| Item | Quantity | R1Bcc Ohio INC | R2Jtm Smith Construction INC | R3Fillmore Construction | R4Rack & Ballauer Excavating CO INC | R5Axis Civil Construction LLC | R6Barrett Paving Materials INC | R7Sunesis Construction CO | R8Eagle Bridge CO | R9Prus Construction Company | R10John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 611E25000 66" CONDUIT, TYPE A, 707.02 ALUMINIZED, 706.02, 70 | 90 FT | $709 | $814 | $500 | $650 | $770 | $650 | $658 | $525 | $657 | $1,058 | 24% |
| Item | Quantity | R1Bcc Ohio INC | R2Jtm Smith Construction INC | R3Fillmore Construction | R4Rack & Ballauer Excavating CO INC | R5Axis Civil Construction LLC | R6Barrett Paving Materials INC | R7Sunesis Construction CO | R8Eagle Bridge CO | R9Prus Construction Company | R10John R Jurgensen Company |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 2 EACH | $774 | $3,000 | $2,500 | $1,000 | $1,800 | $2,000 | $691 | $540 | $1,130 | $1,816 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 602E20000 CONCRETE MASONRY |
| 34 CY |
| $1,560 |
| $1,152 |
| $1,500 |
| $1,850 |
| $1,850 |
| $1,800 |
| $1,932 |
| $2,500 |
| $2,535 |
| $2,273 |
| 20% |
| 624E10000 MOBILIZATION | 1 LS | $21,592 | $4,600 | $5,000 | $30,000 | $25,000 | $10,000 | $37,193 | $22,000 | $10,000 | $25,000 | 8% |
| 203E20000 EMBANKMENT | 347 CY | $48.87 | $48.00 | $68.00 | $40.00 | $42.00 | $40.00 | $62.02 | $50.00 | $47.50 | $65.39 | 6% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN, 73"x55 | 68 FT | $208 | $520 | $500 | $225 | $195 | $295 | $427 | $450 | $465 | $435 | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 20 CY | $630 | $435 | $400 | $365 | $500 | $1,225 | $461 | $795 | $515 | $1,200 | 5% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 17 CY | $735 | $511 | $500 | $645 | $600 | $1,250 | $531 | $800 | $605 | $1,500 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,746 | $4,850 | $7,500 | $20,000 | $15,000 | $12,500 | $10,942 | $22,500 | $24,450 | $52,694 | 4% |
| 601E11000 RIPRAP, TYPE D | 18.5 SY | $516 | $114 | $100 | $315 | $275 | $225 | $583 | $600 | $545 | $540 | 4% |
| 659E10000 SEEDING AND MULCHING | 2,510 SY | $3.62 | $3.50 | $1.45 | $3.60 | $2.35 | $1.73 | $2.50 | $3.50 | $2.00 | $1.73 | 3% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 38.3 CY | $174 | $210 | $140 | $270 | $190 | $150 | $233 | $135 | $290 | $609 | 2% |
| 832E30000 EROSION CONTROL | 6,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $5,916 | $3,300 | $6,600 | $10,000 | $7,700 | $6,595 | $10,443 | $10,000 | $7,800 | $6,595 | 2% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $5,385 | $8,000 | $5,000 | $8,200 | $12,000 | $5,000 | $11,655 | $12,000 | $23,850 | $3,556 | 2% |
| 659E00300 TOPSOIL | 279 CY | $17.69 | $50.00 | $50.00 | $80.00 | $55.00 | $68.00 | $14.93 | $15.00 | $75.00 | $45.09 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 125 SY | $29.11 | $21.00 | $50.00 | $30.00 | $35.60 | $50.00 | $22.45 | $21.00 | $25.00 | $55.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,627 | $4,850 | $5,000 | $4,000 | $3,500 | $1,906 | $3,089 | $7,500 | $2,600 | $4,432 | 1% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, CL | 1 LS | $3,242 | $1,500 | $10,000 | $1,000 | $12,000 | $12,000 | $28,398 | $15,000 | $19,500 | $15,539 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,096 | $4,200 | $7,000 | $19,000 | $12,000 | $25,000 | $7,000 | $50,000 | $26,500 | $23,048 | 1% |
