AUG-SR 219-09.27
AUG County · est $1.3M
Bid dateThursday, October 9—
AUG County · est $1.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 45 more items below.
| Item | Quantity | R1Jutte Excavating INC | R2Miller Bros Const INC | R3Brumbaugh Construction INC | R4Eagle Bridge CO | R5Complete General Construction Company | % of bid |
|---|---|---|---|---|---|---|---|
| 511E32212 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 197 CY | $1,220 | $1,235 | $1,400 | $1,375 | $1,450 | 28% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $90,750 | $20,520 | $20,000 | $25,000 | $35,000 | 10% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 186 FT | $484 | $460 | $475 | $460 | $500 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $79,500 | $47,607 | $28,342 | $31,000 | $62,000 | 9% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 43,436 LB | $1.40 | $1.75 | $1.65 | $1.90 | $1.75 | 7% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING |
| Item | Quantity | R1Jutte Excavating INC | R2Miller Bros Const INC | R3Brumbaugh Construction INC | R4Eagle Bridge CO | R5Complete General Construction Company |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1.00 | $1,126 | $2,000 | $250 | $5,000 |
| 202E23000 PAVEMENT REMOVED | 71 SY | $4.60 | $35.17 | $13.00 | $35.00 | $95.00 |
| 202E23500 WEARING COURSE REMOVED | 727 SY | $4.60 | $10.10 | $6.00 | $20.00 | $30.00 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 600 FT | $2.40 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 64 CY |
| $877 |
| $792 |
| $850 |
| $700 |
| $1,600 |
| 6% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 33,678 LB | $1.00 | $1.37 | $1.15 | $1.60 | $1.75 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $1,649 | $1,000 | $2,500 | $5,000 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $28,000 | $11,500 | $10,000 | $6,500 | $7,000 | 3% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $25,375 | $40,728 | $75,000 | $45,000 | $70,000 | 3% |
| 507E00751 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 660 FT | $35.00 | $66.41 | $82.00 | $85.00 | $45.00 | 3% |
| 526E15011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 160 SY | $128 | $189 | $250 | $200 | $250 | 2% |
| 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI | 640 FT | $27.25 | $44.39 | $52.00 | $65.00 | $35.00 | 2% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 17 CY | $670 | $610 | $690 | $610 | $610 | 1% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 170 CY | $60.00 | $110 | $95.00 | $70.00 | $95.00 | 1% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 16 CY | $630 | $515 | $650 | $515 | $515 | 1% |
| 202E22900 APPROACH SLAB REMOVED | 112 SY | $90.00 | $52.27 | $70.00 | $45.00 | $60.00 | 1% |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $10,000 | $15,429 | $7,500 | $25,000 | $45,000 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 4 EACH | $2,425 | $2,850 | $2,900 | $2,850 | $2,425 | 1% |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 4 EACH | $2,360 | $2,675 | $2,800 | $2,675 | $2,360 | 1% |
| $4.00 |
| $6.00 |
| $4.00 |
| $2.40 |
| 202E98100 REMOVAL MISC.: REMOVAL OF BRIDGE ID SIGN AND REERE | 1 EACH | $165 | $20.00 | $125 | $25.00 | $165 |
| 203E10000 EXCAVATION | 24 CY | $6.00 | $47.85 | $20.00 | $20.00 | $75.00 |
| 203E40000 BORROW | 12 CY | $30.00 | $71.06 | $20.00 | $50.00 | $90.00 |
| 204E10000 SUBGRADE COMPACTION | 227 SY | $4.00 | $5.92 | $1.20 | $10.00 | $25.00 |
| 209E60200 LINEAR GRADING | 6 STA | $100 | $108 | $450 | $50.00 | $55.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 225 FT | $20.80 | $21.00 | $22.00 | $21.00 | $20.80 |
| 659E10000 SEEDING AND MULCHING | 1,400 SY | $3.95 | $2.40 | $3.00 | $3.00 | $2.80 |
| 659E14000 REPAIR SEEDING AND MULCHING | 70 SY | $1.90 | $2.40 | $1.00 | $1.50 | $8.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.19 TON | $600 | $850 | $900 | $1,000 | $800 |
