MIA-SR 571-IMP 06.38
MIA County · est $2.0M
Bid dateThursday, December 18—
MIA County · est $2.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 91 more items below.
| Item | Quantity | R1Eagle Bridge CO | R2Sunesis Construction CO | R3Brumbaugh Construction INC | R4R B Jergens Contractors INC | R5Double Jay Construction INC | R6Complete General Construction Company | R7John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 85 CY | $1,100 | $1,019 | $1,250 | $1,098 | $1,345 | $1,650 | $1,410 | 10% |
| AA2 625E10481 LIGHT POLE, AESTHETIC, AS PER PLAN, 27', TLP BRACK | 19 EACH | $4,582 | $4,582 | $10,000 | $4,807 | $5,132 | $4,550 | $4,946 | 9% |
| Item | Quantity | R1Eagle Bridge CO | R2Sunesis Construction CO | R3Brumbaugh Construction INC | R4R B Jergens Contractors INC | R5Double Jay Construction INC | R6Complete General Construction Company | R7John R Jurgensen Company |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $12,500 | $22,600 | $28,000 | $20,853 | $18,802 | $20,000 | $40,269 |
| 202E23000 PAVEMENT REMOVED, (ASPHALT) | 842 SY | $22.00 | $35.06 | $12.00 | $23.75 | $9.40 | $30.00 | $26.58 |
| 202E30000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 624E10000 MOBILIZATION | 1 LS | $61,000 | $40,000 | $65,000 | $62,586 | $108,332 | $100,000 | $100,000 | 7% |
| 606E60023 IMPACT ATTENUATOR, TYPE 2 (UNIDIRECTIONAL), AS PER | 2 EACH | $30,000 | $28,500 | $35,000 | $30,635 | $31,920 | $31,830 | $33,172 | 6% |
| AA2 625E27507 LUMINAIRE, TEARDROP, SOLID STATE (LED), AS PER PLA | 22 EACH | $2,464 | $2,464 | $5,000 | $2,584 | $2,760 | $1,700 | $1,401 | 6% |
| 625E23100 NO. 2 AWG 600 VOLT DISTRIBUTION CABLE | 16,647 FT | $3.15 | $3.15 | $4.00 | $3.30 | $3.55 | $4.75 | $5.00 | 6% |
| 304E20000 AGGREGATE BASE | 474 CY | $110 | $124 | $72.00 | $66.68 | $74.00 | $110 | $164 | 6% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 144 CY | $315 | $560 | $350 | $607 | $404 | $315 | $560 | 5% |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 543 FT | $80.00 | $100 | $125 | $212 | $146 | $160 | $100 | 5% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (152 CY | $275 | $400 | $305 | $434 | $381 | $275 | $400 | 4% |
| 611E99114 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE D | 3 EACH | $13,500 | $19,737 | $14,175 | $9,645 | $17,725 | $19,000 | $13,863 | 4% |
| 625E29000 TRENCH | 2,392 FT | $16.50 | $16.50 | $14.00 | $17.31 | $18.50 | $10.00 | $9.75 | 4% |
| 503E31101 ROCK EXCAVATION, AS PER PLAN | 225 CY | $175 | $90.57 | $155 | $93.32 | $112 | $100 | $130 | 4% |
| 517E76300 RAILING, MISC.: MODIFIED BR-2-15 RAILING | 428 FT | $85.00 | $85.00 | $95.00 | $91.21 | $95.20 | $98.00 | $225 | 4% |
| 608E52000 CURB RAMP | 1,616 SF | $22.00 | $19.52 | $21.00 | $24.04 | $16.45 | $15.00 | $18.38 | 4% |
| 607E98000 FENCE, MISC.: 42" WOOD FENCE | 718 FT | $48.00 | $48.00 | $55.00 | $51.51 | $53.80 | $49.50 | $48.00 | 4% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 19 EACH | $1,750 | $1,750 | $1,600 | $1,836 | $1,960 | $3,000 | $1,779 | 4% |
| 611E07600 18" CONDUIT, TYPE C, REINFORCED CONCRETE PIPE, CLA | 180 FT | $165 | $197 | $95.00 | $136 | $115 | $200 | $201 | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $2,250 | $1,239 | $3,125 | $1,920 | $2,525 | $3,000 | $2,000 | 3% |
| 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE | 8 EACH | $3,250 | $3,500 | $4,400 | $7,205 | $4,585 | $6,000 | $3,500 | 3% |
| 1,192 SF |
| $2.50 |
| $4.46 |
| $3.00 |
| $3.97 |
| $1.85 |
| $5.00 |
| $3.55 |
