HIG-SR 73-00.26
HIG County · est $2.1M
Bid dateThursday, November 13—
HIG County · est $2.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 83 more items below.
| Item | Quantity | R1D G M INC | R2George J Igel & CO INC | R3Alan Stone CO INC | R4Double Z Construction Company | R5Complete General Construction Company | R6Sunesis Construction CO | R7Kt Holden Construction LLC | R8Eagle Bridge CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 513E10221 STRUCTURAL STEEL MEMBERS, LEVEL 1, AS PER PLAN | 71,028 LB | $2.84 | $3.05 | $3.50 | $3.10 | $3.00 | $4.04 | $3.55 | $3.50 | 15% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 105 CY | $1,575 | $2,100 | $2,400 | $1,785 | $1,600 |
| Item | Quantity | R1D G M INC | R2George J Igel & CO INC | R3Alan Stone CO INC | R4Double Z Construction Company | R5Complete General Construction Company | R6Sunesis Construction CO | R7Kt Holden Construction LLC | R8Eagle Bridge CO |
|---|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $22,500 | $25,000 | $20,000 | $5,000 | $20,824 | $15,000 | $45,000 |
| 202E23000 PAVEMENT REMOVED | 1,611 SY | $4.00 | $14.25 | $20.00 | $18.00 | $12.50 | $7.11 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $2,993 |
| $2,150 |
| $2,500 |
| 12% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 510 CY | $220 | $220 | $250 | $210 | $210 | $210 | $225 | $210 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $110,000 | $67,000 | $100,000 | $90,000 | $110,000 | $226,848 | $86,935 | $95,000 | 8% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 160 FT | $600 | $385 | $330 | $600 | $725 | $439 | $650 | $675 | 7% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $94,000 | $70,000 | $65,000 | $180,000 | $82,500 | $73,547 | $173,515 | $165,000 | 7% |
| 202E11202 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $76,500 | $82,500 | $37,000 | $105,000 | $137,000 | $35,572 | $97,115 | $90,000 | 6% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 200 SY | $320 | $475 | $520 | $425 | $450 | $515 | $450 | $550 | 5% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 134 FT | $475 | $465 | $510 | $455 | $465 | $457 | $505 | $445 | 5% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 92 CY | $685 | $1,095 | $1,000 | $960 | $1,150 | $1,212 | $1,375 | $1,000 | 5% |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 38,585 LB | $1.35 | $1.60 | $1.50 | $1.70 | $1.75 | $2.06 | $1.75 | $1.75 | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 180 CY | $265 | $295 | $340 | $265 | $265 | $265 | $290 | $265 | 3% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 75 CY | $635 | $895 | $900 | $690 | $950 | $1,110 | $900 | $900 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $100,000 | $55,000 | $100,000 | $109,000 | $104,705 | $115,675 | $99,000 | 3% |
| 304E20000 AGGREGATE BASE | 430 CY | $77.50 | $92.00 | $110 | $95.00 | $95.00 | $98.74 | $90.00 | $100 | 2% |
| 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO | 12 EACH | $2,100 | $2,450 | $1,600 | $2,000 | $1,500 | $2,297 | $2,500 | $1,750 | 2% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,000 | $2,500 | $2,300 | $1,951 | $1,950 | $1,951 | $1,952 | $2,000 | 2% |
| 526E90010 TYPE A INSTALLATION | 88 FT | $250 | $265 | $210 | $250 | $300 | $226 | $250 | $300 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,210 FT | $18.00 | $28.00 | $20.00 | $24.00 | $27.50 | $27.82 | $26.01 | $30.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $21,000 | $10,000 | $15,000 | $14,000 | $13,000 | $12,704 | $41,320 | $35,000 | 2% |
| $6.70 |