| 304E20000 AGGREGATE BASE | 14 CY | $221 | $170 | $200 | $168 | $195 | $150 | $230 | $200 | $210 | $387 | 1% |
| 75 SY |
| $13.76 |
| $30.00 |
| $10.00 |
| $30.00 |
| $18.50 |
| $25.00 |
| $25.63 |
| $40.00 |
| $44.25 |
| $48.30 |
| 202E70130 SPECIAL - PIPE CLEANOUT OVER 48" | 68 FT | $28.46 | $100 | $120 | $80.00 | $100 | $100 | $90.74 | $125 | $151 | $207 |
| 203E10000 EXCAVATION | 98 CY | $12.90 | $42.00 | $52.00 | $40.00 | $38.00 | $60.00 | $26.78 | $65.00 | $56.50 | $40.13 |
| 204E10000 SUBGRADE COMPACTION | 82 SY | $3.87 | $20.00 | $10.00 | $7.00 | $4.00 | $25.00 | $9.42 | $15.00 | $7.25 | $5.81 |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, CL | 1 LS | $2,642 | $1,500 | $10,000 | $500 | $6,500 | $8,000 | $29,328 | $1,500 | $13,000 | $1,500 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 4 EACH | $761 | $1,050 | $500 | $780 | $500 | $1,100 | $1,106 | $725 | $625 | $880 |
| 659E20000 COMMERCIAL FERTILIZER | 0.34 TON | $341 | $600 | $1,400 | $1,140 | $1,500 | $900 | $1,400 | $1,500 | $1,065 | $900 |
| 659E31000 LIME | 0.52 ACRE | $26.25 | $400 | $450 | $200 | $200 | $100 | $450 | $5.00 | $118 | $100 |
| 659E35000 WATER | 13.6 MGAL | $1.05 | $1.00 | $1.00 | $1.00 | $1.00 | $13.60 | $50.00 | $10.00 | $1.25 | $13.60 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 102 SY | $4.41 | $31.00 | $2.00 | $4.55 | $2.75 | $5.75 | $7.00 | $10.00 | $7.00 | $5.75 |
| 611E97700 CONDUIT, MISC.: CMP REPAIR METHOD A | 68 SF | $44.40 | $118 | $500 | $95.00 | $155 | $100 | $182 | $150 | $276 | $130 |
| 611E97700 CONDUIT, MISC.: CMP REPAIR METHOD B | 12 SF | $42.76 | $125 | $1,000 | $123 | $480 | $150 | $1,012 | $90.00 | $815 | $80.00 |
| 407E10000 TACK COAT | 23 GAL | $1.05 | $24.00 | $10.00 | $4.00 | $6.00 | $4.00 | $23.62 | $5.00 | $30.00 | $10.00 |
| 621E00100 RPM | 1 EACH | $242 | $900 | $935 | $1,500 | $850 | $500 | $1,500 | $850 | $1,005 | $850 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 1 EACH | $20.64 | $100 | $25.00 | $20.00 | $50.00 | $10.00 | $65.76 | $40.00 | $100 | $159 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.02 MILE | $67,200 | $70,000 | $70,400 | $30,000 | $64,000 | $75,000 | $30,000 | $64,000 | $75,525 | $64,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.01 MILE | $96,600 | $120,000 | $101,200 | $30,000 | $92,000 | $150,000 | $30,000 | $92,000 | $108,565 | $92,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $89.25 | $100 | $100 | $75.00 | $65.00 | $90.00 | $85.00 | $100 | $145 | $176 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,865 | $4,200 | $3,500 | $6,000 | $8,000 | $4,000 | $6,500 | $8,000 | $5,600 | $6,342 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E25000 66" CONDUIT, TYPE A, 707.02 ALUMINIZED, 706.02, 70 | 90 FT | $708.87 | $64k | 22% |
| 602E20000 CONCRETE MASONRY | 34 CY | $1,560 | $53k | 18% |
| 624E10000 MOBILIZATION | 1 LS | $21,592 | $22k | 7% |
| 203E20000 EMBANKMENT | 347 CY | $48.87 | $17k | 6% |
| 611E96551 FIELD PAVING OF EXISTING PIPE, AS PER PLAN, 73"x55 | 68 FT | $207.97 | $14k | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 20 CY | $630 | $13k | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 17 CY | $735 | $12k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,746 | $12k | 4% |
| 601E11000 RIPRAP, TYPE D | 18.5 SY | $516.3 | $10k | 3% |
| 659E10000 SEEDING AND MULCHING | 2,510 SY | $3.62 | $9k | 3% |