MAR-SR 95-17.90 (at Jamesway)
MAR County · est $2.9M
Bid dateThursday, December 4—
MAR County · est $2.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 121 more items below.
| Item | Quantity | R1Helms And Sons Excavating | R2Shelly & Sands INC | R3Complete General Construction Company | R4Double Z Construction Company | R5Rietschlin Construction INC | % of bid |
|---|---|---|---|---|---|---|---|
| 442E22450 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 1,086 CY | $255 | $210 | $210 | $240 | $264 | 16% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 931 CY | $290 | $280 | $280 | $278 | $306 | 16% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE [T=3.25"] | 20,195 SY | $8.00 | $6.00 | $6.00 | $3.70 | $4.25 | 9% |
| 622E10121 CONCRETE BARRIER, SINGLE SLOPE, TYPE C, AS PER PLA | 290 FT | $450 | $350 | $545 | $500 | $370 | 8% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 12 EACH | $6,600 | $8,750 | $8,750 | $9,700 | $10,669 | 5% |
| Item | Quantity | R1Helms And Sons Excavating | R2Shelly & Sands INC | R3Complete General Construction Company | R4Double Z Construction Company | R5Rietschlin Construction INC |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 691 SY | $20.00 | $17.00 | $25.00 | $38.00 | $20.00 |
| 202E30700 CONCRETE BARRIER REMOVED | 285 FT | $25.00 | $34.00 | $75.00 | $50.00 | $35.00 |
| 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN | 216 FT | $35.00 | $45.00 | $75.00 | $65.00 | $66.00 |
| 202E32601 GUTTER REMOVED, AS PER PLAN | 79 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $75,000 |
| $66,000 |
| $95,000 |
| $190,000 |
| $170,000 |
| 4% |
| 624E10000 MOBILIZATION | 1 LS | $75,000 | $142,000 | $140,000 | $100,000 | $150,000 | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 3,234 FT | $20.00 | $17.00 | $25.00 | $25.00 | $26.50 | 4% |
| 606E60022 IMPACT ATTENUATOR, TYPE 2 (UNIDIRECTIONAL) 35 MPH, | 2 EACH | $31,000 | $34,000 | $26,500 | $29,500 | $34,950 | 4% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 16 EACH | $3,800 | $10,000 | $10,000 | $8,700 | $9,570 | 4% |
| 611E52204 14" X 23" CONDUIT, TYPE C, 706.04 | 249 FT | $235 | $187 | $190 | $200 | $200 | 3% |
| 606E60022 IMPACT ATTENUATOR, TYPE 2 (UNIDIRECTIONAL) 35 MPH, | 2 EACH | $27,000 | $23,000 | $23,950 | $19,500 | $23,950 | 3% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 4 EACH | $13,200 | $14,500 | $17,500 | $16,600 | $18,260 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $50,000 | $14,000 | $4,000 | $8,000 | $20,000 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $45,000 | $11,500 | $20,500 | $20,000 | $35,000 | 3% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 8 EACH | $5,500 | $9,000 | $9,000 | $10,050 | $11,055 | 3% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 185 CY | $225 | $440 | $440 | $320 | $352 | 2% |
| 203E20000 EMBANKMENT | 1,166 CY | $35.00 | $17.00 | $20.00 | $45.00 | $27.00 | 2% |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 4 EACH | $10,000 | $5,000 | $5,000 | $3,500 | $3,850 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $37,500 | $15,900 | $20,000 | $34,500 | $25,000 | 2% |
| $30.00 |
| $35.00 |
| $12.00 |
| $20.00 |
| $68.00 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 105 FT | $25.00 | $22.00 | $14.00 | $20.00 | $34.00 |
| 202E38000 GUARDRAIL REMOVED | 173 FT | $5.00 | $4.00 | $3.00 | $4.00 | $11.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $750 | $330 | $750 | $600 | $800 |
| 202E75000 FENCE REMOVED | 10 FT | $10.00 | $78.00 | $15.00 | $15.00 | $55.00 |
| 202E98100 REMOVAL MISC.: BOLLARD | 2 EACH | $250 | $145 | $100 | $150 | $880 |
| 202E98100 REMOVAL MISC.:EXIST WOOD POST | 1 EACH | $40.00 | $295 | $40.00 | $150 | $350 |
| 203E10000 EXCAVATION | 841 CY | $35.00 | $21.00 | $50.00 | $40.00 | $31.00 |
