CLA-/MOT CR/BH FY26
CLA County · est $0.3M
Bid dateThursday, July 31—
CLA County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 26 more items below.
| Item | Quantity | R1Sunesis Construction CO | R2Complete General Construction Company | R3John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $53,585 | $75,000 | $32,500 | 17% |
| 611E52700 29" X 45" CONDUIT, TYPE A, 706.04 | 70 FT | $588 | $1,900 | $821 | 13% |
| 602E97000 MASONRY, MISC.:REPOINT EXISTING STONE ABUTMENTS | 416 SF | $69.98 | $70.00 | $40.27 | 9% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 21 CY | $1,059 | $1,050 | $1,050 | 7% |
| 601E11001 RIPRAP, TYPE D, AS PER PLAN | 35 SY | $566 | $925 | $1,822 | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 10 CY | $1,835 | $1,835 | $1,835 | 6% |
| 304E20000 |
| Item | Quantity | R1Sunesis Construction CO | R2Complete General Construction Company | R3John R Jurgensen Company |
|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 2 EACH | $323 | $5,000 | $1,390 |
| 202E23000 PAVEMENT REMOVED | 124 SY | $22.80 | $30.00 | $16.18 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 8 FT | $24.45 | $125 | $121 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 25 FT | $93.16 | $160 | $86.98 |
| 204E10000 SUBGRADE COMPACTION | 124 SY | $5.75 | $5.00 | $7.35 |
| 601E32205 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 30 CY |
| $493 |
| $160 |
| $4,282 |
| 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,710 | $45,000 | $23,427 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $12,444 | $25,000 | $19,954 | 4% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $11,096 | $4,000 | $69,519 | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $10,924 | $25,000 | $5,125 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,203 | $25,000 | $13,271 | 3% |
| 203E10000 EXCAVATION | 313 CY | $31.04 | $35.00 | $60.00 | 3% |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 50 FT | $185 | $100 | $209 | 3% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 35 SF | $254 | $350 | $538 | 3% |
| 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN | 35 SF | $251 | $350 | $538 | 3% |
| 203E20000 EMBANKMENT | 313 CY | $26.60 | $40.00 | $60.00 | 3% |
| 601E32105 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 28 CY | $270 | $190 | $347 | 2% |
| 602E20000 CONCRETE MASONRY | 1 CY | $5,847 | $5,000 | $5,992 | 2% |
| 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, 2.5' X 2 | 40 FT | $130 | $600 | $129 | 2% |
| 6 CY |
| $752 |
| $200 |
| $622 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $400 | $75.00 |
| 659E00300 TOPSOIL | 13 CY | $155 | $60.00 | $100 |
| 659E10000 SEEDING AND MULCHING | 115 SY | $30.14 | $26.50 | $25.65 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $900 | $1,150 | $1,750 |
| 659E31000 LIME | 0.02 ACRE | $10.00 | $175 | $100 |
| 659E35000 WATER | 1 MGAL | $10.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 304E20000 AGGREGATE BASE | 21 CY | $151 | $160 | $254 |
| 407E20000 NON-TRACKING TACK COAT | 14 GAL | $10.00 | $10.00 | $10.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.01 MILE | $79,900 | $105,100 | $79,900 |
| 642E00300 CENTER LINE, TYPE 1 | 0.01 MILE | $159,800 | $140,135 | $159,800 |
| 614E12420 DETOUR SIGNING | 1 LS | $4,670 | $5,500 | $4,670 |
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $1,624 | $50,000 | $9,223 |
| 509E20001 CONCRETE REINFORCEMENT, REPLACEMENT OF EXISTING CO | 17 LB | $45.06 | $15.00 | $29.04 |
| 511E45710 CLASS QC1 CONCRETE, ABUTMENT | 1 CY | $2,525 | $5,000 | $4,025 |
| 843E50000 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA | 19 SF | $191 | $275 | $1,366 |
| 844E20001 GALVANIC ANODE PROTECTION, AS PER PLAN | 16 EACH | $67.02 | $60.00 | $820 |
| 844E20001 GALVANIC ANODE PROTECTION, AS PER PLAN | 12 EACH | $72.69 | $60.00 | $1,009 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,632 | $8,000 | $3,804 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,200 | $23,000 | $3,292 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $53,585 | $54k | 15% |
| 611E52700 29" X 45" CONDUIT, TYPE A, 706.04 | 70 FT | $587.7 | $41k | 11% |
| 602E97000 MASONRY, MISC.:REPOINT EXISTING STONE ABUTMENTS | 416 SF | $69.98 | $29k | 8% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 21 CY | $1,059 | $22k | 6% |
| 601E11001 RIPRAP, TYPE D, AS PER PLAN | 35 SY | $565.94 | $20k | 5% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 10 CY | $1,835 | $18k | 5% |
| 304E20000 AGGREGATE BASE | 30 CY | $493.17 | $15k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $12,710 | $13k | 3% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $12,444 | $12k | 3% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $11,096 | $11k | 3% |