| Item | Quantity | R1Miller Bros Const INC | R2Double Z Construction Company | R3D G M INC | R4Alan Stone CO INC | R5George J Igel & CO INC | R6Shelly & Sands INC | R7Complete General Construction Company | R8Ruhlin Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 131 CY | $1,786 | $1,750 | $1,445 | $1,850 | $1,820 | $1,850 | $1,700 | $2,190 | 17% |
| 515E15010 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $42,370 | $46,500 | $60,000 | $55,000 | $49,900 |
| Item | Quantity | R1Miller Bros Const INC | R2Double Z Construction Company | R3D G M INC | R4Alan Stone CO INC | R5George J Igel & CO INC | R6Shelly & Sands INC | R7Complete General Construction Company | R8Ruhlin Company |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,296 | $28,000 | $13,000 | $15,000 | $42,000 | $39,000 | $10,000 | $15,000 |
| 202E23000 PAVEMENT REMOVED | 854 SY | $21.03 | $18.00 | $12.50 | $15.00 | $13.00 | $17.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $53,000 |
| $48,000 |
| $75,100 |
| 16% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 146 CY | $881 | $910 | $670 | $800 | $965 | $980 | $1,000 | $1,220 | 10% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $89,824 | $100,000 | $130,000 | $90,000 | $160,000 | $105,000 | $220,000 | $369,260 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $82,450 | $40,000 | $40,000 | $45,000 | $90,000 | $95,500 | $100,000 | $100,000 | 6% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 182 FT | $450 | $450 | $465 | $460 | $456 | $450 | $443 | $478 | 6% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 47,263 LB | $1.68 | $1.50 | $1.40 | $1.90 | $1.70 | $1.90 | $2.15 | $2.56 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $71,855 | $70,000 | $82,500 | $77,000 | $78,000 | $51,000 | $50,000 | $126,500 | 5% |
| 526E15010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 161 SY | $406 | $390 | $387 | $500 | $465 | $500 | $480 | $615 | 5% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 372 SY | $154 | $155 | $110 | $137 | $135 | $115 | $180 | $111 | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 182 CY | $205 | $205 | $215 | $298 | $205 | $205 | $205 | $345 | 3% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $27,337 | $25,000 | $8,000 | $15,000 | $40,000 | $21,000 | $25,000 | $30,590 | 2% |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $6,782 | $2,000 | $750 | $1,500 | $1,825 | $5,000 | $2,800 | $2,690 | 2% |
| 518E21201 POROUS BACKFILL WITH GEOTEXTILE FABRIC, AS PER PLA | 352 CY | $73.04 | $85.00 | $95.00 | $50.00 | $105 | $100 | $90.00 | $150 | 2% |
| 507E92201 PREBORED HOLES, AS PER PLAN | 205 FT | $115 | $250 | $250 | $125 | $195 | $350 | $80.00 | $285 | 2% |
| 507E00101 STEEL PILES HP10X42, FURNISHED, AS PER PLAN | 400 FT | $57.33 | $38.00 | $38.00 | $40.00 | $37.00 | $29.85 | $74.00 | $47.00 | 2% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 71 CY | $305 | $305 | $315 | $400 | $305 | $305 | $305 | $465 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 950 FT | $22.35 | $28.00 | $20.00 | $18.00 | $29.00 | $28.00 | $30.00 | $33.00 | 2% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $20,211 | $33,000 | $67,500 | $8,000 | $16,000 | $100,000 | $50,000 | $20,240 | 1% |
| 203E10000 EXCAVATION | 486 CY | $39.30 | $10.00 | $25.00 | $45.00 | $20.50 | $36.01 | $35.00 | $44.00 | 1% |
| $19.00 |
| $43.50 |
| 202E38000 GUARDRAIL REMOVED | 606 FT | $10.00 | $10.00 | $1.00 | $8.00 | $5.50 | $3.50 | $4.00 | $10.00 |