| 204E10000 SUBGRADE COMPACTION | 2,118 SY | $5.00 | $3.50 | $4.50 | $12.00 | $2.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $120 | $260 | $350 | $200 | $460 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 2,347 FT | $2.00 | $2.50 | $3.50 | $3.00 | $3.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 25 FT | $60.00 | $32.00 | $48.40 | $30.00 | $33.00 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 2 EACH | $5,000 | $2,500 | $5,070 | $2,500 | $2,750 |
| 608E10000 4" CONCRETE WALK | 3,736 SF | $10.00 | $6.60 | $13.00 | $15.00 | $9.00 |
| 608E52000 CURB RAMP | 892 SF | $25.00 | $18.00 | $25.00 | $40.00 | $21.00 |
| 609E26000 CURB, TYPE 6 | 30 FT | $90.00 | $30.00 | $60.00 | $90.00 | $80.00 |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $500 | $11,600 | $1,750 | $17,000 | $10,000 |
| 202E75200 FENCE REMOVED FOR REUSE | 20 FT | $20.00 | $160 | $30.00 | $50.00 | $55.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 3.6 SY | $250 | $160 | $150 | $300 | $150 |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 272.6 CY | $125 | $212 | $185 | $90.00 | $120 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $75.00 | $140 | $150 | $150 | $150 |
| 659E00300 TOPSOIL | 804 CY | $40.00 | $28.00 | $45.00 | $55.00 | $51.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 6,359 SY | $2.00 | $1.00 | $1.60 | $5.00 | $1.75 |
| 659E14000 REPAIR SEEDING AND MULCHING | 318 SY | $2.00 | $0.80 | $1.60 | $1.60 | $1.75 |
| 659E15000 INTER-SEEDING | 318 SY | $1.00 | $0.80 | $1.60 | $1.60 | $1.75 |
| 659E20000 COMMERCIAL FERTILIZER | 0.89 TON | $770 | $900 | $1,250 | $1,250 | $1,300 |
| 659E31000 LIME | 1.32 ACRE | $40.00 | $160 | $150 | $150 | $150 |
| 659E35000 WATER | 36 MGAL | $1.00 | $1.00 | $1.00 | $1.00 | $10.00 |
| 670E00500 SLOPE EROSION PROTECTION | 884 SY | $2.00 | $1.60 | $2.50 | $2.50 | $4.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $5,600 | $2,400 | $2,500 | $2,500 | $2,650 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,000 | $6,500 | $17,100 | $20,000 | $9,500 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $11,000 | $12,500 | $12,180 | $15,000 | $15,500 |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 0.49 CY | $5,000 | $18,000 | $3,000 | $10,000 | $3,800 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 458 FT | $20.00 | $18.00 | $20.00 | $18.00 | $16.25 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 32 FT | $25.00 | $29.00 | $45.00 | $30.00 | $41.00 |
| 611E04400 12" CONDUIT, TYPE B | 144 FT | $100 | $115 | $125 | $190 | $130 |
| 611E04600 12" CONDUIT, TYPE C | 9 FT | $250 | $217 | $175 | $185 | $400 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $4,500 | $4,700 | $4,750 | $5,000 | $7,800 |
| 611E98470 CATCH BASIN, NO. 2-2B | 4 EACH | $3,000 | $3,100 | $2,750 | $3,500 | $2,760 |
| 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN | 5 EACH | $1,500 | $2,000 | $2,000 | $1,300 | $3,350 |
| 611E99574 MANHOLE, NO. 3 | 4 EACH | $5,500 | $4,200 | $4,500 | $4,500 | $3,650 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 5 EACH | $2,000 | $2,550 | $1,600 | $950 | $1,250 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $1,000 | $290 | $550 | $500 | $325 |
| 601E38000 PAVED GUTTER, TYPE 1-4 | 273 FT | $65.00 | $95.00 | $80.00 | $100 | $80.00 |
| 304E20000 AGGREGATE BASE | 209 CY | $60.00 | $98.00 | $80.00 | $135 | $134 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 192 CY | $60.00 | $93.00 | $80.00 | $135 | $149 |
| 407E20000 NON-TRACKING TACK COAT | 3,029 GAL | $3.00 | $3.50 | $3.50 | $3.00 | $3.50 |
| 625E18100 BRACKET ARM, 12' | 16 EACH | $280 | $1,250 | $1,250 | $1,100 | $1,210 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 16 EACH | $1,150 | $250 | $250 | $290 | $319 |