| 202E32500 CURB AND GUTTER REMOVED | 259 FT | $7.50 | $10.93 | $15.00 | $11.57 | $11.20 | $12.00 | $18.09 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 157 FT | $11.00 | $17.89 | $8.00 | $57.21 | $17.10 | $30.00 | $36.70 |
| 202E38000 GUARDRAIL REMOVED | 712 FT | $2.00 | $5.00 | $6.00 | $5.37 | $5.60 | $3.00 | $7.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $275 | $665 | $250 | $879 | $491 | $800 | $774 |
| 202E98100 REMOVAL MISC.: INSPECTION WELL | 1 EACH | $450 | $757 | $700 | $460 | $556 | $600 | $720 |
| 202E98200 REMOVAL MISC.: CONDUIT | 70 FT | $7.00 | $8.15 | $14.00 | $29.97 | $20.80 | $20.00 | $57.63 |
| 203E10001 EXCAVATION, AS PER PLAN | 910 CY | $25.00 | $31.82 | $25.00 | $35.67 | $30.65 | $70.00 | $30.65 |
| 203E20000 EMBANKMENT | 715 CY | $20.00 | $24.57 | $25.00 | $26.42 | $28.90 | $12.00 | $28.55 |
| 204E10000 SUBGRADE COMPACTION | 2,397 SY | $6.00 | $6.17 | $2.00 | $2.72 | $2.15 | $6.00 | $2.53 |
| 204E13000 EXCAVATION OF SUBGRADE | 200 CY | $15.00 | $75.11 | $22.00 | $46.99 | $23.45 | $30.00 | $79.43 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 200 CY | $50.00 | $127 | $70.00 | $53.92 | $53.50 | $65.00 | $139 |
| 204E45000 PROOF ROLLING | 5 HOUR | $150 | $370 | $400 | $353 | $235 | $250 | $319 |
| 608E10000 4" CONCRETE WALK | 1,662 SF | $15.00 | $13.43 | $15.00 | $10.40 | $8.50 | $12.00 | $13.80 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET MAILBOX AND SU | 2 EACH | $225 | $884 | $650 | $407 | $335 | $250 | $595 |
| 601E34200 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER | 7 CY | $225 | $543 | $200 | $292 | $252 | $180 | $732 |
| 659E00300 TOPSOIL | 675 CY | $35.00 | $45.00 | $55.00 | $68.19 | $72.80 | $40.00 | $36.29 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 4,165 SY | $1.75 | $4.71 | $2.00 | $2.10 | $3.35 | $2.34 | $1.26 |
| 659E14000 REPAIR SEEDING AND MULCHING | 305 SY | $2.50 | $10.00 | $2.00 | $2.10 | $2.25 | $3.45 | $1.26 |
| 659E15000 INTER-SEEDING | 305 SY | $1.00 | $2.50 | $2.00 | $2.10 | $2.25 | $3.45 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.74 TON | $1,500 | $900 | $1,750 | $797 | $850 | $700 | $925 |
| 659E31000 LIME | 1.25 ACRE | $5.00 | $2.50 | $450 | $52.46 | $56.00 | $10.00 | $100 |
| 659E35000 WATER | 20 MGAL | $15.00 | $2.50 | $5.00 | $52.46 | $56.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 616 SY | $2.50 | $5.00 | $3.00 | $4.72 | $5.05 | $2.45 | $3.15 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,000 | $2,600 | $3,125 | $2,623 | $2,800 | $3,500 | $2,600 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $12,500 | $10,560 | $8,000 | $8,812 | $10,584 | $7,500 | $5,820 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,750 | $5,758 | $7,000 | $6,295 | $7,840 | $5,800 | $5,758 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 0.91 CY | $4,250 | $6,972 | $6,000 | $6,012 | $3,390 | $5,000 | $5,960 |
| 611E00400 4" CONDUIT, TYPE E | 40 FT | $20.00 | $31.55 | $45.00 | $46.33 | $41.15 | $19.00 | $51.78 |
| 611E04400 12" CONDUIT, TYPE B | 86 FT | $125 | $175 | $90.00 | $116 | $85.85 | $170 | $176 |
| 611E97400 CONDUIT, MISC.: TYPE E FOR DRAINAGE CONTINUANCE | 20 FT | $20.00 | $162 | $50.00 | $52.22 | $83.35 | $20.00 | $99.95 |
| 611E98690 CATCH BASIN, MISC.: TYPE 1 CB, AS PER PLAN | 1 EACH | $3,750 | $4,845 | $3,000 | $3,166 | $3,039 | $6,000 | $3,796 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 3 EACH | $1,250 | $1,871 | $800 | $860 | $502 | $750 | $1,581 |
| 611E99660 MANHOLE RECONSTRUCTED TO GRADE | 2 EACH | $1,750 | $1,616 | $2,500 | $3,143 | $1,070 | $1,250 | $4,149 |
