35 |
| 625E25500 CONDUIT, 3", 725.04 | 72 FT | $39.50 | $40.75 | $41.00 | $40.76 | $39.50 | $40.76 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 2 EACH | $600 | $666 | $670 | $666 | $600 | $666 |
| 625E29000 TRENCH | 24 FT | $10.00 | $11.00 | $11.00 | $10.94 | $10.00 | $10.94 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,600 | $1,196 | $1,200 | $1,196 | $1,600 | $1,196 |
| 625E32000 GROUND ROD | 4 EACH | $325 | $356 | $356 | $356 | $325 | $356 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 24 FT | $1.00 | $0.25 | $0.20 | $0.22 | $1.00 | $0.22 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 6 EACH | $900 | $1,224 | $1,220 | $1,224 | $900 | $1,224 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 6 EACH | $1,600 | $1,884 | $1,880 | $1,884 | $1,600 | $1,884 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 12 EACH | $40.00 | $69.00 | $69.00 | $69.00 | $40.00 | $69.00 |
| 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES | 415 FT | $20.00 | $16.66 | $17.00 | $16.66 | $20.00 | $16.66 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 415 FT | $22.50 | $17.90 | $18.00 | $17.83 | $22.50 | $17.83 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,565 FT | $3.00 | $3.67 | $3.70 | $3.67 | $3.00 | $3.67 |
| 632E42300 SIGNAL CABLE, 3 CONDUCTOR, NO. 12 AWG | 690 FT | $2.50 | $3.10 | $3.10 | $3.10 | $2.50 | $3.10 |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $9,200 | $7,412 | $7,400 | $7,413 | $9,100 | $7,413 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 103 FT | $6.00 | $5.56 | $5.60 | $5.56 | $6.00 | $5.56 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 134 FT | $6.00 | $4.79 | $4.80 | $4.79 | $6.00 | $4.79 |
| 632E70000 POWER SERVICE | 1 EACH | $2,500 | $3,501 | $3,500 | $3,502 | $2,500 | $3,502 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 2 EACH | $1,000 | $982 | $980 | $982 | $1,000 | $982 |
| 632E86150 STRAIN POLE, TYPE TC-81.11, DESIGN 13 | 2 EACH | $15,100 | $15,909 | $15,900 | $15,909 | $15,100 | $15,909 |
| 632E87150 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 13 | 2 EACH | $16,500 | $17,759 | $17,800 | $17,759 | $16,500 | $17,759 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $3,000 | $1,575 | $1,580 | $1,575 | $3,000 | $1,575 |
| 632E90400 SIGNALIZATION, MISC.: CDMA MODEM, FURNISH ONLY | 1 EACH | $3,000 | $3,020 | $3,020 | $3,020 | $3,000 | $3,020 |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $17,600 | $17,234 | $17,200 | $17,234 | $17,600 | $17,234 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $4,400 | $3,302 | $3,300 | $3,302 | $4,400 | $3,302 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $2,200 | $535 | $540 | $535 | $2,200 | $535 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $7,200 | $7,671 | $7,700 | $7,671 | $7,200 | $7,671 |
| 633E99000 CONTROLLER ITEM, MISC.: ETHERNET RADIO (UBIQUITY) | 1 EACH | $1,400 | $1,522 | $1,520 | $1,522 | $1,400 | $1,522 |
| 633E99000 CONTROLLER ITEM, MISC.: UNMANAGED ETHERNET SWITCH | 1 EACH | $1,600 | $1,600 | $1,510 | $1,513 | $1,600 | $1,513 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 30 FT | $3.00 | $11.60 | $12.00 | $11.60 | $3.00 | $11.60 |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $8,300 | $8,935 | $8,900 | $8,935 | $8,750 | $8,935 |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $8,200 | $8,605 | $8,600 | $8,605 | $8,500 | $8,605 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $1,000 | $1,015 | $1,020 | $1,015 | $1,000 | $1,015 |
| 410E10001 TRAFFIC COMPACTED SURFACE, TYPE A, AS PER PLAN | 100 CY | $110 | $72.60 | $117 | $75.00 | $160 | $153 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $80.00 | $104 | $135 | $75.00 | $96.00 | $150 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,300 | $2,150 | $2,200 | $1,942 | $2,320 | $1,942 |
| 614E12420 DETOUR SIGNING | 1 LS | $16,000 | $12,000 | $17,200 | $9,716 | $83,000 | $9,716 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $250 | $225 | $269 | $150 | $400 | $150 |
| 614E12600 REPLACEMENT DRUM | 50 EACH | $55.00 | $48.50 | $59.00 | $54.99 | $80.00 | $54.99 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 80 EACH | $17.99 | $10.00 | $16.00 | $11.64 | $12.00 | $11.64 |