| 203E20000 EMBANKMENT | 486 CY | $29.87 | $30.00 | $25.00 | $20.00 | $9.75 | $18.00 | $38.00 | $32.00 |
| 204E10000 SUBGRADE COMPACTION | 1,105 SY | $3.62 | $10.00 | $5.00 | $6.00 | $5.00 | $6.50 | $4.50 | $13.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $267 | $150 | $75.00 | $280 | $132 | $225 | $160 | $1,740 |
| 606E15050 GUARDRAIL, TYPE MGS | 175 FT | $33.00 | $33.00 | $37.50 | $40.00 | $33.00 | $21.50 | $37.38 | $33.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 / MASH 2016 | 4 EACH | $3,150 | $3,150 | $3,250 | $3,700 | $3,150 | $2,500 | $2,300 | $3,150 |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 4 EACH | $2,925 | $2,925 | $3,000 | $3,500 | $2,925 | $2,600 | $2,200 | $2,925 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 144 CY | $129 | $77.00 | $100 | $120 | $118 | $98.00 | $110 | $215 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $25.00 | $150 | $50.00 | $180 | $25.00 | $150 | $25.00 | $25.00 |
| 659E00300 TOPSOIL | 85 CY | $42.56 | $55.00 | $20.00 | $40.00 | $13.25 | $40.00 | $45.00 | $60.00 |
| 659E10000 SEEDING AND MULCHING | 765 SY | $3.50 | $10.00 | $7.00 | $4.00 | $6.00 | $4.00 | $3.50 | $3.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 38 SY | $1.00 | $4.00 | $0.05 | $15.00 | $1.00 | $4.00 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $800 | $1,250 | $1,500 | $660 | $800 | $1,250 | $800 | $800 |
| 659E31000 LIME | 0.16 ACRE | $100 | $150 | $300 | $950 | $100 | $150 | $100 | $100 |
| 659E35000 WATER | 4 MGAL | $30.00 | $1.00 | $1.00 | $120 | $30.00 | $1.00 | $30.00 | $30.00 |
| 832E30000 EROSION CONTROL | 1,445 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 134 FT | $23.91 | $18.00 | $25.00 | $34.66 | $37.00 | $20.00 | $19.00 | $31.00 |
| 611E01400 6" CONDUIT, TYPE E | 50 FT | $32.21 | $6.00 | $8.00 | $24.82 | $31.50 | $10.00 | $30.00 | $33.00 |
| 611E01500 6" CONDUIT, TYPE F | 50 FT | $37.78 | $6.00 | $8.00 | $32.45 | $31.50 | $7.50 | $35.00 | $33.00 |
| 611E01800 8" CONDUIT, TYPE B | 50 FT | $54.04 | $12.00 | $10.00 | $26.74 | $40.00 | $12.00 | $33.00 | $55.00 |
| 304E20000 AGGREGATE BASE | 184 CY | $78.74 | $98.00 | $100 | $106 | $69.70 | $125 | $125 | $210 |
| 407E10000 TACK COAT | 154 GAL | $3.50 | $3.50 | $3.50 | $6.44 | $3.50 | $3.50 | $3.50 | $4.50 |
| 618E41000 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 0.51 MILE | $18,663 | $12,100 | $15,000 | $19,000 | $12,100 | $12,100 | $8,000 | $12,100 |
| 621E00100 RPM | 11 EACH | $375 | $275 | $275 | $325 | $275 | $275 | $275 | $275 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 11 EACH | $23.97 | $6.00 | $1.00 | $20.00 | $20.00 | $10.00 | $20.00 | $10.50 |
| 626E00112 BARRIER REFLECTOR, TYPE 3, BIDIRECTIONAL | 10 EACH | $13.00 | $13.00 | $15.00 | $13.00 | $13.00 | $12.00 | $12.00 | $13.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.24 MILE | $3,550 | $3,550 | $3,750 | $4,000 | $3,550 | $3,550 | $3,550 | $3,550 |
| 642E00300 CENTER LINE, TYPE 1 | 0.18 MILE | $4,595 | $4,595 | $4,750 | $4,500 | $4,595 | $4,595 | $4,595 | $4,595 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1 1/4") | 600 SY | $14.60 | $10.00 | $15.00 | $25.00 | $6.75 | $13.75 | $13.75 | $9.00 |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 21 CY | $440 | $375 | $460 | $420 | $525 | $440 | $440 | $680 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 72 HOUR | $104 | $60.00 | $60.00 | $95.00 | $100 | $110 | $90.00 | $100 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $3,500 | $3,500 | $2,500 | $2,500 | $3,500 | $2,200 | $3,500 | $3,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (TWO-WAY) | 12 EACH | $50.00 | $50.00 | $50.00 | $60.00 | $16.00 | $7.00 | $50.00 | $50.