| 611E99720 INSPECTION WELL | 1 EACH | $1,000 | $2,534 | $2,650 | $3,185 | $1,922 | $1,250 | $2,115 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1-1/4" | 1,225 SY | $3.65 | $8.51 | $4.00 | $8.41 | $11.70 | $3.65 | $7.00 |
| 407E20000 NON-TRACKING TACK COAT | 248 GAL | $1.00 | $5.00 | $1.00 | $5.42 | $11.20 | $1.00 | $5.00 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 349 FT | $50.00 | $70.16 | $85.00 | $36.42 | $51.75 | $65.00 | $72.85 |
| 609E26000 CURB, TYPE 6 | 84 FT | $40.00 | $58.03 | $70.00 | $54.63 | $54.90 | $60.00 | $61.63 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 18 CY | $350 | $306 | $250 | $336 | $193 | $250 | $630 |
| 625E00451 CONNECTION, FUSED PULL APART, AS PER PLAN | 66 EACH | $83.20 | $83.20 | $130 | $87.29 | $93.20 | $145 | $141 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 22 EACH | $77.19 | $77.19 | $150 | $80.98 | $86.50 | $145 | $139 |
| 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE | 10,209 FT | $1.08 | $1.08 | $2.20 | $1.13 | $1.25 | $2.50 | $2.95 |
| 625E23410 NO. 12 AWG POLE AND BRACKET CABLE | 4,307 FT | $0.35 | $0.35 | $0.60 | $0.37 | $0.40 | $1.25 | $2.05 |
| 625E25408 CONDUIT, 2", 725.051 | 897 FT | $1.20 | $1.20 | $4.20 | $1.26 | $1.35 | $9.00 | $5.05 |
| 625E25501 CONDUIT, 3", 725.04, AS PER PLAN | 490 FT | $30.37 | $22.50 | $24.00 | $23.60 | $25.20 | $56.00 | $53.70 |
| 625E25504 CONDUIT, 3", 725.051 | 1,404 FT | $2.29 | $2.29 | $4.50 | $2.40 | $2.60 | $14.00 | $19.15 |
| 625E25909 CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN, | 288 FT | $35.00 | $35.00 | $26.00 | $36.72 | $39.20 | $40.00 | $35.10 |
| 625E25909 CONDUIT, JACKED OR DRILLED, 725.052, AS PER PLAN, | 186 FT | $45.00 | $45.00 | $28.00 | $47.21 | $50.40 | $45.00 | $36.45 |
| 625E25930 CONDUIT, MISC.: CONDUIT EXPANSION/CONTRACTION FITT | 2 EACH | $25.00 | $25.00 | $500 | $26.23 | $28.00 | $1,100 | $273 |
| 625E29900 JUNCTION BOX | 3 EACH | $2,323 | $2,323 | $1,600 | $2,437 | $2,602 | $3,500 | $2,752 |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $550 | $550 | $850 | $577 | $616 | $1,400 | $960 |
| 625E32000 GROUND ROD | 23 EACH | $125 | $125 | $280 | $131 | $140 | $320 | $243 |
| 625E33001 STRUCTURE GROUNDING SYSTEM, AS PER PLAN | 1 EACH | $7,500 | $7,500 | $4,500 | $1,836 | $8,400 | $19,500 | $7,980 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $2,750 | $2,750 | $7,200 | $2,885 | $3,080 | $10,000 | $11,185 |
| 625E36010 UNDERGROUND WARNING MARKING TAPE | 2,392 FT | $1.25 | $1.25 | $0.60 | $1.31 | $1.40 | $1.50 | $1.45 |
| 632E69300 POWER CABLE, 3 CONDUCTOR, NO. 4 AWG | 37 FT | $5.25 | $5.25 | $22.00 | $5.51 | $5.90 | $10.00 | $6.70 |
| AA2 625E10481 LIGHT POLE, AESTHETIC, AS PER PLAN, 26', TLP BRACK | 3 EACH | $4,090 | $4,090 | $9,000 | $4,290 | $4,581 | $4,000 | $4,332 |
| 620E60000 DELINEATOR, POST SURFACE MOUNTED | 58 EACH | $49.50 | $49.50 | $55.00 | $113 | $118 | $110 | $83.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 89.5 FT | $15.50 | $15.50 | $17.00 | $25.80 | $27.00 | $17.00 | $17.50 |
| 630E08520 STREET NAME SIGN SUPPORT, NO. 3 POST | 34.5 FT | $15.50 | $15.50 | $17.00 | $26.87 | $28.00 | $19.00 | $21.50 |
| 630E80100 SIGN, FLAT SHEET | 32.5 SF | $16.00 | $16.00 | $18.00 | $32.25 | $33.60 | $24.40 | $24.25 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 6 EACH | $140 | $140 | $155 | $242 | $252 | $230 | $75.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 18 EACH | $20.00 | $20.00 | $22.00 | $21.50 | $23.00 | $10.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 14 EACH | $25.00 | $25.00 | $28.00 | $21.50 | $23.00 | $15.00 | $30.00 |