| $12.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 207 FT | $15.00 | $15.00 | $20.00 | $15.00 | $50.00 | $27.69 | $17.50 | $15.00 |
| 202E75000 FENCE REMOVED | 8 FT | $15.00 | $12.00 | $60.00 | $15.00 | $50.00 | $20.55 | $25.00 | $12.00 |
| 202E98000 REMOVAL MISC.: CONCRETE RETAINING WALL | 1 LS | $6,000 | $2,500 | $4,700 | $1,800 | $8,000 | $1,086 | $9,500 | $1,500 |
| 203E10000 EXCAVATION | 446 CY | $20.00 | $25.00 | $55.00 | $25.00 | $35.00 | $2.66 | $35.00 | $35.00 |
| 203E20000 EMBANKMENT | 721 CY | $22.50 | $20.00 | $15.00 | $30.00 | $35.00 | $36.74 | $27.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 2,551 SY | $3.00 | $4.00 | $4.00 | $5.00 | $5.50 | $2.62 | $2.00 | $6.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $75.00 | $132 | $280 | $200 | $375 | $427 | $500 | $150 |
| 606E15050 GUARDRAIL, TYPE MGS | 275 FT | $25.00 | $23.00 | $25.00 | $21.00 | $36.94 | $23.00 | $21.00 | $21.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $2,600 | $2,550 | $2,900 | $2,500 | $2,400 | $2,550 | $2,500 | $2,500 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,450 | $1,400 | $1,400 | $1,200 | $1,100 | $1,400 | $1,200 | $1,200 |
| 606E34600 MGS BRIDGE TERMINAL ASSEMBLY, TYPE TST-2 | 4 EACH | $2,800 | $2,750 | $2,900 | $2,500 | $2,290 | $2,750 | $2,500 | $2,500 |
| 623E38500 MONUMENT ASSEMBLY, TYPE C | 1 EACH | $1,000 | $1,300 | $3,500 | $1,600 | $2,000 | $3,039 | $2,900 | $2,792 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 3 EACH | $300 | $350 | $340 | $500 | $1,000 | $283 | $850 | $300 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 2 EACH | $200 | $500 | $220 | $300 | $220 | $274 | $340 | $250 |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 81 CY | $120 | $140 | $180 | $135 | $95.00 | $224 | $168 | $100 |
| 659E00300 TOPSOIL | 371 CY | $17.50 | $10.25 | $15.00 | $50.00 | $25.00 | $33.13 | $75.00 | $10.00 |
| 659E10000 SEEDING AND MULCHING | 2,717 SY | $2.00 | $3.50 | $2.00 | $5.00 | $1.30 | $2.74 | $1.45 | $3.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 136 SY | $0.05 | $1.30 | $1.00 | $1.30 | $1.30 | $1.30 | $2.20 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.37 TON | $1,500 | $1,250 | $1,700 | $1,250 | $1,250 | $1,250 | $1,400 | $1,500 |
| 659E31000 LIME | 0.56 ACRE | $300 | $150 | $230 | $150 | $150 | $150 | $450 | $5.00 |
| 659E35000 WATER | 15 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $7.00 | $10.00 |
| 670E00500 SLOPE EROSION PROTECTION | 623 SY | $2.50 | $2.50 | $3.00 | $2.50 | $2.50 | $2.50 | $2.00 | $2.50 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $2,000 | $3,100 | $2,700 | $2,000 | $2,700 | $3,000 | $3,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $10,000 | $8,850 | $9,800 | $6,420 | $9,550 | $6,420 | $9,630 | $15,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $12,000 | $9,100 | $14,000 | $13,000 | $12,500 | $12,073 | $12,175 | $15,000 |
| 832E30000 EROSION CONTROL | 16,309 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 244 FT | $25.00 | $48.00 | $35.00 | $20.00 | $20.00 | $19.45 | $15.00 | $10.00 |
| 611E01400 6" CONDUIT, TYPE E | 30 FT | $10.00 | $36.00 | $40.00 | $8.00 | $10.00 | $23.02 | $3.30 | $5.00 |
| 611E01500 6" CONDUIT, TYPE F | 30 FT | $8.00 | $36.00 | $55.00 | $8.00 | $10.00 | $23.02 | $3.30 | $5.00 |
| 611E04900 12" CONDUIT, TYPE D | 136 FT | $80.00 | $85.00 | $150 | $80.00 | $105 | $79.02 | $74.00 | $55.00 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $1,300 | $2,500 | $8,100 | $3,000 | $4,000 | $1,727 | $1,800 | $2,250 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $400 | $2,300 | $2,000 | $900 | $1,500 | $899 | $1,275 | $700 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5") | 135 SY | $15.00 | $15.00 | $65.00 | $14.00 | $14.00 | $14.00 | $9.25 | $14.00 |