| 625E32000 GROUND ROD | 29 EACH | $500 | $300 | $300 | $265 | $292 |
| 621E00100 RPM | 150 EACH | $45.00 | $49.00 | $39.00 | $49.00 | $43.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 1,138.92 FT | $20.00 | $15.00 | $15.00 | $17.50 | $20.50 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 1 EACH | $900 | $500 | $785 | $600 | $324 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 13 EACH | $300 | $150 | $265 | $175 | $122 |
| 630E80100 SIGN, FLAT SHEET | 969.73 SF | $25.00 | $24.00 | $20.00 | $24.00 | $23.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 102 EACH | $12.00 | $25.00 | $10.80 | $20.00 | $19.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $70.00 | $100 | $65.00 | $150 | $37.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 107 EACH | $17.00 | $25.00 | $15.00 | $20.00 | $25.00 |
| 644E00104 EDGE LINE, 6", WHITE | 0.61 MILE | $7,150 | $6,000 | $4,000 | $4,000 | $4,400 |
| 644E00104 EDGE LINE, 6", YELLOW | 0.12 MILE | $7,150 | $6,000 | $4,000 | $4,000 | $4,400 |
| 644E00204 LANE LINE, 6" | 0.45 MILE | $6,050 | $2,500 | $3,300 | $3,300 | $3,700 |
| 644E00300 CENTER LINE | 0.46 MILE | $8,800 | $8,500 | $5,100 | $5,100 | $5,700 |
| 644E00404 CHANNELIZING LINE, 12" | 3,318 FT | $4.00 | $2.50 | $2.60 | $2.60 | $3.00 |
| 644E00500 STOP LINE | 465 FT | $7.50 | $8.00 | $10.00 | $10.00 | $11.00 |
| 644E00620 CROSSWALK LINE, 12" | 1,241 FT | $4.00 | $4.00 | $11.00 | $11.00 | $12.25 |
| 644E01100 SCHOOL SYMBOL MARKING, 72" | 2 EACH | $880 | $350 | $500 | $500 | $550 |
| 644E01300 LANE ARROW | 27 EACH | $110 | $110 | $120 | $120 | $132 |
| 644E01510 DOTTED LINE, 6" | 92 FT | $3.50 | $2.00 | $2.00 | $2.00 | $2.25 |
| 644E01630 BIKE LANE SYMBOL MARKING | 11 EACH | $330 | $275 | $110 | $110 | $121 |
| 625E25400 CONDUIT, 2", 725.04 | 366 FT | $5.50 | $18.00 | $18.00 | $21.00 | $23.25 |
| 625E25500 CONDUIT, 3", 725.04 | 112 FT | $11.00 | $50.00 | $50.00 | $32.00 | $35.25 |
| 625E25600 CONDUIT, 4", 725.04 | 101 FT | $11.50 | $60.00 | $60.00 | $42.00 | $46.25 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 2" | 134 FT | $44.00 | $35.00 | $35.00 | $43.00 | $47.50 |
| 625E29000 TRENCH | 478 FT | $9.00 | $16.00 | $16.00 | $12.00 | $13.25 |
| 625E30700 PULL BOX, 725.08, 18" | 6 EACH | $1,300 | $1,000 | $1,000 | $1,050 | $1,155 |
| 625E30706 PULL BOX, 725.08, 24" | 4 EACH | $1,650 | $1,400 | $1,400 | $1,350 | $1,485 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL JAMES WAY, US-23 | 4 EACH | $2,200 | $3,650 | $3,650 | $3,450 | $3,800 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 23 EACH | $1,250 | $950 | $950 | $1,350 | $1,485 |
| 632E05064 VEHICULAR SIGNAL HEAD, (LED), 4-SECTION, 12" LENS, | 2 EACH | $1,400 | $1,225 | $1,225 | $1,900 | $2,090 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 11 EACH | $1,900 | $1,600 | $1,600 | $2,150 | $2,365 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 20 EACH | $850 | $625 | $625 | $850 | $935 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 36 EACH | $90.00 | $30.00 | $30.00 | $50.00 | $55.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 20 EACH | $90.00 | $30.00 | $30.00 | $40.00 | $44.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 4 EACH | $950 | $325 | $325 | $265 | $292 |
| 632E30400 MESSENGER WIRE, 7 STRAND, 1/2" DIAMETER WITH ACCES | 1,518 FT | $5.00 | $21.00 | $21.00 | $22.00 | $24.25 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 1,518 FT | $6.00 | $23.00 | $23.00 | $22.00 | $24.25 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 4,221 FT | $5.00 | $3.00 | $3.00 | $3.00 | $3.50 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 4,112 FT | $5.00 | $3.50 | $3.50 | $5.00 | $5.50 |
| 632E42300 SIGNAL CABLE, 3 CONDUCTOR, NO. 12 AWG | 2,133 FT | $3.50 | $2.70 | $2.75 | $4.00 | $4.50 |