| 645E30000 REMOVAL OF PAVEMENT MARKINGS | 2,910 FT | $1.13 | $1.25 | $1.50 | $1.51 | $1.30 | $1.13 | $1.13 |
| 646E10000 EDGE LINE, 4" | 0.92 MILE | $4,300 | $2,825 | $4,775 | $5,750 | $4,820 | $4,300 | $4,300 |
| 646E10100 LANE LINE, 4" | 0.04 MILE | $3,600 | $1,130 | $4,000 | $4,814 | $4,030 | $3,600 | $3,600 |
| 646E10200 CENTER LINE | 0.6 MILE | $8,440 | $5,640 | $9,380 | $11,286 | $9,453 | $8,440 | $8,440 |
| 646E10300 CHANNELIZING LINE, 8" | 150 FT | $3.00 | $1.40 | $3.50 | $4.01 | $3.40 | $3.00 | $3.00 |
| 646E10510 CROSSWALK LINE, 12" | 348 FT | $5.00 | $6.50 | $5.50 | $6.69 | $5.60 | $5.00 | $5.00 |
| 646E10520 CROSSWALK LINE, 24" | 55 FT | $10.00 | $9.90 | $11.00 | $13.37 | $11.20 | $10.00 | $10.00 |
| 646E10600 TRANSVERSE/DIAGONAL LINE | 1,200 FT | $6.95 | $11.85 | $8.00 | $9.29 | $7.80 | $6.95 | $6.95 |
| 646E20300 LANE ARROW | 2 EACH | $350 | $175 | $390 | $468 | $392 | $350 | $350 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.06 MILE | $2,900 | $2,970 | $3,200 | $3,878 | $3,250 | $2,900 | $2,900 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.25 MILE | $5,800 | $6,825 | $6,400 | $7,756 | $6,500 | $5,800 | $5,800 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.33 MILE | $3,870 | $5,635 | $4,300 | $5,175 | $4,340 | $3,870 | $3,870 |
| 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, | 1 LS | $25,000 | $13,156 | $12,000 | $36,518 | $33,600 | $30,000 | $50,066 |
| 509E10000 EPOXY COATED STEEL REINFORCEMENT | 2,025 LB | $2.75 | $3.55 | $4.00 | $5.37 | $2.50 | $3.50 | $3.65 |
| 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS | 186 EACH | $20.00 | $26.47 | $30.00 | $18.29 | $39.50 | $60.00 | $38.25 |
| 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN | — | $20.00 | $48.30 | $14.00 | $40.95 | $49.30 | $20.00 | $20.00 |
| 518E12801 SCUPPER, MODIFICATION, AS PER PLAN | 8 EACH | $1,500 | $1,741 | $1,500 | $3,856 | $1,634 | $2,500 | $2,454 |
| 607E98000 FENCE, MISC.:PERIMETER GEOTEXTILE FENCE | 139 FT | $5.00 | $126 | $7.00 | $53.46 | $5.15 | $4.00 | $15.47 |
| 622E25000 CONCRETE BARRIER END SECTION, TYPE D | 2 EACH | $6,750 | $4,300 | $5,400 | $7,205 | $6,074 | $7,500 | $4,300 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 959 SY | $25.50 | $40.62 | $22.00 | $54.00 | $41.45 | $25.50 | $25.50 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $10,655 | $14,000 | $12,803 | $14,784 | $20,000 | $11,707 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $80,288 | $32,408 | $75,000 | $94,140 | $60,000 | $128,646 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $13,700 | $21,250 | $14,373 | $37,632 | $42,500 | $13,303 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E34448 CLASS QC2 CONCRETE, BRIDGE DECK (PARAPET) | 85 CY | $1,100 | $94k | 6% |
| AA2 625E10481 LIGHT POLE, AESTHETIC, AS PER PLAN, 27', TLP BRACK | 19 EACH | $4,582 | $87k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $61,000 | $61k | 4% |
| 606E60023 IMPACT ATTENUATOR, TYPE 2 (UNIDIRECTIONAL), AS PER | 2 EACH | $30,000 | $60k | 4% |
| AA2 625E27507 LUMINAIRE, TEARDROP, SOLID STATE (LED), AS PER PLA | 22 EACH | $2,464 | $54k | 4% |
| 625E23100 NO. 2 AWG 600 VOLT DISTRIBUTION CABLE | 16,647 FT | $3.15 | $52k | 4% |
| 304E20000 AGGREGATE BASE | 474 CY | $110 | $52k | 4% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 144 CY | $315 | $45k | 3% |
| 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D | 543 FT | $80 | $43k | 3% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (152 CY | $275 | $42k | 3% |