| 407E10000 TACK COAT | 402 GAL | $4.50 | $10.50 | $5.00 | $4.50 | $4.50 | $4.50 | $1.00 | $4.50 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 25 CY | $40.00 | $68.10 | $130 | $90.00 | $95.00 | $109 | $60.00 | $75.00 |
| 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C | 25 CY | $45.00 | $82.05 | $90.00 | $75.00 | $95.00 | $109 | $65.00 | $75.00 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $720 | $600 | $2,100 | $700 | $700 | $700 | $650 | $700 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE(1.0?) | 354 SY | $30.00 | $22.00 | $28.00 | $31.46 | $28.00 | $28.00 | $29.00 | $28.00 |
| 618E40800 RUMBLE STRIPES, EDGE LINE (ASPHALT CONCRETE) | 1,089 FT | $4.00 | $10.00 | $7.00 | $8.00 | $7.00 | $4.63 | $4.40 | $5.00 |
| 618E40900 RUMBLE STRIPES, CENTER LINE (ASPHALT CONCRETE) | 842 FT | $4.00 | $10.00 | $7.50 | $8.00 | $9.00 | $4.00 | $4.40 | $5.00 |
| 621E00100 RPM | 8 EACH | $292 | $475 | $550 | $290 | $475 | $290 | $290 | $292 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 8 EACH | $1.00 | $30.00 | $140 | $15.00 | $50.00 | $24.34 | $22.00 | $25.00 |
| 626E00112 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 12 EACH | $15.00 | $13.00 | $15.00 | $12.00 | $10.00 | $12.23 | $12.00 | $12.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 36.4 FT | $18.00 | $16.00 | $20.00 | $16.00 | $15.00 | $30.21 | $18.00 | $16.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $60.00 | $55.00 | $65.00 | $55.00 | $30.00 | $89.72 | $50.00 | $55.00 |
| 630E80100 SIGN, FLAT SHEET | 27 SF | $18.00 | $16.00 | $20.00 | $16.00 | $30.00 | $32.22 | $25.00 | $16.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 11 EACH | $15.00 | $20.00 | $25.00 | $20.00 | $15.00 | $16.56 | $30.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 9 EACH | $15.00 | $25.00 | $75.00 | $25.00 | $15.00 | $22.08 | $30.00 | $25.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.24 MILE | $6,000 | $5,500 | $5,700 | $5,000 | $5,500 | $5,000 | $5,000 | $6,944 |
| 642E00300 CENTER LINE, TYPE 1 | 0.12 MILE | $6,000 | $10,500 | $6,300 | $5,500 | $10,500 | $5,500 | $5,500 | $10,416 |
| 614E12420 DETOUR SIGNING | 1 LS | $8,000 | $6,000 | $6,900 | $4,775 | $6,000 | $9,953 | $7,800 | $6,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 32 EACH | $20.00 | $44.00 | $50.00 | $15.00 | $44.00 | $10.05 | $10.05 | $15.00 |
| 614E13314 BARRIER REFLECTOR, TYPE 3 (BI-DIRECTIONAL) | 5 EACH | $20.00 | $50.00 | $60.00 | $15.00 | $50.00 | $11.18 | $11.18 | $15.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 37 EACH | $20.00 | $40.00 | $45.00 | $15.00 | $40.00 | $19.88 | $19.88 | $18.00 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.93 MILE | $4,000 | $3,652 | $4,000 | $3,500 | $3,652 | $3,500 | $3,500 | $8,000 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 48 FT | $10.00 | $14.00 | $8.00 | $7.00 | $14.00 | $7.00 | $7.00 | $11.00 |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 123 SY | $125 | $85.00 | $120 | $175 | $200 | $179 | $187 | $200 |
| 616E10000 WATER | 6 MGAL | $1.00 | $62.15 | $0.20 | $50.00 | $100 | $14.99 | $36.00 | $10.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $2,000 | $8,500 | $16,000 | $10,000 | $18,000 | $10,015 | $15,000 | $15,000 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.2 MILE | $4,000 | $7,800 | $11,208 | $3,500 | $10,500 | $3,500 | $3,500 | $7,800 |