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 12 EACH | $50.00 | $50.00 | $50.00 | $60.00 | $26.00 | $24.00 | $50.00 | $50.00 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.43 MILE | $4,250 | $4,250 | $4,500 | $5,000 | $10,450 | $4,250 | $4,250 | $4,250 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 44 FT | $12.00 | $12.00 | $12.00 | $15.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| 616E10000 WATER | 3 MGAL | $99.24 | $50.00 | $1.00 | $1.00 | $45.50 | $74.00 | $200 | $40.00 |
| 202E22900 APPROACH SLAB REMOVED | 212 SY | $59.32 | $50.00 | $35.00 | $75.00 | $45.00 | $30.00 | $55.00 | $61.00 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 324 SY | $26.55 | $30.00 | $35.00 | $48.00 | $30.00 | $30.00 | $30.00 | $42.00 |
| 515E20000 INTERMEDIATE DIAPHRAGMS | 4 EACH | $2,925 | $2,300 | $2,770 | $7,500 | $3,500 | $4,500 | $4,400 | $5,960 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 79 SF | $5.27 | $12.00 | $12.00 | $6.00 | $8.00 | $6.00 | $10.00 | $17.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 82 SF | $6.72 | $14.00 | $15.00 | $2.00 | $9.25 | $7.00 | $12.00 | $19.00 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 65 SF | $7.83 | $18.00 | $20.00 | $2.50 | $14.00 | $10.00 | $13.00 | $26.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 105 FT | $29.86 | $30.00 | $47.50 | $30.00 | $36.00 | $50.00 | $50.00 | $85.00 |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 10 EACH | $1,874 | $1,800 | $2,000 | $2,253 | $2,900 | $1,650 | $1,600 | $2,960 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 147 FT | $10.60 | $15.00 | $20.00 | $15.00 | $9.50 | $7.00 | $9.00 | $23.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $20.17 | $18.00 | $20.00 | $15.00 | $40.00 | $9.00 | $15.00 | $33.00 |
| 526E90010 TYPE A INSTALLATION | 72 FT | $190 | $275 | $280 | $325 | $325 | $245 | $280 | $295 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $18,500 | $10,000 | $23,000 | $18,000 | $18,500 | $21,000 | $18,000 | $6,000 |
| 202E23500 WEARING COURSE REMOVED | 622 SY | $8.22 | $18.00 | $10.00 | $5.00 | $11.00 | $12.00 | $16.00 | $13.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,016 | $10,700 | $41,000 | $15,000 | $9,000 | $10,800 | $12,000 | $8,666 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,000 | $18,000 | $7,000 | $25,000 | $12,000 | $12,000 | $24,000 | $17,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 131 CY | $1,786 | $234k | 14% |
| 515E15010 DRAPED STRAND PRESTRESSED CONCRETE BRIDGE I-BEAM M | 5 EACH | $42,370 | $212k | 13% |
| 511E43512 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT INCLUDING | 146 CY | $880.67 | $129k | 8% |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $89,824 | $90k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $82,450 | $82k | 5% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 182 FT | $449.5 | $82k | 5% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 47,263 LB | $1.68 | $79k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $71,855 | $72k | 4% |
| 526E15010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 161 SY | $406.05 | $65k | 4% |
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 372 SY | $153.57 | $57k | 3% |