D02-PM FY2026
D02 County · est $3.6M
Bid dateThursday, December 4—
D02 County · est $3.6M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 642E00104 EDGE LINE, 6", TYPE 1 | 2,620.51 MILE | $640 | $1.68M | 59% |
| 642E00300 CENTER LINE, TYPE 1 | 1,286.4 MILE | $425 | $547k | 19% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 10 more items below.
| Item | Quantity | R1Oglesby Construction INC | R2Alpha Space Control LLC | R3The Aero-mark Company LLC | R4American Roadway Logistics | % of bid |
|---|---|---|---|---|---|---|
| 642E00104 EDGE LINE, 6", TYPE 1 | 2,620.51 MILE | $640 | $628 | $687 | $785 | 60% |
| 642E00300 CENTER LINE, TYPE 1 | 1,286.4 MILE | $425 | $630 | $453 | $575 | 19% |
| 642E00204 LANE LINE, 6", TYPE 1 | 296.48 MILE | $300 | $315 | $395 | $450 | 3% |
| 642E50000 PAVEMENT MARKING, MISC.:REPAINTING, EDGE LINE, TYP | 125 MILE | $640 | $315 | $650 | $550 | 3% |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 141,241 FT | $0.55 | $0.42 | $0.60 | $0.60 | 3% |
| 642E01510 DOTTED LINE, 6", TYPE 1 | 107,355 FT | $0.62 | $0.56 | $0.60 | $0.65 |
| Item | Quantity | R1Oglesby Construction INC | R2Alpha Space Control LLC | R3The Aero-mark Company LLC | R4American Roadway Logistics |
|---|---|---|---|---|---|
| 642E01522 DOTTED LINE, 8", TYPE 1 | 1,905 FT | $0.75 | $0.60 | $0.60 | $0.75 |
| 644E01001 RAILROAD SYMBOL MARKING, AS PER PLAN | 5 EACH | $750 | $350 | $801 | $650 |
| 644E01350 LANE REDUCTION ARROW | 14 EACH | $250 | $238 | $779 | $150 |
| 644E01360 WRONG WAY ARROW | 18 EACH | $125 | $210 | $521 | $150 |
| 644E01370 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 2% |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 | 78,612 FT | $0.62 | $0.53 | $0.60 | $0.75 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $37,000 | $12,500 | $50,000 | $100,000 | 1% |
| 644E01301 LANE ARROW, AS PER PLAN | 525 EACH | $70.00 | $50.00 | $291 | $150 | 1% |
| 644E00501 STOP LINE, AS PER PLAN | 4,685 FT | $6.60 | $3.50 | $19.50 | $10.00 | 1% |
| 642E50000 PAVEMENT MARKING, MISC.:REPAINTING, CENTER LINE, T | 60 MILE | $425 | $575 | $424 | $450 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $21,600 | $12,500 | $21,000 | $100,000 | 1% |
| 642E50000 PAVEMENT MARKING, MISC.:REPAINTING, LANE LINE, TYP | 60 MILE | $310 | $575 | $333 | $350 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $47,000 | $16,699 | $35,000 | 1% |
| 646E20301 LANE ARROW, AS PER PLAN | 135 EACH | $60.00 | $65.00 | $325 | $225 | 0% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $80.00 | $55.00 | $86.00 | $85.00 | 0% |
| 644E40000 SPEED MEASUREMENT MARKING | 30 EACH | $250 | $900 | $197 | $250 | 0% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $900 | $750 | $100 | $1,000 | 0% |
| 642E01500 DOTTED LINE, 4", TYPE 1 | 12,165 FT | $0.55 | $0.43 | $0.60 | $0.55 | 0% |
| 646E20711 SPEED MEASUREMENT MARKING, AS PER PLAN | 22 EACH | $250 | $900 | $464 | $350 | 0% |
| 7 EACH |
| $135 |
| $95.00 |
| $551 |
| $300 |
| 644E20801 YIELD LINE, AS PER PLAN | 422 FT | $7.50 | $5.80 | $48.00 | $12.00 |
| 646E10401 STOP LINE, AS PER PLAN | 596 FT | $5.75 | $4.27 | $26.50 | $15.00 |
| 646E20320 WRONG WAY ARROW | 27 EACH | $110 | $215 | $553 | $325 |
| 646E20350 LANE REDUCTION ARROW | 5 EACH | $200 | $240 | $725 | $450 |
| 646E20800 YIELD LINE | 98 FT | $6.75 | $5.75 | $76.00 | $20.00 |
| 296.48 MILE |
| $300 |
| $89k |
| 3% |
| 642E50000 PAVEMENT MARKING, MISC.:REPAINTING, EDGE LINE, TYP | 125 MILE | $640 | $80k | 3% |
| 642E00400 CHANNELIZING LINE, 8", TYPE 1 | 141,241 FT | $0.55 | $78k | 3% |
| 642E01510 DOTTED LINE, 6", TYPE 1 | 107,355 FT | $0.62 | $67k | 2% |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 | 78,612 FT | $0.62 | $49k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $37,000 | $37k | 1% |
| 644E01301 LANE ARROW, AS PER PLAN | 525 EACH | $70 | $37k | 1% |
| 644E00501 STOP LINE, AS PER PLAN | 4,685 FT | $6.6 | $31k | 1% |