AUG-GLSM East Bank CR
AUG County · est $0.1M
Bid dateThursday, November 13—
AUG County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount.
| Item | Quantity | R1Advanced Excavating & Demolition | R2LLC Brumbaugh Construction INC | R3R B Jergens Contractors INC | R4Eagle Bridge CO | % of bid |
|---|---|---|---|---|---|---|
| 611E20701 48" CONDUIT, TYPE A, AS PER PLAN,707.34, (HDPE) | 67 FT | $525 | $800 | $709 | $925 | 31% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $30,000 | $21,000 | $16,966 | $61,000 | 26% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15,000 | $13,476 | $7,500 | 13% |
| 611E97200 CONDUIT, MISC.:, PIPE SEALING SYSTEM | 1 EACH | $6,000 | $2,000 | $3,497 | $5,000 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $6,062 | $5,739 | $6,500 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $1,200 | $5,793 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $2,000 |
| 4% |
| 608E13000 6" CONCRETE WALK | 60 SF | $62.00 | $30.00 | $28.60 | $40.00 | 3% |
| 602E20000 CONCRETE MASONRY (HEADWALL) | 1.09 CY | $2,500 | $3,000 | $3,598 | $3,000 | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 4 CY | $570 | $631 | $742 | $712 | 2% |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 70 FT | $30.00 | $55.00 | $94.22 | $35.00 | 2% |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, 3 | 9 SY | $160 | $20.00 | $118 | $150 | 1% |
| 659E00501 SEEDING AND MULCHING, CLASS 1, AS PER PLAN | 43 SY | $30.00 | $25.00 | $82.20 | $35.00 | 1% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 1 CY | $1,250 | $1,993 | $1,325 | $600 | 1% |
| 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, 4 | 3 SY | $365 | $25.00 | $177 | $175 | 1% |
| 304E20001 AGGREGATE BASE, AS PER PLAN, 5.25" | 5 CY | $180 | $90.00 | $162 | $650 | 1% |
| 202E23000 PAVEMENT REMOVED | 42 SY | $18.00 | $20.00 | $98.63 | $25.00 | 1% |
| 202E30001 WALK REMOVED, AS PER PLAN | 48 SF | $15.00 | $10.00 | $27.49 | $15.00 | 1% |
| 304E20000 AGGREGATE BASE, 6" | 5 CY | $100 | $90.00 | $162 | $300 | 0% |
| 204E10000 SUBGRADE COMPACTION | 29 SY | $5.00 | $5.00 | $44.79 | $20.00 | 0% |
| 407E20000 NON-TRACKING TACK COAT | 21 GAL | $5.00 | $7.00 | $15.90 | $5.50 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E20701 48" CONDUIT, TYPE A, AS PER PLAN,707.34, (HDPE) | 67 FT | $525 | $35k | 31% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $30,000 | $30k | 26% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 13% |
| 611E97200 CONDUIT, MISC.:, PIPE SEALING SYSTEM | 1 EACH | $6,000 | $6k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $5k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $5k | 4% |
| 608E13000 6" CONCRETE WALK | 60 SF | $62 | $4k | 3% |
| 602E20000 CONCRETE MASONRY (HEADWALL) | 1.09 CY | $2,500 | $3k | 2% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 4 CY | $570 | $2k | 2% |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 70 FT | $30 | $2k | 2% |