| 202E22900 APPROACH SLAB REMOVED | 94 SY | $25.00 | $60.00 | $130 | $65.00 | $65.00 | $41.86 | $100 | $75.00 |
| 202E23500 WEARING COURSE REMOVED | 265 SY | $8.00 | $8.50 | $20.00 | $33.00 | $55.00 | $5.41 | $7.50 | $20.00 |
| 503E21300 UNCLASSIFIED EXCAVATION | 1 LS | $11,000 | $91,000 | $10,000 | $50,000 | $80,000 | $25,448 | $84,200 | $50,000 |
| 503E31100 ROCK EXCAVATION | 85 CY | $60.00 | $120 | $150 | $170 | $50.00 | $97.24 | $120 | $200 |
| 511E33500 SEMI-INTEGRAL DIAPHRAGM GUIDE | 2 EACH | $2,400 | $4,325 | $6,800 | $3,500 | $7,475 | $3,109 | $4,400 | $5,500 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 167 SY | $40.00 | $32.00 | $45.00 | $40.00 | $40.00 | $40.00 | $32.00 | $40.00 |
| 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN | 20 SY | $40.00 | $60.00 | $30.00 | $36.00 | $100 | $71.61 | $99.00 | $40.00 |
| 512E33000 TYPE 2 WATERPROOFING | 33 SY | $25.00 | $38.05 | $95.00 | $36.00 | $75.00 | $44.11 | $45.00 | $25.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 2,664 EACH | $7.00 | $5.90 | $6.50 | $5.90 | $5.80 | $6.31 | $5.90 | $5.80 |
| 516E13900 2" PREFORMED EXPANSION JOINT FILLER | 54 SF | $25.00 | $12.00 | $4.00 | $19.00 | $11.00 | $5.64 | $7.00 | $16.00 |
| 516E14020 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL | 118 FT | $47.50 | $35.00 | $25.00 | $32.00 | $50.00 | $54.48 | $55.00 | $50.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 79 CY | $120 | $175 | $200 | $120 | $150 | $106 | $90.00 | $125 |
| 518E22300 SPECIAL - STEEL DRIP STRIP | 147 FT | $20.00 | $15.00 | $60.00 | $30.00 | $16.50 | $16.50 | $24.00 | $18.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 168 FT | $20.00 | $8.00 | $5.00 | $13.00 | $15.00 | $9.10 | $8.00 | $20.00 |
| 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 40 FT | $60.00 | $60.00 | $55.00 | $13.00 | $25.00 | $15.38 | $38.00 | $50.00 |
| 524E94704 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK | 9 FT | $600 | $270 | $990 | $715 | $550 | $370 | $590 | $550 |
| 625E33000 STRUCTURE GROUNDING SYSTEM | 1 EACH | $20,000 | $15,500 | $21,000 | $15,000 | $10,000 | $12,375 | $18,500 | $20,000 |
| 619E16000 FIELD OFFICE, TYPE A | 6 MNTH | $750 | $1,900 | $1,000 | $2,000 | $2,000 | $2,885 | $1,740 | $3,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,000 | $15,000 | $25,000 | $14,900 | $20,000 | $23,750 | $9,200 | $25,000 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,000 | $3,650 | $3,400 | $1,500 | $3,000 | $3,100 | $2,500 | $6,200 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND | 1 LS | $1,000 | $3,550 | $3,400 | $1,500 | $3,000 | $3,100 | $2,500 | $6,200 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 513E10221 STRUCTURAL STEEL MEMBERS, LEVEL 1, AS PER PLAN | 71,028 LB | $2.84 | $202k | 12% |
| 511E34446 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK | 105 CY | $1,575 | $165k | 9% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 510 CY | $220 | $112k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $110,000 | $110k | 6% |
| 524E94604 DRILLED SHAFTS, 30" DIAMETER, INTO BEDROCK | 160 FT | $600 | $96k | 6% |
| 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | 1 LS | $94,000 | $94k | 5% |
| 202E11202 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN | 1 LS | $76,500 | $77k | 4% |
| 526E25010 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1 | 200 SY | $320 | $64k | 4% |
| 517E70100 RAILING (THREE STEEL TUBE BRIDGE RAILING) | 134 FT | $475 | $64k | 4% |
| 511E44112 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT NOT INCLUD | 92 CY | $685 | $63k | 4% |