| 659E35000 WATER | 8 MGAL | $1.00 | $1.00 | $5.00 | $10.00 | $10.00 |
| 832E30000 EROSION CONTROL | 8,900 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 32 FT | $25.00 | $21.02 | $20.00 | $20.00 | $40.00 |
| 304E20000 AGGREGATE BASE | 39 CY | $75.00 | $100 | $65.00 | $135 | $250 |
| 407E10000 TACK COAT | 34 GAL | $35.00 | $1.00 | $10.00 | $1.00 | $1.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $5.00 | $20.72 | $50.00 | $25.00 | $75.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BIDIRECTIONAL) | 8 EACH | $12.00 | $13.00 | $15.00 | $13.00 | $12.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 10 FT | $50.00 | $18.00 | $12.00 | $18.00 | $50.00 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 1 SF | $65.00 | $20.00 | $125 | $20.00 | $65.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $60.00 | $55.00 | $100 | $55.00 | $60.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $15.00 | $30.00 | $50.00 | $30.00 | $15.00 |
| 646E10010 EDGE LINE, 6" | 0.1 MILE | $22,695 | $38,570 | $25,000 | $22,695 | $38,570 |
| 646E10200 CENTER LINE | 0.05 MILE | $24,805 | $37,400 | $25,000 | $24,805 | $37,400 |
| 614E12420 DETOUR SIGNING | 1 LS | $7,143 | $5,945 | $7,500 | $7,500 | $6,000 |
| 202E38500 BRIDGE RAILING REMOVED | 187.5 FT | $5.00 | $4.00 | $12.00 | $15.00 | $4.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $1.00 | $1.00 | $15,000 | $37,500 | $50,000 |
| 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 560 FT | $2.00 | $27.37 | $5.00 | $5.00 | $50.00 |
| 507E00700 16" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE | 600 FT | $2.00 | $25.55 | $6.00 | $6.00 | $40.00 |
| 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER | 60 SF | $3.00 | $6.06 | $3.00 | $6.00 | $20.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 85 SF | $3.00 | $6.51 | $5.00 | $7.00 | $15.00 |
| 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 75 FT | $15.00 | $36.02 | $25.00 | $45.00 | $46.50 |
| 516E31011 2" DEEP JOINT SEALER, AS PER PLAN | 75 FT | $35.00 | $4.89 | $10.00 | $22.00 | $35.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 52 CY | $54.00 | $135 | $60.00 | $115 | $195 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 209 FT | $12.00 | $17.48 | $14.00 | $19.00 | $16.25 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 110 FT | $10.00 | $10.58 | $10.00 | $12.00 | $15.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 60 FT | $10.00 | $20.24 | $10.00 | $18.00 | $20.00 |
| 523E20000 DYNAMIC LOAD TESTING | 2 EACH | $3,500 | $5,081 | $3,800 | $5,000 | $12,000 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 8 SY | $60.00 | $165 | $150 | $135 | $150 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $250 | $442 | $225 | $325 | $600 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $900 | $15,250 | $12,000 | $4,000 | $10,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $4,639 | $25,000 | $15,000 | $8,000 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $3,000 | $4,118 | $1,000 | $1,750 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E32212 CLASS QC2 CONCRETE WITH QC/QA, SUPERSTRUCTURE | 197 CY | $1,220 | $240k | 25% |
| 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION | 1 LS | $90,750 | $91k | 10% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 186 FT | $484 | $90k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $79,500 | $80k | 8% |
| 509E26000 GALVANIZED STEEL REINFORCEMENT | 43,436 LB | $1.4 | $61k | 6% |
| 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING | 64 CY | $877.3 | $56k | 6% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 33,678 LB | $1 | $34k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $30k | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $28,000 | $28k | 3% |
| 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $25,375 | $25k | 3% |