| 614E13360 OBJECT MARKER, TWO WAY | 80 EACH | $17.99 | $14.00 | $27.00 | $19.88 | $20.00 | $19.88 |
| 614E20000 WORK ZONE LANE LINE, CLASS I, 4" | 0.48 MILE | $785 | $575 | $790 | $375 | $785 | $375 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 3.35 MILE | $1,450 | $1,575 | $1,450 | $2,660 | $1,450 | $2,660 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 12.81 MILE | $785 | $900 | $790 | $1,500 | $785 | $1,500 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 971 FT | $0.95 | $0.55 | $1.00 | $0.75 | $0.95 | $0.75 |
| 614E24000 WORK ZONE DOTTED LINE, CLASS I | 1,734 FT | $0.80 | $0.50 | $0.80 | $0.65 | $0.80 | $0.65 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 423 FT | $3.50 | $3.50 | $3.50 | $4.00 | $3.50 | $4.00 |
| 614E30000 WORK ZONE ARROW, CLASS I | 8 EACH | $80.00 | $60.00 | $80.00 | $75.00 | $80.00 | $75.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 3,837 FT | $14.25 | $15.00 | $19.00 | $32.53 | $26.00 | $32.53 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 2.19 MILE | $980 | $1,275 | $980 | $1,050 | $980 | $1,050 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 2.94 MILE | $690 | $750 | $690 | $935 | $690 | $935 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 4,642 FT | $0.80 | $0.55 | $0.80 | $0.70 | $0.80 | $0.70 |
| 614E24612 WORK ZONE DOTTED LINE, CLASS III, 6", 642 PAINT | 1,256 FT | $0.80 | $0.45 | $0.80 | $0.60 | $0.80 | $0.60 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 396 FT | $3.75 | $4.00 | $3.80 | $3.95 | $3.75 | $3.95 |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $20,000 | $20,000 | $26,600 | $26,600 | $25,000 | $26,600 |
| 202E11000 STRUCTURE REMOVED | 1 LS | $25,000 | $20,000 | $17,400 | $25,000 | $50,000 | $22,713 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $12,000 | $38,000 | $40,300 | $12,000 | $10,000 | $23,123 |
| 503E21300 UNCLASSIFIED EXCAVATION (WINGWALL FOOTING) | 1 LS | $16,500 | $20,000 | $17,400 | $17,500 | $8,200 | $6,684 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 5,700 LB | $2.85 | $4.25 | $1.80 | $2.05 | $2.51 | $7.60 |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 17.4 CY | $1,730 | $4,000 | $2,650 | $1,800 | $2,400 | $3,420 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 43 CY | $1,025 | $986 | $1,040 | $985 | $650 | $741 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 3.6 CY | $2,850 | $3,077 | $3,270 | $2,200 | $4,500 | $2,915 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 61 SY | $31.00 | $65.00 | $65.00 | $29.00 | $40.00 | $65.00 |
| 512E33000 TYPE 2 WATERPROOFING | 163 SY | $20.00 | $26.00 | $26.00 | $20.00 | $25.00 | $32.55 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 28 SF | $18.00 | $1.50 | $6.00 | $18.00 | $15.00 | $22.86 |
| 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1 LS | $12,000 | $3,000 | $8,800 | $11,000 | $5,800 | $7,098 |
| 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN | 1 LS | $3,750 | $5,500 | $8,500 | $3,500 | $4,800 | $6,636 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 1.12 MILE | $625 | $665 | $630 | $470 | $625 | $470 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $30,000 | $35,000 | $42,000 | $45,500 | $45,000 | $99,057 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $4,500 | $5,700 | $4,170 | $3,500 | $2,500 | $3,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $60,000 | $82,731 | $68,000 | $50,000 | $126,000 | $53,200 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 9,779.5 CY | $137 | $1.34M | 17% |
| 203E10000 EXCAVATION | 16,829 CY | $42.25 | $711k | 9% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 12,286.9 SY | $51 | $627k | 8% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 2,314.8 CY | $210 | $486k | 6% |
| 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 446 (2439.6 CY | $165 | $403k | 5% |
| 304E20000 AGGREGATE BASE | 7,708.9 CY | $45.75 | $353k | 4% |
| 202E23000 PAVEMENT REMOVED | 42,055.3 SY | $7.05 | $296k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $292,000 | $292k | 4% |
| 206E10500 CEMENT | 1,339 TON | $205.15 | $275k | 3% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $230,000 | $230k | 3% |