| 632E64020 PEDESTAL FOUNDATION | 5 EACH | $1,300 | $1,000 | $1,000 | $1,350 | $1,485 |
| 632E64950 TEST HOLE PERFORMED | 8 EACH | $2,200 | $3,000 | $3,000 | $800 | $880 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 1,244 FT | $5.50 | $2.00 | $2.00 | $2.50 | $2.75 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 471 FT | $5.50 | $7.50 | $7.50 | $9.00 | $10.00 |
| 632E70000 POWER SERVICE | 4 EACH | $1,100 | $2,000 | $2,000 | $1,600 | $1,760 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 4 EACH | $550 | $500 | $500 | $650 | $715 |
| 632E87140 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 12 | 8 EACH | $3,300 | $12,000 | $12,000 | $13,500 | $14,850 |
| 632E87150 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 13 | 8 EACH | $4,400 | $14,000 | $14,000 | $15,600 | $17,160 |
| 632E89802 PEDESTAL, 5', TRANSFORMER BASE | 4 EACH | $1,980 | $850 | $850 | $900 | $990 |
| 633E67100 CABINET FOUNDATION | 4 EACH | $2,200 | $5,000 | $5,000 | $3,200 | $3,520 |
| 633E67200 CONTROLLER WORK PAD | 4 EACH | $660 | $3,000 | $3,000 | $750 | $825 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 4 EACH | $7,700 | $7,000 | $7,000 | $8,700 | $9,570 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 232 FT | $2.50 | $3.00 | $3.00 | $3.50 | $4.00 |
| 809E65990 ITS DEVICE, MISC.:2" ITS PULL BOX w/ PAD & STANDAR | 3 EACH | $440 | $3,200 | $3,200 | $3,425 | $3,768 |
| 809E65990 ITS DEVICE, MISC.:RELOCATE EXISTING COMMUNICATIONS | 4 EACH | $330 | $1,500 | $1,500 | $850 | $935 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 4 EACH | $4,400 | $500 | $500 | $1,000 | $1,100 |
| 809E70000 MAINTAINING ITS DURING CONSTRUCTION | 1 LS | $6,600 | $640 | $640 | $28,000 | $28,000 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,300 | $2,200 | $2,440 | $2,200 | $2,308 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,400 | $2,300 | $2,480 | $2,250 | $2,418 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE WAY | 65 EACH | $11.00 | $13.00 | $14.00 | $15.00 | $12.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 65 EACH | $20.00 | $17.00 | $18.00 | $18.00 | $21.00 |
| 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT | 0.24 MILE | $5,500 | $3,500 | $9,800 | $9,800 | $10,800 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.1 MILE | $7,700 | $16,500 | $9,800 | $9,800 | $10,800 |
| 614E22100 WORK ZONE EDGE LINE, CLASS I, 4", 642 PAINT | 0.47 MILE | $6,600 | $6,400 | $9,800 | $9,800 | $10,800 |
| 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN | 440 FT | $3.50 | $4.00 | $1.00 | $1.00 | $1.10 |
| 614E24200 WORK ZONE DOTTED LINE, CLASS I, 4", 642 PAINT | 188 FT | $2.50 | $7.00 | $0.90 | $0.90 | $1.00 |
| 616E10000 WATER | 50 MGAL | $1.50 | $100 | $44.00 | $15.00 | $11.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $55.00 | $106 | $130 | $70.00 | $94.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E22450 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 1,086 CY | $255 | $277k | 10% |
| 442E22100 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 931 CY | $290 | $270k | 10% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE [T=3.25"] | 20,195 SY | $8 | $162k | 6% |
| 622E10121 CONCRETE BARRIER, SINGLE SLOPE, TYPE C, AS PER PLA | 290 FT | $450 | $131k | 5% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 12 EACH | $6,600 | $79k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $75,000 | $75k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $75,000 | $75k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 3,234 FT | $20 | $65k | 2% |
| 606E60022 IMPACT ATTENUATOR, TYPE 2 (UNIDIRECTIONAL) 35 MPH, | 2 EACH | $31,000 | $62k | 2% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 16 EACH | $3,800 | $61k | 2% |